Description
-
Model List:
- WA320-3H Wheel Loader
- 1. WA3203H
- 2. FOREWORD
- 2.1. SAFETY INFORMATION
- 2.2. INTRODUCTION
- 2.3. POSITIONS OF THE PLATES, TABLES FOR ENTERING THE SERIES NUMBER AND DEALER ADDRESS
- 2.4. CONTENTS
- 2.5. DIMENSIONS, WEIGHTS AND OPERATING DATA
- 2.6. CECONFORMING EQUIPMENT
- 2.7. LOADING
- 3. Safety
- 3.1. General Safety Measures
- 3.2. Safety Precautions During Operation
- 3.3. Machine Operation
- 3.4. Transport
- 3.5. Safety Measures During Maintenance
- 3.6. Safety Labels
- 4. Operation
- 4.1. GENERAL VIEW OF THE MACHINE
- 4.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 4.3. DESCRIPTION OF THE INDIVIDUAL ELEMENTS
- 4.4. SWITCHES
- 4.5. CONTROL LEVERS, PEDALS
- 4.6. PRESTART CHECKS
- 4.7. STARTING THE ENGINE
- 4.8. OPERATIONS AND CHECKS AFTER STARTING THE ENGINE
- 4.9. MACHINE TRAVEL
- 4.10. STOPPING THE MACHINE
- 4.11. OPERATING THE WORK EQUIPMENT
- 4.12. ADJUSTING THE WORK EQUIPMENT POSITION
- 4.13. PARKING THE MACHINE
- 4.14. TRANSPORT
- 4.15. COLD WEATHER OPERATION
- 4.16. LONGTERM STORAGE
- 4.17. TROUBLESHOOTING
- 4.17.1. IF THE FUEL TANK IS EMPTY
- 4.17.2. TOWING THE MACHINE
- 4.17.3. IF BATTERY IS DISCHARGED
- 4.17.4. MALFUNKTION OF BRAKE
- 4.17.5. OTHER MALFUNCTIONS
- 5. Maintenance
- 5.1. MAINTENANCE GUIDE
- 5.2. OUTLINES OF SERVICE
- 5.3. WEARING PARTS LIST
- 5.4. LUBRICANTS AND SUBSTANCES REQUIRED FOR OPERATION
- 5.5. TOOLS AND STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 5.6. PERIODICAL REPLACEMENT OF SAFETY CRITICAL PARTS
- 5.7. MAINTENANCE SCHEDULE
- 5.8. SERVICE PROCEDURE
- 5.8.1. MAINTENANCE AFTER THE FIRST 250 OPERATING HOURS
- 5.8.2. MAINTENANCE UPON DEMAND
- 5.8.3. CHECKS BEFORE STARTING
- 5.8.4. EVERY 50 HOURS SERVICE
- 5.8.5. EVERY 100 HOURS SERVICE
- 5.8.6. EVERY 250 HOURS SERVICE
- 5.8.7. EVERY 500 HOURS SERVICE
- 5.8.8. EVERY 1000 HOURS SERVICE
- 5.8.9. EVERY 2000 HOURS SERVICE
- 5.8.10. EVERY 4000 HOURS SERVICE
- 6. Specifications
- 7. Special Equipment and Attachments
- 7.1. ALSElectronics
















There are no reviews yet.