Description
-
Model List:
- PC1250-11 Hydraulic Excavator
- PC1250LC-11 Hydraulic Excavator
- PC1250SP-11 Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 2.1. CONTENTS
- 2.2. READ THIS MANUAL
- 2.3. SAFETY INFORMATION
- 2.4. INTRODUCTION
- 2.5. ENGINE TECHNOLOGY TO CONFORM EXHAUST GAS EMISSION
- 2.6. PRODUCT INFORMATION
- 2.7. ABBREVIATION LIST
- 3. SAFETY
- 3.1. SAFETY LABELS
- 3.2. GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
- 3.3. PRECAUTIONS FOR OPERATION
- 3.4. PRECAUTIONS FOR MAINTENANCE
- 4. OPERATION
- 4.1. GENERAL VIEW
- 4.2. EXPLANATION OF COMPONENTS
- 4.3. MACHINE OPERATIONS AND CONTROLS
- 4.4. HANDLE AIR CONDITIONER
- 4.5. HANDLING RADIO
- 4.6. KomVision
- 4.7. HANDLE ANCHOR POINT FOR TIEOFF
- 4.8. TRANSPORTATION
- 4.9. COLD WEATHER OPERATION
- 4.10. PRECAUTIONS FOR LONGTERM STORAGE
- 4.11. TROUBLES AND ACTIONS
- 5. MAINTENANCE
- 5.1. PRECAUTIONS FOR MAINTENANCE
- 5.2. OUTLINE OF MAINTENANCE
- 5.3. STANDARD TIGHTENING TORQUE FOR BOLTS AND NUTS
- 5.4. MAINTENANCE SCHEDULE
- 5.5. MAINTENANCE PROCEDURE
- 6. SPECIFICATIONS
- 6.1. SPECIFICATIONS
- 7. ATTACHMENTS AND OPTIONS
- 7.1. PRECAUTIONS FOR USING ATTACHMENT AND OPTIONS
- 7.2. ATTACHMENTS AND OPTIONS
- 7.3. HANDLE THE HYDRAULICALLY OPERATED STAIRWAY
- 7.4. RADIO(Bluetooth)
- 8. MACHINE WITH LOADING SHOVEL SPECIFICATION
- 8.1. EXPLANATION OF COMPONENTS
- 8.2. MACHINE OPERATIONS AND CONTROLS
- 8.3. RECOMMENDED APPLICATIONS
- 8.4. PRECAUTIONS WHEN YOU DISASSEMBLE MACHINE
- 8.5. TRANSPORTATION
- 8.6. CONSUMABLE PARTS
- 8.7. PERIODIC MAINTENANCE
- 8.8. EVERY 10 HOURS MAINTENANCE
- 8.9. EVERY 5000 HOURS MAINTENANCE
- 8.10. EVERY 6 MONTHS MAINTENANCE
- 8.11. SPECIFICATIONS PC125011
- 8.12. COMBINATION OF WORK EQUIPMENT
- 9. REPLACEMENT PARTS
- 9.1. DEFINED LIFE PARTS
- 9.2. CONSUMABLE PARTS
- 9.3. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 10. INDEX
















Reviews
There are no reviews yet.