Komatsu WA600-3 Wheel Loader Operation and Maintenance Manual CEAM003001

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: CEAM003001
  • Format: PDF
  • Size: 13.0MB
  • Number of Pages: 257

Description

  • Model List:

    • WA600-3 Wheel Loader
  • 1. MAIN MENU
  • 2. INTRODUCTION
  • 2.1. FORWARD
  • 2.2. SAFETY INFORMATION
  • 2.3. INTRODUCTION
  • 2.3.1. INTENDED USE
  • 2.3.2. FEATURES
  • 2.3.3. BREAKING IN A NEW MACHINE
  • 2.4. LOCATION OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 2.4.1. MACHINE SERIAL NO. PLATE POSITION
  • 2.4.2. ENGINE SERIAL NO. PLATE POSITION
  • 2.4.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 2.5. TABLE OF CONTENTS
  • 3. SAFETY
  • 3.1. GENERAL PRECAUTIONS
  • 3.2. PRECAUTIONS DURING OPERATION
  • 3.2.1. BEFORE STARTING ENGINE
  • 3.2.2. AFTER STARTING ENGINE
  • 3.2.3. TRANSPORTATION
  • 3.2.4. BATTERY
  • 3.2.5. TOWING
  • 3.3. PRECAUTIONS FOR MAINTENANCE
  • 3.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 3.3.2. DURING MAINTENANCE
  • 3.3.3. TIRES
  • 3.4. SAFETY LABELS
  • 3.4.1. POSITION FOR ATTACHING SAFETY LABELS
  • 4. OPERATION
  • 4.1. GENERAL VIEW
  • 4.1.1. GENERAL VIEW OF MACHINE
  • 4.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 4.2. EXPLANATION OF COMPONENTS
  • 4.2.1. MACHINE MONITORS
  • 4.2.2. SWITCHES
  • 4.2.3. LEVERS AND PEDALS
  • 4.2.4. CAB DOOR HOLDOPEN LOCK
  • 4.2.5. AIR CLEANER SERVICE INDICATOR
  • 4.2.6. FRAME LOCKING BAR
  • 4.2.7. FUSE BOXES
  • 4.2.8. FUSE ARRANGEMENT AND CIRCUIT
  • 4.2.9. SLOWBLOW FUSE
  • 4.2.10. AIR CONDITIONER MAINTENANCE IN OFF SEASON
  • 4.2.11. COOL BOX
  • 4.2.12. TANK FILLER CAPS AND LOCKS
  • 4.3. OPERATING MACHINE
  • 4.3.1. CHECKS BEFORE STARTING
  • 4.3.2. STARTING THE ENGINE
  • 4.3.3. OPERATIONS AFTER STARTING THE ENGINE
  • 4.3.4. MOVING THE MACHINE
  • 4.3.5. CHANGING GEAR SPEED
  • 4.3.6. SHIFTING BETWEEN FORWARD AND REVERSE
  • 4.3.7. STEERING
  • 4.3.8. STOPPING THE MACHINE
  • 4.3.9. OPERATION OF WORK EQUIPMENT
  • 4.3.10. WORK POSSIBLE USING WHEEL LOADER
  • 4.3.11. PRECAUTIONS FOR OPERATION
  • 4.3.12. ADJUSTING THE WORK EQUIPMENT POSITIONERS
  • 4.3.13. PARKING THE MACHINE
  • 4.3.14. CHECKS AFTER COMPLETION OF OPERATION
  • 4.3.15. STOPPING ENGINE
  • 4.3.16. CHECK AFTER STOPPING THE ENGINE
  • 4.3.17. LOCKING
  • 4.3.18. HANDLING THE TIRES
  • 4.3.19. REMOVAL AND INSTALLATION OF THE BUCKET
  • 4.4. TRANSPORTATION
  • 4.4.1. LOADING AND UNLOADING
  • 4.4.2. PRECAUTIONS FOR LOADING
  • 4.4.3. LIFTING THE MACHINE
  • 4.4.4. PRECAUTIONS FOR TRANSPORTATION
  • 4.5. COLD WEATHER OPERATION
  • 4.5.1. FUEL AND LUBRICANTS
  • 4.5.2. COOLANT
  • 4.5.3. BATTERY
  • 4.5.4. PRECAUTIONS AFTER COMPLETION OF WORK
  • 4.5.5. AFTER COLD WEATHER
  • 4.5.6. WARMINGUP OPERATION FOR STEERING HYDRAULIC CIRCUIT IN COLD WEATHER
