Komatsu PC95R-2 Hydraulic Excavator Operation and Maintenance Manual WEAM001504

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: WEAM001504
  • Format: PDF
  • Size: 7.5MB
  • Number of Pages: 218

Description

  • Model List:

    • PC95R-2 Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 2.1. FOREWORD
  • 2.2. INFORMATION ON SAFETY
  • 2.3. INTRODUCTION
  • 2.3.1. INTENDED USES
  • 2.3.2. IMPROPER OR UNAUTHORIZED USE
  • 2.3.3. MAIN CHARACTERISTICS
  • 2.3.4. RUNNINGIN
  • 2.4. PRODUCT IDENTIFICATION
  • 2.4.1. MACHINE SERIAL NUMBER
  • 2.4.2. MACHINE IDENTIFICATION PLATE AND PRODUCT IDENTIFICATION NUMBER (PIN)
  • 2.4.3. ENGINE SERIAL NUMBER AND EXHAUST GAS EMISSION PLATE
  • 2.4.4. TRAVEL REDUCTION GEAR SERIAL NUMBER
  • 2.4.5. SWING REDUCTION GEAR SERIAL NUMBER
  • 2.4.6. CAB SERIAL NUMBER
  • 2.4.7. SERIAL NUMBERS AND DEALERS ADDRESS
  • 3. SAFETY ANDACCIDENT PREVENTION
  • 3.1. SAFETY, NOISE AND VIBRATION PLATES
  • 3.1.1. POSITION OF THE SAFETY PLATES
  • 3.1.2. PICTOGRAMS AND RELEVANT MEANINGS
  • 3.1.3. POSITION OF THE NOISE PLATES
  • 3.1.4. VIBRATIONS TO WHICH THE OPERATOR IS SUBJECTED
  • 3.2. GENERAL PRECAUTIONS
  • 3.2.1. GENERAL SAFETY RULES
  • 3.2.2. SAFETY DEVICES AND GUARDS
  • 3.2.3. CLOTHING AND PERSONAL PROTECTION ITEMS
  • 3.2.4. UNAUTHORIZED MODIFICATIONS
  • 3.2.5. LEAVING THE OPERATORS SEAT
  • 3.2.6. GETTING ON AND OFF THE MACHINE
  • 3.2.7. PREVENTING FIRES DUE TO FUEL AND OIL
  • 3.2.8. PREVENTING BURNS
  • 3.2.9. PREVENTING DAMAGE DUE TO ASBESTOS POWDER
  • 3.2.10. PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT
  • 3.2.11. FIRE EXTINGUISHERS AND FIRST AID KIT
  • 3.2.12. PRECAUTIONS CONCERNING THE CAB STRUCTURE
  • 3.2.13. PRECAUTIONS CONCERNING THE EQUIPMENT
  • 3.3. PRECAUTIONS TO BE TAKEN BEFORE STARTING THE ENGINE
  • 3.3.1. SAFETY ON THE WORK SITE
  • 3.3.2. FIRE PREVENTION
  • 3.3.3. PRECAUTIONS TO BE TAKEN FOR THE OPERATORS CAB
  • 3.3.4. ROOM VENTILATION
  • 3.3.5. PRECAUTIONS TO BE TAKEN FOR THE LIGHTS
  • 3.3.6. CLEANING THE WINDOWS AND THE REARVIEW MIRRORS CHECKING THE WINDSHIELD WIPER BLADES
  • 3.4. PRECAUTIONS TO BE TAKEN WHEN WORKING
  • 3.4.1. STARTING THE ENGINE
  • 3.4.2. CHECK THE DIRECTION BEFORE STARTING THE MACHINE
  • 3.4.3. CHECKS FOR TRAVELLING IN REVERSE
  • 3.4.4. MOVING THE MACHINE
  • 3.4.5. MOVING ON SLOPES
  • 3.4.6. WORKING ON SLOPES
  • 3.4.7. UNAUTHORIZED OPERATIONS
  • 3.4.8. PREVENTING ELECTROCUTION
  • 3.4.9. VISIBILITY
  • 3.4.10. WORKING ON ICY OR SNOWCOVERED SURFACES
  • 3.4.11. PREVENTING DAMAGE CAUSED BY THE WORK EQUIPMENT
  • 3.4.12. WORKING ON LOOSE GROUND
  • 3.4.13. PARKING THE MACHINE
  • 3.5. TRANSPORTING THE MACHINE ON OTHER VEHICLES
  • 3.5.1. LOADING AND UNLOADING THE MACHINE
  • 3.5.2. SHIPPING
  • 3.6. BATTERY
  • 3.6.1. SAFETY PRECAUTIONS FOR WORK ON BATTERIES
  • 3.6.2. STARTING WITH BOOSTER CABLES
  • 3.7. PRECAUTIONS FOR EMERGENCY RECOVERY
