Description
-
Model List:
- WA270-3 Wheel Loader
- 1. Contents
- 2. INFORMATION ON THESE OPERATING INSTRUCTIONS
- 2.1. WHY YOU SHOULD READ THESE OPERATING INSTRUCTIONS
- 2.2. NOTES ON SAFETY REGULATIONS
- 2.3. CECONFORMING EQUIPMENT
- 3. LOADING AND TRANSPORTING THE MACHINE
- 3.1. LOADING AND TRANSPORTING THE MACHINE
- 3.2. DIMENSIONS, WEIGHTS, AND OPERATING VALUES
- 3.3. MACHINE RATINGS
- 4. SAFETY
- 4.1. SAFETY INSTRUCTIONS
- 4.2. BEFORE YOU START THE ENGINE
- 4.3. MACHINE OPERATION
- 4.4. TRANSPORT
- 4.5. SAFETY MEASURES DURING MAINTENANCE
- 4.6. SAFETY LABELS
- 5. OPERATING AND CONTROL ELEMENTS
- 5.1. GENERAL VIEW OF THE MACHINE
- 5.2. OPERATING AND CONTROL ELEMENTS
- 6. OPERATION
- 6.1. RUNNING IN THE MACHINE
- 6.2. INSPECTIONS PRIOR TO STARTING
- 6.3. ADJUSTMENTS PRIOR TO STARTUP
- 6.4. SWITCHING THE ENGINE ON AND OFF
- 6.5. DRIVING
- 6.6. GEAR SHIFTING
- 6.7. CHANGING THE DRIVING DIRECTION
- 6.8. STOPPING
- 6.9. CONTROL LEVERS FOR THE WORK HYDRAULIC SYSTEM
- 6.10. MULTIFUNCTIONAL LEVER FOR THE WORK HYDRAULIC SYSTEM
- 6.11. WORKING WITH THE MACHINE
- 6.12. ADJUSTING THE WORK UNIT
- 6.13. PRECAUTIONS FOR SPECIAL OPERATIONS
- 6.14. TYRES
- 6.15. WINTER OPERATION
- 6.16. LONGTERM SHUTDOWN
- 7. TROUBLESHOOTING
- 7.1. TROUBLESHOOTING
- 8. MAINTENANCE
- 8.1. MAINTENANCE BASICS
- 8.2. MAINTENANCE SCHEDULE
- 8.3. MAINTENANCE PRIOR TO STARTING UP
- 8.4. MAINTENANCE DURING THE RUNNINGIN PERIOD
- 8.5. MAINTENANCE EVERY 100 OPERATING HOURS
- 8.6. MAINTENANCE EVERY 250 OPERATING HOURS
- 8.7. MAINTENANCE EVERY 500 OPERATING HOURS
- 8.8. MAINTENANCE EVERY 1000 OPERATING HOURS
- 8.9. MAINTENANCE EVERY 2000 OPERATING HOURS
- 8.10. MAINTENANCE EVERY 4000 OPERATING HOURS
- 8.11. MAINTENANCE AS REQUIRED
- 9. TECHNICAL DETAILS
- 9.1. Technical details
- 10. SPECIAL EQUIPMENT, AUXILIARY EQUIPMENT
- 10.1. ALS ELECTRONIC
















There are no reviews yet.