Description
-
Model List:
- D475A-8 Bull Dozer
- 1. COVER
- 2. FOREWORD
- 3. CONTENTS
- 4. PRECAUTIONS FOR FIELD ASSEMBLY
- 5. DISPOSAL OF REMOVED PARTS
- 6. ASSEMBLY PROCEDURE, NECESSARY EQUIPMENTS, AND SCHEDULE
- 7. KIT LAYOUT DIAGRAM (WORK SPACE LAYOUT)
- 8. PACKING STYLE FOR TRANSPORTATION
- 9. SPECIFICATIONS
- 10. TOOL LIST FOR FIELD ASSEMBLY
- 11. DIAGRAM FOR TOOLS
- 12. TIGHTEN TORQUE TABLE
- 13. COATING MATERIALS LIST
- 14. SELECTION OF WIRE ROPES USED FOR ASSEMBLY
- 15. SELECTION OF NYLON SLINGS USED FOR ASSEMBLY
- 16. ASSEMBLY PROCEDURE
- 16.1. A1 Installation of track shoe assembly
- 16.2. A2 Installation of machine body (chassis)
- 16.3. A3 Installation of operators cab assembly(When operator cab assembly is not installed)
- 16.4. A4 Installation of pivot shaft (When pivot shaft is not installed)
- 16.5. A5 Installation of final drive assembly
- 16.6. A6 Installation of undercover (When undercover is not installed)
- 16.7. A7 Installation of blade lift hydraulic cylinder
- 16.8. A8 Installation of undercarriage 1
- 16.9. A8 Installation of undercarriage 2
- 16.10. A9 Adding oil to pivot chamber
- 16.11. A10 Inspection of oil level and coolant level
- 16.12. A11 Installation of ripper1
- 16.13. A11 Installation of ripper2
- 16.14. A11 Installation of ripper3
- 16.15. A11 Installation of ripper4
- 16.16. A11 Installation of ripper5
- 16.17. A11 Installation of ripper6
- 16.18. A12 Installation of trunnion
- 16.19. A13 Installation of track
- 16.20. A14 Adjusting of track tension
- 16.21. A15 Installation of mask
- 16.22. A16 Installation of handrail / step on right side of radiator
- 16.23. A17 Installation of shandrail / step on left side of radiator
- 16.24. A18 Instalation of cab right side cover(When cab right side cover is not installed)
- 16.25. A19 Instalation of cab left side cover(When cab left side cover is not installed)
- 16.26. A20 Assembling of blade unit1
- 16.27. A20 Assembling of blade unit2
- 16.28. A20 Assembling of blade unit3
- 16.29. A20 Assembling of blade unit4
- 16.30. A21 Installation of blade assembly
- 16.31. A22 Installation of KOMTRAX antenna
- 16.32. A23 Installation of ROPS
- 16.33. A24 Installation of engine air intake port hood(When engine air intake port hood is not installed)
- 16.34. A25 Installation of precleaner (optional)(When precleaner is not installed)
- 16.35. A26 Installation of engine exhaust pipe(When engine exhaust pipe is not installed)
- 16.36. A27 Installation of headlamp (When headlamp is not installed)
- 16.37. A28 Installation of giant ripper shank
- 16.38. A29 Adjustment of blade tilt control angle(Machine with semiU blade/fullU blade)
- 16.39. A30 Adjustment of blade tilt control angle(Machine with superdozer)
- 16.40. A31 Installation of platform 1
- 16.41. A31 Installation of platform2
- 16.42. A31 Installation of platform3
- 16.43. A31 Installation of platform4
- 16.44. A32 Greasing each part
- 16.45. A33 Bleeding air from hydraulic cylinder
- 16.46. A34 Bleeding air from work equipment pump and fan pump
- 16.47. A35 Installation of quick charge piping (optional)
- 16.48. A36 Installation of ladder 1 (For machine with ladder)
- 16.49. A36 Installation of ladder 2 (For machine with ladder)
- 16.50. A36 Installation of ladder 3 (For machine with ladder)
- 16.51. A36 Installation of ladder 4 (For machine with ladder)
- 16.52. A36 Installation of ladder 1 (For machine with ladder)
- 16.53. A37 Installation of access light and additional work lamp (optional)
- 17. CHECK AND MAINTENANCE PROCEDURES
- 17.1. M1 Checking machine monitor 1
- 17.2. M1 Checking machine monitor 2
- 17.3. M1 Checking machine monitor 3
- 17.4. M1 Checking machine monitor 4
- 17.5. M1 Checking machine monitor 5
- 17.6. M2 Adjustment menu
- 17.7. M3 Change of return filter (Standard filter Flushing filter)
- 17.8. M4 Flushing hydraulic circuit and bleeding air from cylinder 1
- 17.9. M5 Change of return filter (Flushing filter > Standard filter)
- 17.10. M6 Bleeding air from cylinder 2
- 17.11. M7 How to start operation of KOMTRAX terminal and how to initializeKOMTRAX Plus controller
- 17.12. M8 Noinjection cranking of engine
- 18. INSTALLATION OF SPILL GUARDS
- 19. FIELD ASSEMBLY INSPECTION REPORT
- 20. PmCLINIC
















Reviews
There are no reviews yet.