Model List:
- PC490LC-10 Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 3. CONTENTS
- 4. Specifications
- 5. Precautions for field assembly
- 6. Disposal of removed parts
- 7. Assembling procedures, applicable equipment and schedule
- 8. Flow of field assembly
- 9. Kit layout diagram
- 10. Transportation
- 11. Tool list for field assembly
- 12. Tightening torque
- 13. Coating materials
- 14. Selection of wire ropes used for assembly
- 15. Selection of nylon slings used for assembly
- 16. ASSEMBLY OF CHASSIS
- 16.1. A1 Installation of climbing step
- 16.2. A2 Installation of handrail
- 16.3. A3 Installation of mirror
- 17. ASSEMBLING OF WORK EQUIPMENT
- 17.1. B1 Installation of boom cylinder
- 17.2. B2 Releasing remaining pressure in hydraulic circuit
- 17.3. B3 Installation of boom cylinder hoses
- 17.4. B4 Installation of boom cylinder top pin
- 17.5. B5 Installation of boom assembly
- 17.6. B6 Installation of hoses from chassis along top of boom
- 17.7. B7 Connection of boom cylinder head
- 17.8. B8 Installation of arm assembly
- 17.9. B9 Installation of bucket cylinder hoses between boom and bucket cylinder
- 17.10. B10 Installation of bucket
- 17.11. B11 Connection of work equipment grease piping
- 17.12. B12 Connection of work equipment wiring
- 17.13. B13 Greasing after completion of work equipment
- 17.14. B14 Bleeding air from work equipment circuit
- 18. INCREASING AND DECREASING OF TRACK FRAME GAUGE, ASSEMBLING OF COUNTERWEIGHT
- 18.1. C1 Increasing and decreasing of track frame gauge
- 18.2. C2 Installation of steps
- 18.3. C3 Installation of travel piping covers
- 18.4. C4 Adjustment of track tension
- 18.5. C5 Sticking sheet to counterweight
- 18.6. C6 Installation of camera
- 18.7. C7 Installation of counterweight
- 19. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
- 19.1. M1 Replacement of return filter (Standard filter to flushing filter)
- 19.2. M2 Flushing of hydraulic circuit
- 19.3. M3 Replacement of return filter (Standard filter to flushing filt
- 19.4. M4 Check of oil/coolant level at each part
- 19.5. M5 Inspection of oil level in hydraulic tank and refill
- 19.6. M6 Parts to be touched up after field assembly
- 19.7. M7 Error code
- 20. Mounting bolt torque check sheet
- 21. Field assembly inspection report (Backhoe)