Komatsu D475A-5 Bull Dozer Field Assembly Instruction GEN00012-05

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00012-05
  • Format: PDF
  • Size: 7.6MB
  • Number of Pages: 189

Description

  • Model List:

    • D475A-5 Bull Dozer
  • 1. COVER
  • 2. FIELD ASSEMBLY INSTRUCTION
  • 2.1. CONTENTS
  • 2.2. SPECIFICATIONS
  • 2.3. PRECAUTIONS FOR FIELD ASSEMBLY
  • 2.4. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENT, AND SCHEDULE
  • 2.5. LAYOUT OF KIT
  • 2.6. STYLE FOR TRANSPORTATION
  • 2.7. TOOLS LIST FOR FIELD ASSEMBLY
  • 2.8. TIGHTENING TORQUE
  • 2.9. COATING MATERIALS
  • 2.10. ASSEMBLY PROCEDURE
  • 2.10.1. A1 Installation of undercarriage
  • 2.10.2. A2 Installation of ripper
  • 2.10.3. A3 Installation of tracks
  • 2.10.4. A4 Adding oil to pivot chamber
  • 2.10.5. A5 Installation of ripper shank
  • 2.10.6. A6 Installation of blade lift cylinder
  • 2.10.7. A7 Installation of trunnion
  • 2.10.8. A8 Assembly of blade
  • 2.10.9. A9 Adjustment of arm joint (Ublade)
  • 2.10.10. A10 Installation of blade
  • 2.10.11. A11 Installation of counterweight
  • 2.10.12. A12 Installation of operators cab
  • 2.10.13. A13 Installation of ROPS
  • 2.10.14. A14 Adjustment of potentiometer rod
  • 2.10.15. A15 Procedure for adjusting blade tilt angle limit
  • 2.10.16. A16 Method of checking autoreset system (Superdozer)
  • 2.10.17. A17 Check track tension
  • 2.10.18. A18 Checking oil/coolant levels
  • 2.10.19. A19 Greasing of greasing point
  • 2.10.20. A20 Installation of ORBCOMM antenna and wiring harness
  • 2.10.21. A21 Replacement of return filter (Replacement of standard filter with flushing filter)
  • 2.10.22. A22 Installing direction of exhaust pipe
  • 2.10.23. A23 Bleeding air from hydraulic cylinders
  • 2.10.24. A24 Installing lunchbox band (if equipped)
  • 2.11. CHECK AND MAINTENANCE PROCEDURES AFTER COMPLETION OF ASSEMBLY
  • 2.11.1. M1 Check and adjustment of operators cab
  • 2.11.2. M2 Error code
  • 2.11.3. M3 Flushing of hydraulic circuit
  • 2.12. APPENDIX 1. INSTALLATION OF SPILL GUARDS
  • 2.13. APPENDIX 2. PRECAUTIONS FOR INITIALIZATION PROCEDURES FOR VHMS CONTROLLER
  • 2.14. FIELD ASSEMBLY INSPECTION REPORT (UDOZER SPECIFICATION)
  • 2.15. FIELD ASSEMBLY INSPECTION REPORT (SUPERDOZER SPECIFICATION)
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu D475A-5 Bull Dozer Field Assembly Instruction GEN00012-05”

Your email address will not be published. Required fields are marked *