Komatsu D575A-3 Super Dozer Field Assembly Instruction SEAW002700

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: SEAW002700
  • Format: PDF
  • Size: 6.9MB
  • Number of Pages: 93

Description

  • Model List:

    • D575A-3 Super Dozer
  • 1. COVER
  • 2. CONTENTS
  • 3. ASSEMBLY PROCEDURE TIME SCHEDULE (TRANSPORTED DISASSEMBLEDWEIGHTS LESS THAN 50 TONS)
  • 4. EQUIPMENT AND TOOLS TO BE USED
  • 5. ASSEMBLY MAP FOR D575A3 SUPER DOZER
  • 6. TRANSPORTATION POSTURE
  • 7. INSTALLATION PROCEDURE
  • 7.1. UNLOADING BARE MACHINE
  • 7.2. INSTALLATION OF OPERATING CABIN
  • 7.3. INSTALLATION OF FOODS EXHAUST PIPE
  • 7.4. INSTALLATION OF PIVOT SHAFT
  • 7.5. INSTALLATION OF FINAL DRIVE
  • 7.6. INSTALLATION REMOVAL OF CYLINDER SUPPORT
  • 7.7. INSTALLATION OF UNDERCARRIAGE
  • 7.8. INSTALLATION OF TRACK SHOE ASSEMBLY TRUNNION
  • 7.9. INSTALLATION OF BLADE CYLINDER STAY
  • 7.10. ASSEMBLE OF BLADE ASSEMBLY
  • 7.11. INSTALLATION OF COUNTER WEIGHT
  • 7.12. INSTALLATION OF ROPS
  • 7.13. INSTALLATION OF HEAD LAMP
  • 7.14. INSTALLATION OF HANDRAILS
  • 7.15. INSTALLATION OF BLADE ASSEMBLY
  • 7.16. INSTALLATION OF POTENTIOMETER
  • 7.17. ADJUSTMENT OF TRACK TENSION ALIGNMENT FOR CARRIER ROLLER
  • 7.18. LUBRICATING ITEMS
  • 8. PROCEDURE MANUAL FOR INITIAL SETTING TILT LIMIT
  • 9. HOW TO CHECK AUTOMATIC RESETTING TO SYSTEM
  • 10. BLEEDING AIR FROM HYDRAULIC CYLINDER
  • 11. TABLE OF FUEL COOLANT AND LUBRICANTS
  • 12. COATING MATERIALS
  • 13. STANDARD TIGHTENING TORQUE
  • 14. WEAR PARTS LIST
  • 15. HOW TO CHECK ERROR CODE
  • 16. ERROR CODE LIST
  • 17. ANNEX DATE 1. ASSEMBLY JIG DRAWING
  • 18. ANNEX DATE 2. INSTALLATION OF SPILL GUARD TO THE SUPPER BLADE
  • 19. FIELD ASSEMBLY INSPECTION REPORT
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu D575A-3 Super Dozer Field Assembly Instruction SEAW002700”

Your email address will not be published. Required fields are marked *