  • 3.8. PRECAUTIONS TO BE TAKEN DURING MAINTENANCE
  • 3.8.1. WARNING PLATES
  • 3.8.2. TOOLS
  • 3.8.3. PERSONNEL
  • 3.8.4. EQUIPMENT
  • 3.8.5. WORKING UNDER THE MACHINE
  • 3.8.6. KEEPING THE MACHINE CLEAN
  • 3.8.7. USE OF THE ENGINE DURING MAINTENANCE
  • 3.8.8. PERIODICAL CHANGE OF THE PARTS THAT ARE CRITICAL FOR SAFETY
  • 3.8.9. STOP THE ENGINE BEFORE CARRYING OUT ANY MAINTENANCE OPERATION OR INSPECTION
  • 3.8.10. RULES FOR REFUELLING AND ADDING OIL
  • 3.8.11. CHECKING THE COOLANT LEVEL IN THE RADIATOR
  • 3.8.12. USING LAMPS
  • 3.8.13. PRECAUTIONS CONCERNING THE BATTERY AND THE ALTERNATOR
  • 3.8.14. PRECAUTIONS CONCERNING THE STARTER
  • 3.8.15. PRECAUTIONS CONCERNING HIGHPRESSURE HOSES
  • 3.8.16. PRECAUTIONS TO BE TAKEN WHEN WORKING ON HIGHPRESSURE SYSTEMSE
  • 3.8.17. PRECAUTIONS FOR MAINTENANCE WORK INVOLVING HIGH TEMPERATURES AND PRESSURES
  • 3.8.18. COOLING FAN AND FAN BELT
  • 3.8.19. WASTE MATERIALS
  • 3.8.20. PRECAUTIONS FOR THE USE OF THE synthetic biodegradable oil type HEES
  • 4. THE MACHINE ANDITS OPERATIONS
  • 4.1. SAFETY LOCKS
  • 4.1.1. MACHINE LOCKS
  • 4.2. GENERAL VIEWS
  • 4.2.1. FRONT GENERAL VIEW (MONOBOOM)
  • 4.2.2. FRONT GENERAL VIEW (TWOPIECE BOOM)
  • 4.2.3. CAB INSIDE GENERAL VIEW
  • 4.3. INSTRUMENTS AND CONTROLS
  • 4.3.1. INSTRUMENTS
  • 4.3.2. WARNING LIGHTS
  • 4.3.3. SWITCHES AND PUSH BUTTONS
  • 4.3.4. ELECTRICAL ACCESSORIES
  • 4.3.5. MACHINE CONTROLS
  • 4.4. FUSES AND RELAYS
  • 4.4.1. CENTRAL UNIT FUSES AND RELAYS
  • 4.4.2. ENGINE LINE FUSES AND RELAYS
  • 4.4.3. FUSES AND RELAYS OF THE AIR CONDITIONING SYSTEM (if provided)
  • 4.5. GUARDS AND DRIVERS SEAT
  • 4.5.1. ENGINE HOOD
  • 4.5.2. SIDE COVER
  • 4.5.4. VENTILATION AND HEATING
  • 4.5.5. AIR CONDITIONER (if provided)
  • 4.5.6. SEAT
  • 4.5.7. SAFETY BELT
  • 4.5.8. EMERGENCY EXIT
  • 4.5.9. TECHNICAL DOCUMENTATION CASE
  • 4.5.10. FIRE EXTINGUISHER
  • 4.5.11. FIRST AID KIT
  • 4.6. USE OF THE MACHINE
  • 4.6.1. CHECKS BEFORE STARTING THE ENGINE
  • 4.6.2. STARTING THE ENGINE
  • 4.6.3. WARMING THE ENGINE
  • 4.6.4. HEATING THE HYDRAULIC OIL
  • 4.6.5. HOW TO MOVE THE MACHINE
  • 4.7. PARKING THE MACHINE
  • 4.7.1. PARKING ON LEVEL GROUND
  • 4.7.2. PARKING ON SLOPES
  • 4.8. STOPPING THE ENGINE
  • 4.9. TRANSPORTING THE MACHINE ON OTHER VEHICLES
  • 4.9.1. LOADING AND UNLOADING THE MACHINE
  • 4.9.2. TRANSPORT
  • 4.10. PRECAUTIONS TO BE TAKEN IN THE COLD SEASON
  • 4.10.1. FUEL AND LUBRICANTS
  • 4.10.2. COOLANT
  • 4.10.3. BATTERY
  • 4.10.4. OTHER PRECAUTIONS
  • 4.10.5. PRECAUTIONS TO BE TAKEN AT THE END OF WORK
  • 4.11. PRECAUTIONS TO BE TAKEN IN THE WARM SEASON
  • 4.12. USING THE WORK EQUIPMENT
  • 4.12.1. ORGANIZING THE WORK AREA
  • 4.12.2. POSITIONING THE BUCKET ACCORDING TO THE WORK TO BE CARRIED OUT
  • 4.12.3. POSITIONING THE MACHINE FOR DIGGING OPERATIONS
  • 4.12.4. DIGGING METHOD
  • 4.12.5. CHANGING THE BUCKET
  • 4.13. LONG PERIODS OF INACTIVITY
