Komatsu D75S-5 Crawler Loader Operation and Maintenance Manual SEAM010001

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM010001
  • Format: PDF
  • Size: 3.9MB
  • Number of Pages: 189

Description

  • Model List:

    • D75S-5 Crawler Loader
  • 1. MAIN MENU
  • 2. COVER
  • 3. FOREWORD
  • 4. SAFETY INFORMATION
  • 5. INTRODUCTION
  • 6. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 7. CONTENTS
  • 8. SAFETY
  • 8.1. GENERAL PRECAUTIONS
  • 8.2. PRECAUTIONS DURING OPERATION
  • 8.2.1. BEFORE STARTING ENGINE
  • 8.2.2. AFTER STARTING ENGINE
  • 8.2.3. TRANSPORTATION
  • 8.2.4. BATTERY
  • 8.2.5. TOWING
  • 8.3. PRECAUTIONS FOR MAINTENANCE
  • 8.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 8.3.2. DURING MAINTENANCE
  • 8.4. POSITION FOR ATTACHING SAFETY LABELS
  • 8.4.1. POSITION FOR ATTACHING SAFETY LABELS
  • 9. OPERATION
  • 9.1. GENERAL VIEW
  • 9.1.1. GENERAL VIEW OF MACHINE
  • 9.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 9.2. EXPLANATION OF COMPONENTS
  • 9.2.1. METERS AND LAMPS
  • 9.2.2. SWITCHES
  • 9.2.3. CONTROL LEVERS, PEDALS
  • 9.2.4. FUSE BOX
  • 9.2.5. DUST INDICATOR
  • 9.2.6. POWER PICKUP CONNECTOR
  • 9.2.7. LIFT ARM STAY
  • 9.2.8. MANUAL POCKET
  • 9.3. OPERATION
  • 9.3.1. CHECK BEFORE STARTING ENGINE
  • 9.3.2. STARTING ENGINE
  • 9.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 9.3.4. MOVING MACHINE OFF
  • 9.3.5. SHIFTING GEAR
  • 9.3.6. SHIFTING BETWEEN FORWARD AND REVERSE
  • 9.3.7. STEERING MACHINE
  • 9.3.8. STOPPING MACHINE
  • 9.3.9. PRECAUTIONS FOR OPERATION
  • 9.3.10. WORK POSSIBLE USING DOZER SHOVEL
  • 9.3.11. HOW TO USE INCHING PEDAL
  • 9.3.12. PARKING MACHINE
  • 9.3.13. CHECK AFTER FINISHING WORK
  • 9.3.14. STOPPING ENGINE
  • 9.3.15. CHECK AFTER STOPPING ENGINE
  • 9.3.16. TIPS FOR LONGER UNDERCARRIAGE LIFE
  • 9.4. TRANSPORTATION
  • 9.4.1. LOADING, UNLOADING WORK
  • 9.4.2. PRECAUTIONS FOR LOADING, AND SECURING THE MACHINE
  • 9.4.3. LIFTING THE MACHINE
  • 9.4.4. PRECAUTIONS FOR TRANSPORTATION
  • 9.5. COLD WEATHER OPERATION
  • 9.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 9.5.2. AFTER COMPLETION OF WORK
  • 9.5.3. AFTER COLD WEATHER
  • 9.6. LONGTERM STORAGE
  • 9.6.1. BEFORE STORAGE
  • 9.6.2. DURING STORAGE
  • 9.6.3. AFTER STORAGE
  • 9.7. TROUBLESHOOTING
  • 9.7.1. AFTER RUNNING OUT OF FUEL
  • 9.7.2. IF BATTERY IS DISCHARGED
  • 9.7.3. OTHER TROUBLE
  • 10. MAINTENANCE
  • 10.1. GUIDES TO MAINTENANCE
  • 10.2. OUTLINES OF SERVICE
  • 10.2.1. OUTLINE OF OIL, FUEL, COOLANT
  • 10.2.2. RELATING TO ELECTRIC SYSTEM
  • 10.3. WEAR PARTS LIST
  • 10.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 10.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 10.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 10.5.2. TORQUE LIST
  • 10.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 10.7. MAINTENANCE SCHEDULE CHART
  • 10.8. SERVICE PROCEDURE
  • 10.8.1. INITIAL 250 HOURS SERVICE
  • 10.8.2. WHEN REQUIRED
  • 10.8.3. CHECK BEFORE STARTING
  • 10.8.4. EVERY 40 HOURS SERVICE
  • 10.8.5. EVERY 250 HOURS SERVICE
  • 10.8.6. EVERY 500 HOURS SERVICE
  • 10.8.7. EVERY 1000 HOURS SERVICE
  • 10.8.8. EVERY 2000 HOURS SERVICE
  • 10.8.9. EVERY 4000 HOURS SERVICE
  • 11. SPECIFICATIONS
  • 11.1. SPECIFICATIONS
  • 12. OPTIONS, ATTACHMENTS
  • 12.1. INSTALLATION OF FIRE EXTINGUISHER
  • 12.2. HANDLING WITH CABIN INSTALLED
  • 12.2.1. HOW TO READ LAMPS AND USE SWITCHES
  • 12.2.2. FUSE BOX
  • 12.2.3. DOOR LOCK
  • 12.2.4. WHEN RQUIRED
  • 12.2.5. PRECAUTIONS FOR WORK
  • 12.3. OPERATION OF AIRCONDITIONER
  • 12.3.1. NAME OF EACH PART OF CONTROL PANEL
  • 12.3.2. OPERATION METHOD
  • 12.3.3. PRECAUTIONS FOR USE OF AIRCONDITIONER
  • 12.3.4. INSPECTION AND MAINTENANCE
  • 12.4. GENERAL PRECAUTIONS
  • 12.4.1. SAFETY PRECAUTIONS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu D75S-5 Crawler Loader Operation and Maintenance Manual SEAM010001”

Your email address will not be published. Required fields are marked *