Description
-
Model List:
- WA75-3 Wheel Loader
- 1. Contents
- 2. Information on these Operating Instructions
- 2.1. Notes on Safety Regulations
- 2.2. CEConforming Equipment
- 3. Loading and Transporting the Machine
- 3.1. Dimensions, Weights, and Operating Values
- 3.2. Technical Data
- 4. Safety
- 4.1. Before You Start the Engine
- 4.2. Machine Operation
- 4.3. Transport
- 4.4. Safety Measures During Maintenance
- 4.5. Safety Labels
- 5. Controls and Indicators
- 5.1. Overall View of the Machine
- 5.2. Controls and Indicators
- 5.3. Instrument Panel
- 5.4. Warning Lights
- 5.5. Control Lamps
- 5.6. Measuring Indicators
- 5.7. Switches
- 5.8. Control Levers, Pedals
- 6. Operation
- 6.1. Running in the Machine
- 6.2. Preparing the Machine Start
- 6.3. Adjustments Prior to Machine Start
- 6.4. Starting and Switching Off the Engine
- 6.5. Driving
- 6.6. Operating the Machine
- 6.7. Instructions for Winter Operation
- 6.8. Longer Standstill Periods of the Machine
- 7. Troubleshooting
- 7.1. Electrical System
- 7.2. Engine
- 7.3. Hydraulic System
- 7.4. Brakes
- 7.5. Axles
- 7.6. Emergency Steering Characteristics
- 7.7. Towing the Machine
- 8. Maintenance
- 8.1. Maintenance Basics
- 8.2. Table of Lubricants and Operating Agents
- 8.3. Tyres
- 8.4. Torque for Standard Nuts and Bolts
- 8.5. Maintenance Schedule
- 8.6. Maintenance Prior to Start
- 8.7. Maintenance Every 10 Operating Hours
- 8.8. Maintenance After the First 50 Operating Hours
- 8.9. Maintenance Every 50 Operating Hours
- 8.10. Maintenance Every 100 Operating Hours
- 8.11. Maintenance Every 250 Operating Hours
- 8.12. Maintenance Every 500 Operating Hours
- 8.13. Maintenance Every 1000 Operating Hours
- 8.14. Maintenance Every 2000 Operating Hours
- 9. Index
















There are no reviews yet.