  • 4.13.1. BEFORE THE PERIOD OF INACTIVITY
  • 4.13.2. DURING THE PERIOD OF INACTIVITY
  • 4.13.3. AFTER THE PERIOD OF INACTIVITY
  • 4.14. TROUBLESHOOTING
  • 4.14.1. HOW TO REMOVE THE MACHINE
  • 4.14.2. IF THE FUEL HAS BEEN COMPLETELY DEPLETED
  • 4.14.3. IF THE BATTERY IS DEPLETED
  • 4.14.4. OTHER TROUBLES
  • 5. MAINTENANCE
  • 5.1. GUIDE TO MAINTENANCE
  • 5.2. MAINTENANCE NOTES
  • 5.2.1. NOTES REGARDING THE ENGINE
  • 5.2.2. NOTES REGARDING THE HYDRAULIC SYSTEM
  • 5.2.3. NOTES REGARDING THE ELECTRICAL SYSTEM
  • 5.2.4. NOTES REGARDING LUBRICATION
  • 5.2.5. PARTS SUBJECT TO WEAR THAT PERIODICALLY NEED CHANGING
  • 5.3. FUEL, COOLANT AND LUBRICANTS
  • 5.3.1. HOMOLOGATED HEES SYNTHETIC BIODEGRADABLE LUBRICANTS
  • 5.4. DRIVING TORQUES FOR SCREWS AND NUTS
  • 5.4.1. STANDARD DRIVING TORQUES
  • 5.4.2. SPECIFIC DRIVING TORQUES
  • 5.5. LUBRICATION
  • 5.5.1. LUBRICATION DIAGRAM
  • 5.6. PERIODICAL CHANGE OF THE COMPONENTS CONNECTED WITH SAFETY
  • 5.6.1. CRITICAL PARTS FOR SAFETY
  • 5.7. MAINTENANCE PLAN
  • 5.7.1. WHEN REQUIRED
  • 5.7.2. MAINTENANCE INTERVALS IN CASE OF USE OF THE DEMOLITION HAMMER
  • 5.7.3. CHECKS BEFORE STARTING
  • 5.7.4. MAINTENANCE EVERY 10 HOURS OF OPERATION
  • 5.7.5. MAINTENANCE AFTER THE FIRST 50 HOURS OF OPERATION (Only for machines in which the synthetic biodegradable oil type HEES is used)
  • 5.7.6. MAINTENANCE EVERY 50 HOURS OF OPERATION
  • 5.7.7. MAINTENANCE EVERY 100 HOURS OF OPERATION
  • 5.7.8. MAINTENANCE AFTER THE FIRST 250 HOURS OF OPERATION
  • 5.7.9. MAINTENANCE EVERY 250 HOURS OF OPERATION
  • 5.7.10. MAINTENANCE AFTER THE FIRST 500 HOURS OF OPERATION (Only for machines in which the synthetic biodegradable oil type HEES is used)
  • 5.7.11. MAINTENANCE EVERY 500 HOURS OF OPERATION
  • 5.7.12. MAINTENANCE EVERY 1000 HOURS OF OPERATION
  • 5.7.13. MAINTENANCE EVERY 2000 HOURS OF OPERATION
  • 5.7.14. MAINTENANCE EVERY 4000 HOURS OF OPERATION
  • 6. TECHNICALSPECIFICATIONS
  • 6.1. TECHNICAL DATA
  • 6.1.1. STANDARD OVERALL DIMENSIONS
  • 6.1.2. TECHNICAL CHARACTERISTICS
  • 6.1.3. LIFTING CAPACITIES (Only for machines with overload alarm device)
  • 7. AUTHORISEDOPTIONALEQUIPMENT
  • 7.1. AUTHORIZED OPTIONAL EQUIPMENT
  • 7.1.1. PRECAUTIONS REGARDING SAFETY
  • 7.1.2. PRECAUTIONS REGARDING THE INSTALLATION OF EQUIPMENT
  • 7.1.3. CHARACTERISTICS OF THE OPTIONAL EQUIPMENT
  • 7.2. ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER
  • 7.2.1. DESCRIPTION AND OPERATION
  • 7.2.2. USE OF THE DEMOLITION HAMMER AND RULES TO BE OBSERVED
  • 7.2.3. INSTALLING AND REMOVING THE DEMOLITION HAMMER
  • 7.2.4. MAINTENANCE
  • 7.3. CLAMSHELL BUCKET
  • 7.3.1. DESCRIPTION AND OPERATION
  • 7.3.2. INSTALLING THE CLAMSHELL BUCKET
  • 7.3.3. MAINTENANCE
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC95R-2 Hydraulic Excavator Operation and Maintenance Manual WEAM001504”

Your email address will not be published. Required fields are marked *