Komatsu PC40MRX-1, PC45MRX-1 Hydraulic Excavator Operation and Maintenance Manual SEAM043000T

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM043000T
  • Format: PDF
  • Size: 6.2MB
  • Number of Pages: 230

Description

  • Model List:

    • PC40MRX-1 Hydraulic Excavator
    • PC45MRX-1 Hydraulic Excavator
  • 1. MAIN MENU
  • 2. COVER
  • 3. FOREWORD
  • 3.1. FOREWORD
  • 3.2. SAFETY INFORMATION
  • 3.3. INTRODUCTION
  • 3.3.1. DIRECTIONS OF MACHINE
  • 3.4. PRODUCT INFORMATION
  • 3.4.1. MACHINE SERIAL NUMBER PLATE AND ITS LOCATION
  • 3.4.2. ENGINE SERIAL NUMBER PLATE AND ITS LOCATION
  • 3.4.3. EMISSION CONTROL INFORMATION LABEL AND ITS LOCATION
  • 3.4.4. SERVICE METER LOCATION
  • 3.4.5. YOUR MACHINE SERIAL NUMBERS AND DISTRIBUTOR
  • 4. CONTENTS
  • 5. SAFETY
  • 5.1. SAFETY INFORMATION
  • 5.2. WARNING LABELS AND PICTOGRAMS
  • 5.2.1. WARNING LABELS AND PICTOGRAMS LOCATION
  • 5.2.2. WARNING LABELS AND PICTOGRAMS ACTUAL
  • 5.3. SAFETY INFORMATION
  • 5.4. SAFETY MACHINE OPERATION
  • 5.4.1. STARTING ENGINE
  • 5.4.2. OPERATION
  • 5.4.3. TRANSPORTATION
  • 5.4.4. BATTERY
  • 5.4.5. TOWING
  • 5.4.6. LIFTING OBJECTS WITH BUCKET
  • 5.5. SAFETY MAINTENANCE INFORMATION
  • 6. OPERATION
  • 6.1. MACHINE VIEW ILLUSTRATIONS
  • 6.1.1. OVERALL MACHINE VIEW
  • 6.1.2. CONTROLS AND GAUGES
  • 6.2. DETAILED CONTROL AND GAUGES
  • 6.2.1. MONITORING SYSTEM
  • 6.2.2. SWITCHES
  • 6.2.3. CONTROL LEVERS AND PEDALS
  • 6.2.4. WINDSHEILD
  • 6.2.5. SLIDING DOOR
  • 6.2.6. SLIDING WINDOW
  • 6.2.7. REAR WINDOW
  • 6.2.8. EMERGENCY ESCAPE HAMMER
  • 6.2.9. AUXILARY ELECTRIC POWER
  • 6.2.10. OPERATION MANUAL STORAGE
  • 6.2.11. TOOL BOX
  • 6.2.12. GREASE PUMP HOLDER
  • 6.2.13. ASHTRAY
  • 6.3. MACHINE OPERATIONS AND CONTROLS
  • 6.3.1. BEFORE STARTING ENGINE
  • 6.3.2. STARTING ENGINE
  • 6.3.3. AFTER STARTING ENGINE
  • 6.3.4. STOPPING THE ENGINE
  • 6.3.5. CHECK AFTER SHUT OFF ENGINE
  • 6.3.6. MACHINE OPERATION
  • 6.3.7. STEERING THE MACHINE
  • 6.3.8. SWINGING
  • 6.3.9. WORK EQUIPMENT CONTROLS AND OPERATIONS
  • 6.3.10. PROHIBITED OPERATIONS
  • 6.3.11. GENERAL OPERATION INFORMATION
  • 6.3.12. TRAVELING ON SLOPES
  • 6.3.13. ESCAPE FROM MUD
  • 6.3.14. RECOMMENDED APPLICATIONS
  • 6.3.15. BUCKET REPLACEMENT
  • 6.3.16. PARKING MACHINE
  • 6.3.17. MACHINE INSPECTION AFTER DAILY WORK
  • 6.3.18. LOCKING
  • 6.3.19. RUBBER SHOES AND ROAD LINERS
  • 6.4. TRANSPORTATION
  • 6.4.1. TRANSPORTATION PROCEDURE
  • 6.4.2. LOADING AND UNLOADING WITH TRAILER
