Model List:
- PC750-7 Hydraulic Excavator
- PC750LC-7 Hydraulic Excavator
- PC750SE-7 Hydraulic Excavator
- PC800-7 Hydraulic Excavator
- PC800SE-7 Hydraulic Excavator
- 1. Cover
- 2. Foreword
- 3. Contents
- 4. Specifications
- 5. Precautions for Field Assembly
- 6. Disposal of Removed Parts
- 7. Assembling Procedures, Applicable Equipment and Schedule
- 8. Transportation
- 9. Packing Style for Transportation
- 10. List of Tools for Field Assembling
- 11. Tightening Torque
- 12. Coating Materials List
- 13. Assembling of Chassis
- 13.1. A1 Installation of Left and Right Track Frames
- 13.2. A2 Installation of Travel Pipe
- 13.3. A3 Installation of Top Guard
- 13.4. A4 Installation of Radiator Cover
- 13.5. A5 Installation of Rearview Mirror
- 13.6. A6 Installation of Handrail
- 13.7. A7 Installation of Step
- 13.8. A8 Installation of Left Side Step
- 13.9. A9 Installation of Muffler Tail Tube
- 13.10. A10 Sticking of Sheet (to Counterweight)
- 13.11. A11 Installation of Counterweight
- 13.12. A12 Installation of ORBCOMM Antenna (if equipped)
- 13.13. A13 Installation of Step Light
- 13.14. A14 Installation of Travel Pipe Cover
- 13.15. A15 Extension of Track Frame Gauge (Only when 3split packages are tansported)
- 13.16. A16 Testing Track Shoe Tension
- 13.17. A17 Inspection of Oil Amount ans Water Amount
- 13.18. A18 Parts to be Touched up After Field Assembly
- 14. Assembling of Work Equipment of Backhoe
- 14.1. B1 Pulling Out of Boom Foot Pin, and Boom Cylinder Foot Pin
- 14.2. B2 Installation of Boom Assembly
- 14.3. B3 Relieving Remaining Pressure from Hydraulic Circuit
- 14.4. B4 Installation of Boom Cylinder Foot
- 14.5. B5 Installation of Boom Cylinder Hose
- 14.6. B6 Installation of Boom Cylinder
- 14.7. B7 Installation of Arm Cylinder
- 14.8. B8 Installation of Arm Cylinder Hose
- 14.9. B9 Installation of Arm Assembly
- 14.10. B10 Installation of of Hose between Boom and Bucket Cylinder
- 14.11. B11 Installation of Bucket Assembly
- 14.12. B12 Lubrication Piping to Work Equipment
- 14.13. B13 Connection of Wiring of Work Equipment
- 14.14. B14 Greasing after Assembling Work Equipment
- 14.15. B15 Air Bleeding from Hydraulic Cylinder
- 15. Assembling of Work Equipment of Loading Shovel
- 15.1. C1 Releasing residual pressure in hydraulic circuit
- 15.2. C2 Pulling out boom foot pin and boom cylinder foot pin
- 15.3. C3 Installation of boom and arm assembly
- 15.4. C4 Installation of flushing piping between chassis and boom
- 15.5. C5 Installation of flushing piping for boom cylinder and arm cylinder
- 15.6. C6 Installation of flushing piping for bucket cylinder
- 15.7. C7 Installation of flushing piping for bottom dump cylinder
- 15.8. C8 Installation of boom cylinder
- 15.9. C9 Installation of boom cylinder foot
- 15.10. C10 Installation of boom cylinder hoses
- 15.11. C11 Installation of boom cylinder rod pin
- 15.12. C12 Installation of arm cylinder hoses
- 15.13. C13 Installation of bucket cylinder
- 15.14. C14 Installation of bucket cylinder hose
- 15.15. C15 Installation of connecting hoses between chassis and boom top
- 15.16. C16 Installation of bottom dump cylinder hose
- 15.17. C17 Installation of bucket assembly
- 15.18. C18 Installation of working lamps
- 15.19. C19 Installation of work equipment drease piping
- 15.20. C20 Greasing after assembling of work equipment
- 15.21. C21 Bleeding air from work equipment circuit
- 16. Procedure for Inspection and Maintenance after Completion of Assembly
- 16.1. M1 Inspection of Oil level in Hydraulic Tank and Refill
- 16.2. M2 Replacement of Return Filter (Standard Filter to Flushing Filter)
- 16.3. M3 Flushing of Hydraulic Circuit
- 16.4. M4 Replacement of Return Filter (Flushing Filter to Standard Filter)
- 17. Field Assembly Inspection Report (Backhoe)
- 18. Field Assembly Inspection Report (Loading Shovel)