Komatsu WA250-5H Wheel Loader Operation and Maintenance Manual VEAM230100

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: VEAM230100
  • Format: PDF
  • Size: 9.4MB
  • Number of Pages: 241

Description

  • Model List:

    • WA250-5H Wheel Loader
  • 1. WA2505H
  • 2. FOREWORD
  • 2.1. Foreword
  • 2.2. Safety information
  • 2.3. Introduction
  • 2.3.1. Directions of machine
  • 2.4. Necessary information
  • 2.4.1. Machine serial No. plate and position
  • 2.4.2. Engine serial No. plate and position
  • 2.4.3. Position of service meter
  • 2.4.4. Table to enter serial No. and distributor
  • 2.5. Contents
  • 2.6. Dimensions, weights and operating data
  • 2.6.1. WA2505H Dimensions, weights and operating data
  • 2.7. CEconforming equipment
  • 2.7.1. CEconforming equipment
  • 2.7.2. Manufacturersupplied CEconforming equipment, according to document42193H1900
  • 3. SAFETY
  • 3.1. Safety labels
  • 3.1.1. Location of safety labels
  • 3.1.2. Presentation of safety labels
  • 3.2. General precautions
  • 3.2.1. Safety rules
  • 3.3. Precautions for operation
  • 3.3.1. Starting engine
  • 3.3.2. Operation
  • 3.3.3. Transportation
  • 3.3.4. Battery
  • 3.3.5. Towing
  • 3.4. Precautions for maintenance
  • 3.4.1. Safety instructions
  • 3.5. Precautions with tires
  • 3.5.1. Handling tires
  • 3.5.2. Precautions when storing tires
  • 4. OPERATION
  • 4.1. General view
  • 4.1.1. General view of machine
  • 4.1.2. General view of controls and gauges
  • 4.2. Explanation of components
  • 4.2.1. Machine monitor
  • 4.2.2. Switches
  • 4.2.3. Control levers, pedals
  • 4.2.4. Steering tilt lock lever
  • 4.2.5. Cap and cover with lock
  • 4.2.6. Safety bar
  • 4.2.7. Towing pin
  • 4.2.8. Grease pump
  • 4.2.9. Cab door inner lock
  • 4.2.10. Cab door open lock
  • 4.2.11. Cab window open lock cancel knob
  • 4.2.12. Fuse
  • 4.2.13. Slow blow fuse
  • 4.2.14. Power outlet
  • 4.2.15. Air conditioner
  • 4.2.16. Handling cab wiper
  • 4.3. Operation
  • 4.3.1. Check before starting engine, adjust
  • 4.3.2. Starting engine
  • 4.3.3. Operations and checks after starting engine
  • 4.3.4. Stopping engine
  • 4.3.5. Moving the machine (Directional, speed), stopping the machine
  • 4.3.6. Turning
  • 4.3.7. Operation of work equipment
  • 4.3.8. Work possible using wheel loader
  • 4.3.9. Precautions for operation
  • 4.3.10. Adjusting work equipment posture
  • 4.3.11. Parking machine
  • 4.3.12. Check after stopping engine
  • 4.3.13. Checks after completion of operation
  • 4.3.14. Locking
  • 4.3.15. Handling the tires
  • 4.4. Transportation
  • 4.4.1. Transportation procedure
  • 4.4.2. Loading, unloading work with trailers
  • 4.4.3. Lifting machine
  • 4.5. Cold weather operation
  • 4.5.1. Precautions for low temperature
  • 4.5.2. Precautions after completion of work
  • 4.5.3. After cold weather
  • 4.5.4. Warmingup operation for steering hydraulic circuit in cold weather
  • 4.6. Longterm storage
  • 4.6.1. Before storage
  • 4.6.2. During storage
  • 4.6.3. After storage
  • 4.7. Troubleshooting
  • 4.7.1. When machine runs out of fuel
  • 4.7.2. Towing the machine
  • 4.7.3. If battery is discharged
  • 4.7.4. Other trouble
  • 5. MAINTENANCE
  • 5.1. Guides to maintenance
  • 5.2. Outlines of service
  • 5.2.1. Handling oil, fuel, coolant and performing oil clinic
  • 5.2.2. Outline of electric system
  • 5.3. Wear parts
  • 5.3.1. Wear parts list
  • 5.4. Fuel, coolant and lubricants
  • 5.4.1. Lubrication chart
  • 5.4.2. Proper selection of fuel, coolant and lubricants
  • 5.5. Standard tightening torques for bolts and nuts
  • 5.5.1. Torque list
  • 5.6. Periodic replacement of safety critical parts
  • 5.6.1. Safety critical parts
  • 5.7. Maintenance schedule chart
  • 5.7.1. Maintenance schedule chart
  • 5.8. Service procedure
  • 5.8.1. Initial 250 hours service (only after the first 250 hours)
  • 5.8.2. When required
  • 5.8.3. Check before starting
  • 5.8.4. Every 50 hours service
  • 5.8.5. Every 100 hours service
  • 5.8.6. Every 250 hours service
  • 5.8.7. Every 500 hours service
  • 5.8.8. Every 1000 hours service
  • 5.8.9. Every 2000 hours service
  • 5.8.10. Every 4000 hours service
  • 6. TECHNICAL DATA
  • 6.1. Technical data
  • 6.2. Noise emission levels
  • 6.3. Vibration level
  • 7. ATTACHMENTS, OPTIONS
  • 7.1. Selecting bucket and tires
  • 7.2. Method of using 2 levers
  • 7.2.1. Explanation of components
  • 7.2.2. Operation
  • 7.3. Central lubrication system
  • 7.3.1. Operating the central lubrication system
  • 7.3.2. Display and control unit
  • 7.3.3. Changing the lubrication interval times
  • 8. INDEX
  • 8.1. Index
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA250-5H Wheel Loader Operation and Maintenance Manual VEAM230100”

Your email address will not be published. Required fields are marked *