  • 6.4.3. LIFTING MACHINE
  • 6.5. COLD WEATHER OPERATION
  • 6.5.1. COLD WEATHER OPERATION INFORMATION
  • 6.5.2. CAB HEATER IN COLD WEATHER
  • 6.5.3. AFTER DAILY WORK COMPLETION
  • 6.5.4. AFTER COLD WEATHER SEASON
  • 6.6. LONG TERM STORAGE
  • 6.6.1. BEFORE STORAGE
  • 6.6.2. DURING STORAGE
  • 6.6.3. AFTER STORAGE
  • 6.7. TROUBLES AND ACTIONS
  • 6.7.1. RUNNING OUT OF FUEL
  • 6.7.2. PHENOMENA THAT ARE NOT FAILURES
  • 6.7.3. TOWING THE MACHINE
  • 6.7.4. SEVERE JOB CONDITION
  • 6.7.5. DISCHARGED BATTERY
  • 6.7.6. OTHER TROUBLE
  • 7. MAINTENANCE
  • 7.1. MAINTENANCE INFORMATION
  • 7.2. LUBRICANTS, COOLANT AND FILTERS
  • 7.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
  • 7.2.2. ELECTRIC SYSTEM MAINTENANCE
  • 7.3. WEAR PARTS
  • 7.3.1. WEAR PARTS LIST
  • 7.4. LUBRICANTS, FUEL AND COOLANT SPECIFICATIONS
  • 7.4.1. PROPER SELECTION
  • 7.5. TIGHTENING TORQUE SPECIFICATIONS
  • 7.5.1. TIGHTENING TORQUE LIST
  • 7.6. SAFETY CRITICAL PARTS
  • 7.6.1. SAFETY CRITICAL PARTS LIST
  • 7.7. MAINTENANCE SCHEDULE
  • 7.7.1. MAINTENANCE SCHEDULE CHART
  • 7.7.2. MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
  • 7.8. MAINTENANCE PROCEDURE
  • 7.8.1. INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
  • 7.8.2. WHEN REQUIRED
  • 7.8.3. CHECK BEFORE STARTING
  • 7.8.4. EVERY 100 HOURS MAINTENANCE
  • 7.8.5. EVERY 250 HOURS MAINTENANCE
  • 7.8.6. EVERY 500 HOURS MAINTENANCE
  • 7.8.7. EVERY 1000 HOURS MAINTENANCE
  • 7.8.8. EVERY 2000 HOURS MAINTENANCE
  • 8. SPECIFICATIONS
  • 8.1. SPECIFICATIONS
  • 9. ATTACHMENTS AND OPTIONS
  • 9.1. ATTACHMENTS AND OPTIONS GENERAL INFORMATION
  • 9.1.1. SAFETY FIRST
  • 9.1.2. ATTACHMENT INSTALLATION
  • 9.2. BUCKET WITH HOOK
  • 9.2.1. HOOK CONDITION
  • 9.2.2. PROHIBITED OPERATIONS
  • 9.3. DEFROSTER CONTROLS
  • 9.3.1. CONTROL PANEL
  • 9.4. MACHINE READY FOR ATTACHMENT
  • 9.4.1. LOCATIONS
  • 9.4.2. HYDRAULIC CIRCUIT
  • 9.4.3. ATTACHMENTS OPERATIONS
  • 9.4.4. LONGTERM STORAGE
  • 9.5. CHANGING MACHINE CONTROL PATTERN (IF PATTERN CHANGE VALVE EQUIPPED)
  • 9.5.1. CONTROL PATTERN CHANGE PROCEDURE
  • 9.5.2. MACHINE CONTROL PATTERNS
  • 9.6. ATTACHMENT GUIDE
  • 9.6.1. ATTACHMENT COMBINATIONS
  • 9.7. RECOMMENDED ATTACHMENT OPERATIONS
  • 9.7.1. HYDRAULIC BREAKER
  • 10. INDEX
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC40MRX-1, PC45MRX-1 Hydraulic Excavator Operation and Maintenance Manual SEAM043000T”

Your email address will not be published. Required fields are marked *