Komatsu PC210-6K, PC210LC-6K, PC240LC-6K, PC240NLC-6K Hydraulic Excavator Operation and Maintenance Manual EEAM006011

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: EEAM006011
  • Format: PDF
  • Size: 10.7MB
  • Number of Pages: 301

Description

  • Model List:

    • PC210-6K Hydraulic Excavator
    • PC210LC-6K Hydraulic Excavator
    • PC240LC-6K Hydraulic Excavator
    • PC240NLC-6K Hydraulic Excavator
  • 1. FOREWORD
  • 2. SAFETY INFORMATION
  • 2.1. SAFETY MESSAGES
  • 2.2. NOISE PC210, PC210LC6K
  • 2.3. NOISE PC240LC, PC240NLC6K
  • 2.4. VIBRATION
  • 3. INTRODUCTION
  • 3.1. INTENDED USE
  • 3.2. FEATURES
  • 3.3. BREAKING IN YOUR NEW MACHINE
  • 4. LOCATION OF PLATES, TABLES TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 4.1. MACHINE SERIAL NO. PLATE POSITION
  • 4.2. ENGINE SERIAL NO. PLATE POSITION
  • 4.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 4.4. MACHINE SERIAL PLATE.
  • 5. SAFETY
  • 5.1. GENERAL PRECAUTIONS
  • 5.2. PRECAUTIONS DURING OPERATION
  • 5.2.1. BEFORE STARTING ENGINE
  • 5.2.2. OPERATING MACHINE
  • 5.2.3. TRANSPORTATION
  • 5.2.4. BATTERY
  • 5.2.5. TOWING
  • 5.2.6. BUCKET WITH HOOK
  • 5.3. PRECAUTIONS FOR MAINTENANCE
  • 5.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 5.3.2. DURING MAINTENANCE
  • 5.4. POSITION FOR ATTACHING SAFETY LABELS
  • 5.4.1. POSITION FOR ATTACHING SAFETY LABELS
  • 6. OPERATION
  • 6.1. GENERAL VIEW
  • 6.1.1. GENERAL VIEW OF MACHINE
  • 6.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 6.2. EXPLANATION OF COMPONENTS
  • 6.2.1. MACHINE MONITOR
  • 6.2.2. METERS
  • 6.2.3. SWITCHES
  • 6.2.4. CONTROL LEVERS, PEDALS
  • 6.2.5. AIR CONDITIONER
  • 6.2.6. CAB RADIO
  • 6.2.7. FUSE
  • 6.2.8. FUSIBLE LINK
  • 6.2.9. CONTROLLERS
  • 6.2.10. TOOL BOX
  • 6.2.11. REFUELLING PUMP
  • 6.2.12. HANDLING THE ACCUMULATOR
  • 6.3. OPERATION
  • 6.3.1. CHECK BEFORE STARTING ENGINE
  • 6.3.2. STARTING ENGINE
  • 6.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 6.3.4. MOVING MACHINE OFF
  • 6.3.5. STEERING MACHINE
  • 6.3.6. STOPPING MACHINE
  • 6.3.7. SWINGING
  • 6.3.8. OPERATION OF WORK EQUIPMENT
  • 6.3.9. HANDLING ACTIVE MODE
  • 6.3.10. WORKING MODE SELECTION
  • 6.3.11. PROHIBITIONS FOR OPERATION
  • 6.3.12. PRECAUTIONS FOR OPERATION
  • 6.3.13. PRECAUTIONS WHEN TRAVELLING UP OR DOWN HILLS
  • 6.3.14. HOW TO ESCAPE FROM MUD
  • 6.3.15. WORK POSSIBLE USING HYDRAULIC EXCAVATOR
  • 6.3.16. REPLACEMENT AND INVERSION OF BUCKET
  • 6.3.17. PARKING THE MACHINE
  • 6.3.18. CHECK AFTER FINISHING WORK
  • 6.3.19. STOPPING ENGINE
  • 6.3.20. CHECK AFTER STOPPING ENGINE
  • 6.4. TRANSPORTATION
  • 6.4.1. LOADING, UNLOADING WORK
  • 6.5. COLD WEATHER OPERATION
  • 6.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 6.5.2. PRECAUTIONS AFTER COMPLETION OF WORK
  • 6.6. LONGTERM STORAGE
  • 6.6.1. BEFORE STORAGE
  • 6.6.2. DURING STORAGE
  • 6.6.3. AFTER STORAGE
  • 6.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
  • 6.7. TROUBLESHOOTING
  • 6.7.1. PHENOMENA THAT ARE NOT FAILURES
  • 6.7.2. METHOD OF TOWING MACHINE
