Description
-
Model List:
- PC4000E-6 Hydraulic Mining Shovel
- 1. SAFETY
- 1.1. SAFETY INFORMATION
- 1.2. OVERVIEW
- 1.3. SOUND PRESSURE LEVEL IN THE OPERATORS CAB.
- 1.4. GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
- 1.5. PRECAUTION FOR MAINTENANCE
- 1.6. ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
- 1.7. SPECIAL SAFETY EQUIPMENT
- 1.8. ADDITIONAL SAFETY PRECAUTIONS
- 2. GENERAL
- 2.1. GENERAL
- 2.2. ASSEMBLY SITE REQUIREMENTS
- 2.3. GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
- 3. ASSEMBLY SEQUENCE
- 3.1. ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
- 3.2. ASSEMBLY SEQUENCE OF BACKHOE MACHINES
- 3.3. ASSEMBLY OF UNDERCARRIAGE
- 3.4. MOUNTING OF THE CABLE DRUM
- 3.5. MOUNTING OF THE CABLE GUIDE
- 3.6. MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
- 3.7. MOUNTING OF THE MACHINERY HOUSE RAILINGS
- 3.8. MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
- 3.9. MOUNTING OF THE HIGH VOLTAGE CABINET
- 3.10. MOUNTING OF BATTERY BOX AND HYDRAULIC ACCESS LADDER
- 3.11. PREASSEMBLY OF FACE SHOVEL BOOM
- 3.12. PREASSEMBLY OF BACKHOE BOOM
- 3.13. MOUNTING OF THE COUNTERWEIGHT
- 3.14. HIGH VOLTAGE INTERLOCK SAFETY SWITCHES
- 3.15. CONNECT HIGH VOLTAGE CABLES AND CONTROL CABLES ON MACHINES WITH CABLE DRUM
- 3.16. CONNECT HIGH VOLTAGE CABLES ON MACHINES WITH CABLE GUIDE
- 3.17. CONNECT THE POWER CABLES INSIDE THE HIGH VOLTAGE SWITCH CABINET
- 3.18. CONNECT THE AIR CONDITIONER HOSES TO THE HIGH VOLTAGE SWITCH CABINET
- 3.19. MOUNTING OF THE CAB BASE
- 3.20. ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
- 3.21. CONNECTING THE HIGH PRESSURE LINES OF THE MAIN PUMPS
- 3.22. ATTACHING THE HYDRAULIC OIL RESERVOIR
- 3.23. ATTACHING THE HYDRAULIC OIL COOLER
- 3.24. CONNECTING SWING GEAR HYDRAULIC LINES
- 3.25. CONNECTING THE LEAKAGE AND PRESSURE HOSES FROM VALVE BLOCK
- 3.26. CONNECTING THE HOSE LINES OF THE TRANSFER PUMP
- 3.27. CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
- 3.28. ATTACHING THE HANDRAILS, CATWALKS AND STEPS
- 3.29. CENTRAL REFILLING SYSTEM
- 3.30. CONNECTING THE GREASE LINES OF THE AUTOMATIC LUBRICATION SYSTEMS
- 3.31. PRECHECKS PRIOR TO INITIAL START UP
- 3.32. HIGH VOLTAGE INTERLOCK SYSTEM
- 3.33. CHECKING DIRECTION OF MOTOR ROTATION
- 3.34. CHECK AND ADJUST ALIGNMENT OF MAIN MOTOR
- 3.35. FILLING AND BLEEDING THE HYDRAULIC SYSTEM
- 3.36. ASSEMBLY FACE SHOVEL ATTACHMENT
- 3.37. BLEEDING HYDRAULIC CIRCUITS
- 3.38. ATTACHING FACE SHOVEL TO THE STICK
- 3.39. ASSEMBLY BACKHOE ATTACHMENT
- 3.40. BLEEDING HYDRAULIC CIRCUITS
- 3.41. ATTACHING BACKHOE BUCKET TO THE STICK
- 3.42. BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
- 4. FINAL CHECKS AND ADJUSTMENTS
- 4.1. COMMISSIONING CHECK LIST
- 4.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
- 4.3. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
- 4.4. PRESSURE COMPENSATION OF SEALED COMPONENTS
- 4.5. PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
- 4.6. COMMISSIONING OF THE AIR CONDITIONING
- 4.7. PERFORM THE PMCLINIC ACCORDING TO THE PMCLINIC PROCEDURE MANUAL
- 4.8. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
- 5. ORBCOMM INITIALIZATION
- 5.1. ORBCOMM TERMINAL ACTIVATION
- 5.2. WEBCARE BASIC INFORMATION FOR MACHINE REGISTRATION
- 6. DISASSEMBLY OF THE MACHINE
- 6.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
- 6.2. GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE DRUM
- 6.3. GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE GUIDE
- 6.4. DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
- 6.5. DISASSEMBLY SEQUENCE OF BACKHOE MACHINES
- 6.6. DISPOSAL OF WASTE MATERIAL