Komatsu PC800-8, PC800LC-8, PC800SE-8, PC850-8, PC850SE-8 Hydraulic Excavator Field Assembly Instruction GEN00048-05

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00048-05
  • Format: PDF
  • Size: 9.2MB
  • Number of Pages: 181

Description

  • Model List:

    • PC800-8 Hydraulic Excavator
    • PC800LC-8 Hydraulic Excavator
    • PC800SE-8 Hydraulic Excavator
    • PC850-8 Hydraulic Excavator
    • PC850SE-8 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. CONTENTS
  • 4. SPECIFICATIONS
  • 5. PRECAUTIONS FOR FIELD ASSEMBLY
  • 6. DISPOSAL OF REMOVED PARTS
  • 7. ASSEMBLING PROCEDURES, APPLICABLE EQUIPMENT AND SCHEDULE
  • 8. KIT LAYOUT DIAGRAM
  • 9. TRANSPORTATION
  • 10. LIST OF TOOLS FOR FIELD ASSEMBLING
  • 11. TIGHTENING TORQUE
  • 12. COATING MATERIALS
  • 13. ASSEMBLY OF CHASSIS
  • 13.1. A1. Installation of Left and Right Track Frames
  • 13.2. A2. Installation of Travel Pipe
  • 13.3. A3. Installation of Top Guard
  • 13.4. A4. Installation of Radiator Cover
  • 13.5. A5. Installation of Rearview Mirror
  • 13.6. A6. Installation of Left Side Step
  • 13.7. A7. Installation of Handrail
  • 13.8. A8. Installation of Handrail (With top guard)
  • 13.9. A9. Installation of Muffler Tail Tube
  • 13.10. A10. Sticking Sheet to Counterweight
  • 13.11. A11. Installation of Counterweight
  • 13.12. A12. Installation of KOMTRAX Antenna (if equipped)
  • 13.13. A13. Installation of Step Light
  • 13.14. A14. Air Bleeding of Travel Motor
  • 13.15. A15. Installation of Travel Piping Cover
  • 13.16. A16. Testing Track Shoe Tension
  • 13.17. A17. Check Fuel, Coolant and Oil Levels
  • 13.18. A18. Parts to be Touched up after Field Assembly
  • 14. ASSEMBLING OF WORK EQUIPMENT OF BACKHOE
  • 14.1. B1. Assembly of Arm Cylinder
  • 14.2. B2. Connection of Arm Cylinder Hoses
  • 14.3. B3. Installation of Boom Cylinder Foot
  • 14.4. B4. Relieving Remaining Pressure from Hydraulic Circuit
  • 14.5. B5. Installation of Boom Cylinder Hoses
  • 14.6. B6. Installation of Boom Foot Dust Seal
  • 14.7. B7. Assembly of Boom Assembly
  • 14.8. B8. Hose Connection of Arm and Bucket Circuits
  • 14.9. B9. Installation of Quick Return Hose
  • 14.10. B10. Installation of Boom Cylinder
  • 14.11. B11. Installation of Arm Assembly
  • 14.12. B12. Installation of Hose between Boom and Bucket Cylinder
  • 14.13. B13. Installation of Bucket Assembly
  • 14.14. B14. Lubrication Piping to Work Equipment
  • 14.15. B15. Wiring of Work Equipment
  • 14.16. B16. Greasing after Assembling Work Equipment
  • 14.17. B17. Air Bleeding from Hydraulic Cylinder
  • 15. ASSEMBLING OF WORK EQUIPMENT OF LOADING SHOVEL
  • 15.1. C1. Releasing residual pressure in hydraulic circuit
  • 15.2. C2. Pulling out boom foot pin and boom cylinder foot pin
  • 15.3. C3. Installation of boom and arm assembly
  • 15.4. C4. Installation of flushing piping between chassis and boom
  • 15.5. C5. Installation of flushing piping for boom cylinder and arm cylinder
  • 15.6. C6. Installation of flushing piping for bucket cylinder
  • 15.7. C7. Installation of flushing piping for bottom dump cylinder
  • 15.8. C8. Installation of boom cylinder
  • 15.9. C9. Installation of boom cylinder foot
  • 15.10. C10. Installation of boom cylinder hoses
  • 15.11. C11. Installation of boom cylinder rod pin
  • 15.12. C12. Installation of arm cylinder hoses
  • 15.13. C13. Installation of bucket cylinder
  • 15.14. C14. Installation of bucket cylinder hose
  • 15.15. C15. Installation of connecting hoses between chassis and boom top
  • 15.16. C16. Installation of bottom dump cylinder hoses
  • 15.17. C17. Installation of bucket assembly
  • 15.18. C18. Installation of working lamps
  • 15.19. C19. Installation of work equipment grease piping
  • 15.20. C20. Greasing after assembling of work equipment
  • 15.21. C21. Bleeding air from work equipment circuit
  • 16. ASSEMBLING OF COUNTERWEIGHT REMOVER
  • 16.1. D1. Installation of Rubber Cushions
  • 16.2. D2. Adjustment of Shims for Counterweight
  • 16.3. D3. Greasing
  • 16.4. D4. Installation of Counterweight Remover
  • 16.5. D5. Installation of Covers
  • 16.6. D6. Installation of Hoses
  • 16.7. D7. Bleeding Air from Counterweight Remover Circuit
  • 16.8. D8. Installation of Counterweight
  • 16.9. D9. Installation of Accessories
  • 16.10. D10. Check of Operation
  • 17. PROCEDURE FOR INSPECTION AND MAINTENANCE AFTER COMPLETION OF ASSEMBLY
  • 17.1. M1. Inspection of Oil Level in Hydraulic Tank and Refill
  • 17.2. M2. Replacement of Return Filter (Standard Filter to Flushing Filter)
  • 17.3. M3. Flushing of Hydraulic Circuit
  • 17.4. M4. Replacement of Return Filter (Flushing Filter to Standard Filter)
  • 17.5. M5. Error Code
  • 18. FIELD ASSEMBLY INSPECTION REPORT (Backhoe)
  • 19. FIELD ASSEMBLY INSPECTION REPORT (Loading Shovel)
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC800-8, PC800LC-8, PC800SE-8, PC850-8, PC850SE-8 Hydraulic Excavator Field Assembly Instruction GEN00048-05”

Your email address will not be published. Required fields are marked *