  • 6.7.3. USING METHOD FOR LIGHTWEIGHT TOWING HOLE
  • 6.7.4. PRECAUTIONS ON PARTICULAR JOBSITES
  • 6.7.5. IF BATTERY IS DISCHARGED
  • 6.7.6. OTHER TROUBLE
  • 6.8. OPERATION INSTRUCTIONS FOR HIGH REACH WORK EQUIPMENT FOR PC2406
  • 6.8.1. PRECAUTIONS WHEN OPERATING
  • 6.8.2. CHECK BEFORE STARTING
  • 6.8.3. OPERATION
  • 6.8.4. RAISING WORK EQUIPMENT
  • 6.8.5. WORKING RANGE AND USING RANGE OF BOOM
  • 6.8.6. WORKING RANGE AND RANGE OF USE OF BOOM
  • 6.8.7. TRANSPORTATION (HIGH REACH DEMOLITION)
  • 7. MAINTENANCE
  • 7.1. GUIDES TO MAINTENANCE
  • 7.2. OUTLINES OF SERVICE
  • 7.2.1. OUTLINE OF OIL, FUEL, COOLANT
  • 7.2.2. EXPLANATION OF LUBRICATION CHART DECAL
  • 7.2.3. OUTLINE OF ELECTRICAL SYSTEM
  • 7.2.4. OUTLINE OF HYDRAULIC SYSTEM
  • 7.3. WEAR PARTS LIST
  • 7.4. USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 7.4.1. PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
  • 7.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 7.5.1. LIST OF NECESSARY TOOLS
  • 7.5.2. TORQUE LIST
  • 7.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 7.7. MAINTENANCE SCHEDULE CHART
  • 7.7.1. MAINTENANCE SCHEDULE CHART
  • 7.7.2. MAINTENANCE WHEN USING HYDRAULIC BREAKER
  • 7.8. SERVICE PROCEDURE
  • 7.8.1. INITIAL 250 HOURS SERVICE
  • 7.8.2. WHEN REQUIRED
  • 7.8.3. CHECK BEFORE STARTING
  • 7.8.4. EVERY 100 HOURS SERVICE
  • 7.8.5. EVERY 250 HOURS SERVICE
  • 7.8.6. EVERY 500 HOURS SERVICE
  • 7.8.7. EVERY 1000 HOURS SERVICE
  • 7.8.8. EVERY 2000 HOURS SERVICE
  • 7.8.9. EVERY 4000 HOURS SERVICE
  • 7.8.10. EVERY 5000 HOURS SERVICE
  • 8. SPECIFICATIONS
  • 8.1. SPECIFICATIONS
  • 8.1.1. PC2106K, PC210LC6K
  • 8.2. SPECIFICATIONS
  • 8.2.1. PC240LC6K, PC240NLC6K
  • 8.2.2. explanation of LIFTING CAPACITY CHART
  • 9. OPTIONS, ATTACHMENTS
  • 9.1. PRECAUTIONS RELATED TO SAFETY
  • 9.1.1. PRECAUTIONS WHEN INSTALLING ATTACHMENTS
  • 9.2. HANDLING BUCKET WITH HOOK
  • 9.2.1. CHECKING FOR DAMAGE TO BUCKET WITH HOOK
  • 9.2.2. PROHIBITED OPERATIONS
  • 9.2.3. PRECAUTIONS DURING OPERATIONS
  • 9.3. MACHINES READY FOR ATTACHMENTS
  • 9.3.1. EXPLANATION OF COMPONENTS
  • 9.3.2. ATTACHMENT MOUNTING/DISMOUNTING PROCEDURE
  • 9.4. INTRODUCTION OF ATTACHMENTS
  • 9.4.1. SPECIFICATION, USE
  • 9.4.2. ATTACHMENT INSTALLATION COMBINATION TABLE
  • 9.4.3. SELECTION OF TRACK SHOES
  • 9.4.4. SELECTION OF BUCKET TEETH
  • 9.4.5. HANDLING TRAPEZOIDAL BUCKET
  • 9.4.6. USING THE EXTENSION ARM
  • 9.4.7. HANDLING THE CLAMSHELL BUCKET
  • 9.5. EXTENDING MACHINE SERVICE LIFE
  • 9.5.1. HYDRAULIC BREAKER
  • 9.5.2. POWER RIPPER
  • 9.5.3. MAIN FIELDS OF APPLICATIONS
  • 9.5.4. FORK GRAB
  • 9.5.5. GRAPPLE BUCKET
  • 9.5.6. SCRAP GRAPPLE
  • 9.5.7. CRUSHER SMASHER
  • 9.5.8. HYDRAULIC PILE DRIVER
  • 9.5.9. HYDRAULIC EXCAVATOR WITH MULTIPURPOSE CRANE
  • 9.5.10. PC BOOM
  • 9.5.11. M STRAIGHT BOOM
  • 9.5.12. FRONT DOZER BLADE
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC210-6K, PC210LC-6K, PC240LC-6K, PC240NLC-6K Hydraulic Excavator Operation and Maintenance Manual EEAM006011”

Your email address will not be published. Required fields are marked *