  • 4.6. LONG TERM STORAGE
  • 4.6.1. BEFORE STORAGE
  • 4.6.2. DURING STORAGE
  • 4.6.3. AFTER STORAGE
  • 4.7. TROUBLESHOOTING
  • 4.7.1. WHEN MACHINE RUNS OUT OF FUEL
  • 4.7.2. TOWING THE MACHINE
  • 4.7.3. IF THE BATTERY IS DISCHARGED
  • 4.7.4. OTHER TROUBLE
  • 5. MAINTENANCE
  • 5.1. GUIDES TO MAINTENANCE
  • 5.2. OUTLINES OF SERVICE
  • 5.2.1. OUTLINE OF OIL, FUEL, AND COOLANT
  • 5.2.2. FUEL INJECTION PUMP
  • 5.2.3. OUTLINE OF ELECTRIC SYSTEM
  • 5.3. WEAR PARTS LIST
  • 5.4. LUBRICANTS, FUEL, AND COOLANT
  • 5.4.1. PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
  • 5.4.2. ENGINE OIL
  • 5.4.3. TRANSMISSION, HYDRAULIC SYSTEM, BRAKE SYSTEM OIL
  • 5.4.4. AXLE OIL
  • 5.4.5. GREASE
  • 5.4.6. DIESEL FUEL
  • 5.4.7. COOLANT SPECIFICATIONS
  • 5.5. STANDARD TIGHTENING TORQUE FOR NUTS AND BOLTS
  • 5.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 5.5.2. TORQUE LIST
  • 5.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 5.7. MAINTENANCE SCHEDULE CHART
  • 5.8. SERVICE PROCEDURE
  • 5.8.1. INITIAL 250 HOURS SERVICE
  • 5.8.2. WHEN REQUIRED
  • 5.8.3. CHECKS BEFORE STARTING
  • 5.8.4. EVERY 50 HOURS SERVICE
  • 5.8.5. EVERY 100 HOURS SERVICE
  • 5.8.6. EVERY 250 HOURS SERVICE
  • 5.8.7. EVERY 500 HOURS SERVICE
  • 5.8.8. EVERY 1000 HOURS SERVICE
  • 5.8.9. EVERY 1500 HOURS SERVICE
  • 5.8.10. EVERY 2000 HOURS SERVICE
  • 5.8.11. EVERY 6000 HOURS SERVICE
  • 6. SPECIFICATIONS
  • 6.1. SPECIFICATIONS
  • 7. OPTIONS, ATTACHMENTS
  • 7.1. OPTIONAL PARTS AND ATIACHMENTS
  • 7.2. SELECTING BUCKETS AND TIRES
  • 7.3. RADIO
  • 7.3.1. EXPLANATION OF PARTS
  • 7.3.2. METHOD OF USE
  • 7.3.3. PRECAUTIONS WHEN USING
  • 7.4. AIR CONDITIONER
  • 7.4.1. GENERAL LOCATION AND FUNCTION OF CONTROL PANEL
  • 7.4.2. METHOD OF OPERATION
  • 7.5. AUTOGREASING SYSTEM
  • 7.5.1. METHOD OF OPERATING AUTOGREASING SYSTEM
  • 7.5.2. PRECAUTIONS WHEN HANDLING AUTOGREASING SYSTEM
  • 7.5.3. TROUBLESHOOTING (AUTOGREASING SYSTEM)
  • 7.5.4. SPECIFICATIONS
  • 7.6. AUTO SHIFT SYSTEM
  • 7.6.1. METHOD OF OPERATING
  • 7.6.2. PRECAUTIONS WHEN CHANGING DIRECTION
  • 7.7. (ELECTRONIC CONTROLLED SUSPENSION SYSTEM)
  • 7.7.1. STRUCTURE AND FUNCTION OF E.C.S.S.
  • 7.7.2. OPERATING E.C.S.S.
  • 7.7.3. PRECAUTIONS WHEN OPERATING E.C.S.S. SWITCH
  • 7.7.4. PRECAUTIONS WHEN HANDLING ACCUMULATOR
  • 7.7.5. REMOVAL OF TRAVEL DAMPER PIPING
  • 7.8. JOYSTICK STEERING SYSTEM
  • 7.8.1. STRUCTURE AND FUNCTION OF JOYSTICK STEERING
  • 7.8.2. OPERATION METHOD OF JOYSTICK STEERING SYSTEM
  • 7.8.3. PRECAUTIONS FOR STEERING WITH JOYSTICK
  • 7.8.4. ADJUSTMENT OF JOYSTICK CONSOLE
  • 7.9. GROUND DRIVEN STEERING
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA600-3 Wheel Loader Operation and Maintenance Manual CEAM003001”

Your email address will not be published. Required fields are marked *