Komatsu PC490HRD-11 Demolition Hydraulic Excavator Operation and Maintenance Manual UENAM01741

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: UENAM01741
  • Format: PDF
  • Size: 45.6MB
  • Number of Pages: 172

Description

  • Model List:

    • PC490HRD-11 Demolition Hydraulic Excavator
  • 1. FOREWORD
  • 1.1. READ THIS MANUAL
  • 1.2. KOMATSU MACHINE OPERATOR PRIVACY POLICY
  • 1.3. SAFETY INFORMATION
  • 2. SAFETY
  • 2.1. SAFETY
  • 2.2. SAFETY LABELS
  • 2.2.1. LOCATION OF SAFETY LABELS
  • 2.2.2. CONTENTS OF SAFETY LABELS
  • 2.3. PRECAUTIONS FOR OPERATION
  • 2.3.1. CHECKS AND ADJUSTMENT BEFORE STARTING ENGINE
  • 2.3.2. PRECAUTIONS FOR TRANSPORTATION
  • 2.3.3. PRECAUTIONS WHEN LOADING AND UNLOADING
  • 2.3.4. PRECAUTIONS WHEN OPERATING IN BASE MACHINE CONFIGURATION
  • 2.3.4.1. PRECAUTIONS WHEN DISCONNECTING DEMOLITION DIGGING OR MEDIUM REACH DEMOLITION WORK EQUIPMENT
  • 3. OPERATION
  • 3.1. EXPLANATION OF COMPONENTS
  • 3.1.1. CONTROL LEVERS AND SWITCHES
  • 3.2. MACHINE OPERATIONS AND CONTROLS
  • 3.2.1. BEFORE STARTING ENGINE
  • 3.2.2. ULTRA QUICK BOOM CHANGE CONTROL SYSTEM
  • 3.3. GENERAL VIEW
  • 3.3.1. GENERAL VIEW OF MACHINE
  • 3.4. CONTROL LEVERS AND SWITCHES
  • 3.4.1. TOUCH SCREEN DISPLAY
  • 3.5. FUSE
  • 3.6. ULTRA QUICK BOOM CHANGE FUNCTION
  • 3.6.1. WORKING RANGE INDICATOR SYSTEM
  • 3.6.2. INSTALLATION OF WORK EQUIPMENT
  • 3.6.3. DISCONNECT WORK EQUIPMENT
  • 3.6.4. WORK EQUIPMENT SUPPORT STANDS
  • 3.6.5. HIGH REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION
  • 3.6.5.1. REMOVAL OF HIGH REACH DEMOLITION WORK EQUIPMENT (WITHOUT QUICK COUPLER ATTACHMENT)
  • 3.6.5.2. INSTALLATION OF HIGH REACH DEMOLITION WORK EQUIPMENT (WITHOUT QUICK COUPLER ATTACHMENT)
  • 3.6.5.3. REMOVAL OF HIGH REACH DEMOLITION WORK EQUIPMENT (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.5.4. INSTALLATION OF HIGH REACH DEMOLITION WORK EQUIPMENT (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.6. HIGH REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION OF ARM REST BRACKET
  • 3.6.6.1. INSTALLATION OF ARM REST BRACKET
  • 3.6.6.2. REMOVAL OF ARM REST BRACKET
  • 3.6.7. DEMOLITION DIGGING WORK EQUIPMENT REMOVAL AND INSTALLATION
  • 3.6.7.1. REMOVAL OF DEMOLITION DIGGING WORK EQUIPMENT
  • 3.6.7.2. INSTALLATION OF DEMOLITION DIGGING WORK EQUIPMENT
  • 3.6.8. MEDIUM REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION
  • 3.6.8.1. REMOVAL OF MEDIUM REACH DEMOLITION WORK EQUIPMENT
  • 3.6.8.2. INSTALLATION OF MEDIUM REACH DEMOLITION WORK EQUIPMENT
  • 3.6.9. MEDIUM REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION ALTERNATIVE METHOD
  • 3.6.9.1. REMOVAL OF MEDIUM REACH DEMOLITION WORK EQUIPMENT
  • 3.6.9.2. INSTALLATION OF MEDIUM REACH DEMOLITION WORK EQUIPMENT
  • 3.6.10. EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION
  • 3.6.10.1. REMOVAL OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT WITHOUT QUICK COUPLER ATTACHMENT
  • 3.6.10.2. INSTALLATION OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT WITHOUT QUICK COUPLER ATTACHMENT
  • 3.6.10.3. REMOVAL OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.10.4. INSTALLATION OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.11. EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT REMOVAL AND INSTALLATION ALTERNATIVE METHOD (WITHOUT QUICK COUPLER)
  • 3.6.11.1. REMOVAL OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT ALTERNATIVE METHOD (WITHOUT QUICK COUPLER ATTACHMENT)
  • 3.6.11.2. INSTALLATION OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT ALTERNATIVE METHOD (WITHOUT QUICK COUPLER ATTACHMENT)
  • 3.6.12. EXTENDED HIGH REACH WORK EQUIPMENT REMOVAL AND INSTALLATION ALTERNATIVE METHOD (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.12.1. REMOVAL OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT ALTERNATIVE METHOD (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.12.2. INSTALLATION OF EXTENDED HIGH REACH DEMOLITION WORK EQUIPMENT ALTERNATIVE METHOD (WITH QUICK COUPLER ATTACHMENT)
  • 3.6.13. EXTENSION BOOM REMOVAL AND INSTALLATION
  • 3.6.13.1. REMOVAL OF EXTENSION BOOM
  • 3.6.13.2. INSTALLATION OF EXTENSION BOOM
  • 3.6.14. DEMOLITION DIGGING WORK EQUIPMENT AND MEDIUM REACH DEMOLITION WORK EQUIPMENT CRANKED TO STRAIGHT
  • 3.6.15. DEMOLITION DIGGING WORK EQUIPMENT AND MEDIUM REACH DEMOLITION WORK EQUIPMENT STRAIGHT TO CRANKED
  • 3.7. TRANSPORTATION
  • 3.7.1. TRANSPORTATION AND LIFTING
  • 3.7.2. TRANSPORTATION DIMENSIONS
  • 3.7.3. PREPARATION FOR STORAGE
  • 3.8. PHENOMENA AND ACTIONS
  • 3.8.1. ERRORS AND PHENOMENA
  • 4. MAINTENANCE
  • 4.1. MAINTENANCE SCHEDULE
  • 4.1.1. MAINTENANCE SCHEDULE FOR ULTRA QUICK BOOM CHANGE VALVES
  • 5. SPECIFICATIONS
  • 5.1. WORKING RANGE
  • 5.2. EXPLANATION OF LIFT CAPACITY CHART
  • 5.3. WORK EQUIPMENT CONNECTION AND DISCONNECTION LIMITS
  • 6. INDEX
  • 7. Blank Page
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC490HRD-11 Demolition Hydraulic Excavator Operation and Maintenance Manual UENAM01741”

Your email address will not be published. Required fields are marked *