Description
-
Model List:
- PC700LC-11 Hydraulic Excavator
- PC700LC-11E0 Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 3. CONTENTS
- 4. SPECIFICATIONS
- 5. PRECAUTIONS FOR FIELD ASSEMBLY
- 6. DISPOSAL OF REMOVED PARTS
- 7. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
- 8. KIT LAYOUT DIAGRAM
- 9. FLOW OF FIELD ASSEMBLY
- 10. TRANSPORTATION
- 11. LIST OF TOOLS FOR FIELD ASSEMBLING
- 12. TIGHTENING TORQUE
- 13. COATING MATERIALS
- 14. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
- 15. SELECTION OF NYLON SLINGS USED FOR ASSEMBLY
- 16. Assembly of Chassis
- 16.1. A1 Installation of Left and Right Track Frames
- 16.2. A2 Installation of Travel Pipe
- 16.3. A3 Installation of Operator Cabs Door Stopper and Striker
- 16.4. A4 Installation of Radiator Cover
- 16.5. A5 Installation of Rearview Mirror
- 16.6. A6 Installation of Handrail
- 16.7. A7 Installation of Step
- 16.8. A8 Installation of Left Side Step
- 16.9. A9 Sticking Sheet to Counterweight
- 16.10. A10 Installation of Rearview Camera and Komvision Camera (Option)
- 16.11. A11 Installation of Counterweight
- 16.12. A12 IInstallation of Step Light
- 16.13. A13 Installation of Travel Piping Cover
- 16.14. A14 Testing Track Shoe Tension
- 17. Assembling of Work Equipment
- 17.1. B1 Assembly of Arm Cylinder
- 17.2. B2 Connection of Arm Cylinder Hoses
- 17.3. B3 Installation of Boom Cylinder
- 17.4. B4 Installation of Boom Cylinder Hoses
- 17.5. B5 Installation of Boom Foot Dust Seal
- 17.6. B6 Installation of Boom Assembly
- 17.7. B7 Installation of Hoses from Chassis Along Top of Boom
- 17.8. B8 Connection of Boom Cylinder Head
- 17.9. B9 Installation of Arm Assembly
- 17.10. B10 Installation of Bucket Cylinder Hoses between Boom and Bucket Cylinder
- 17.11. B11 Installation of Bucket
- 17.12. B12 Connection of Work Equipment Grease Piping
- 17.13. B13 Connection of Work Equipment Wiring
- 17.14. B14 Greasing after Assembling Work Equipment
- 17.15. B15 Bleeding Air from Work Equipment Circuit
- 17.16. B16 Releasing Remaining Pressure from Hydraulic Circuit
- 18. Procedure for Inspection and Maintenance after Completion of Assembly
- 18.1. M1 Replacement of Return Filter (Standard Filter to Flushing Filter)
- 18.2. M2 Flushing of Hydraulic Circuit
- 18.3. M3 Replacement of Return Filter (Flushing Filter to Standard Filter)
- 18.4. M4 Bleeding Air from Work Equipment Circuit
- 18.5. M5 Check of Oil/Coolant Level at Each Part
- 18.6. M6 Inspection of Oil Level in Hydraulic Tank and Refill
- 18.7. M7 Parts to be Touched up After Field Assembly
- 18.8. M8 Confirmation of Failure
- 18.9. M9 ADJUST KomVision Camera angle (KomVision Spec.) (Camera calibration and 12 m visibility check)
- 19. Mounting bolt torque check sheet
- 20. Field Assembly Inspection Report (Backhoe)
















Reviews
There are no reviews yet.