Description
-
Model List:
- D475A-5 Bull Dozer
- 1. COVER
- 2. FIELD ASSEMBLY INSTRUCTION
- 2.1. CONTENTS
- 2.2. SPECIFICATIONS
- 2.3. PRECAUTIONS FOR FIELD ASSEMBLY
- 2.4. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
- 2.5. LAYOUT OF KIT
- 2.6. STYLE FOR TRANSPORTATION
- 2.7. TOOLS LIST FOR FIELD ASSEMBLY
- 2.8. TIGHTENING TORQUE
- 2.9. COATING MATERIALS
- 2.10. ASSEMBLY PROCEDURE
- 2.10.1. A1 Installation of undercarriage
- 2.10.2. A2 Installation of ripper
- 2.10.3. A3 Installation of tracks
- 2.10.4. A4 Adding oil to pivot chamber
- 2.10.5. A5 Installation of ripper shank
- 2.10.6. A6 Installation of blade lift cylinder
- 2.10.7. A7 Installation of trunnion
- 2.10.8. A8 Assembly of blade
- 2.10.9. A9 Adjustment of arm joint (Ublade)
- 2.10.10. A10 Installation of blade
- 2.10.11. A11 Installation of counterweight
- 2.10.12. A12 Installation of operators cab
- 2.10.13. A13 Installation of ROPS
- 2.10.14. A14 Adjustment of potentiometer rod
- 2.10.15. A15 Procedure for adjusting blade tilt angle limit
- 2.10.16. A16 Method of checking autoreset system (Superdozer)
- 2.10.17. A17 Check track tension
- 2.10.18. A18 Checking oil/coolant levels
- 2.10.19. A19 Greasing of greasing point
- 2.10.20. A20 Installation of ORBCOMM antenna and wiring harness
- 2.10.21. A21 Replacement of return filter (Replacement of standard filter with flushing filter)
- 2.10.22. A22 Installing direction of exhaust pipe
- 2.10.23. A23 Bleeding air from hydraulic cylinders
- 2.10.24. A24 Installing lunchbox band (if equipped)
- 2.11. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
- 2.11.1. M1 Check and adjustment of operators cab
- 2.11.2. M2 Error code
- 2.11.3. M3 Flushing of hydraulic circuit
- 2.12. APPENDIX 1. INSTALLATION OF SPILL GUARDS
- 2.13. APPENDIX 2. PRECAUTIONS FOR INITIALIZATION PROCEDURES FOR VHMS CONTROLLER
- 2.14. FIELD ASSEMBLY INSPECTION REPORT (UDOZER SPECIFICATION)
- 2.15. FIELD ASSEMBLY INSPECTION REPORT (SUPERDOZER SPECIFICATION)