JCB JS Auto Range – Tracked Excavators – JCB Engine Operator Manual 9821-2450

$20.00

  • Type Of Manual: Operator Manual
  • ManualID: 9821-2450
  • Number of Pages: 298
  • Size: 53.5MB
  • Format: PDF

Description

  • Model List:

    • JS Auto Range – Tracked Excavators – JCB Engine
  • 1. Safety Notices
  • 2. Important Information …………………………………………………………………………1
  • 3. The Operator Manual …………………………………………………………………….1
  • 4. Safety Warnings ……………………………………………………………………………1
  • 5. Introduction
  • 6. About this Manual ………………………………………………………………………………3
  • 7. Machine Model and Serial Number ………………………………………………….3
  • 8. Using this Manual ………………………………………………………………………….3
  • 9. Left Side, Right Side ………………………………………………………………………3
  • 10. Cross References ………………………………………………………………………….3
  • 11. Machine Description …………………………………………………………………………..4
  • 12. The JCB Tracked Excavator ……………………………………………………………4
  • 13. Intended Use ………………………………………………………………………………..4
  • 14. Component Location ……………………………………………………………………..6
  • 15. Safety Check List ……………………………………………………………………………….8
  • 16. Safety – Yours and Others ………………………………………………………………8
  • 17. General Safety ……………………………………………………………………………..8
  • 18. Operating Safety …………………………………………………………………………10
  • 19. Maintenance Safety ……………………………………………………………………..13
  • 20. Safety Labels …………………………………………………………………………………..18
  • 21. Introduction …………………………………………………………………………………18
  • 22. Safety Label Identification …………………………………………………………….19
  • 23. Identifying Your Machine …………………………………………………………………..23
  • 24. Machine Identification Plate ………………………………………………………….23
  • 25. Component Identification Plates …………………………………………………….24
  • 26. Machine Security ……………………………………………………………………………..27
  • 27. Introduction …………………………………………………………………………………27
  • 28. JCB Plantguard …………………………………………………………………………..27
  • 29. Construction Equipment Security And Registration Scheme (CESAR) .27
  • 30. LiveLink ……………………………………………………………………………………..27
  • 31. Immobiliser …………………………………………………………………………………27
  • 32. Operation
  • 33. Introduction ……………………………………………………………………………………..29
  • 34. Before Entering the Cab ……………………………………………………………………30
  • 35. Entering and Leaving the Cab ……………………………………………………………31
  • 36. Standard Cab Machines ……………………………………………………………….31
  • 37. Hydraulically Raised Cab Machines ……………………………………………….32
  • 38. Fixed Raised Cab Machines …………………………………………………………33
  • 39. Emergency Exit …………………………………………………………………………..35
  • 40. Doors and Windows …………………………………………………………………………36
  • 41. Opening and Closing the Door ………………………………………………………36
  • 42. Opening and Closing the Front Upper Window ………………………………..37
  • 43. Opening and Closing The Front Lower Window ……………………………….38
  • 44. Door Sliding Window ……………………………………………………………………40
  • 45. Opening and Closing the Sunblind …………………………………………………41
  • 46. Access to the Upper Structure ……………………………………………………………43
  • 47. Standard Machines ………………………………………………………………………43
  • 48. Seat Controls …………………………………………………………………………………..44
  • 49. Introduction …………………………………………………………………………………44
  • 50. Operators Seat-Console ……………………………………………………………….44
  • 51. Operators Seat – Standard-Heated …………………………………………………44
  • 52. Air Suspension Seat …………………………………………………………………….45
  • 53. Seat Belts (if fitted) …………………………………………………………………………..46
  • 54. Static Seat Belt ……………………………………………………………………………46
  • 55. Visibility Aids ……………………………………………………………………………………47
  • 56. Mirrors ……………………………………………………………………………………….47
  • 57. Cab Layout ……………………………………………………………………………………..51
  • 58. Components Key …………………………………………………………………………51
  • 59. Drive Controls, Switches and Instruments ……………………………………………53
  • 60. Drive Controls ……………………………………………………………………………..53
  • 61. Switches …………………………………………………………………………………….54
  • 62. Instruments …………………………………………………………………………………62
  • 63. Air Conditioning and Heater Controls ……………………………………………..67
  • 64. Operating Levers-Pedals …………………………………………………………………..69
  • 65. Excavating Controls …………………………………………………………………….69
  • 66. Travel Speed Change Button ………………………………………………………..76
  • 67. Operation Levers …………………………………………………………………………77
  • 68. Optional Circuit Pedal (if fitted) ………………………………………………………78
  • 69. ISO Operating Method …………………………………………………………………78
  • 70. Safety Equipment …………………………………………………………………………….79
  • 71. Control Locks ……………………………………………………………………………..79
  • 72. Dipper Stroke Limiter (If fitted) ……………………………………………………….80
  • 73. Overload Warning System …………………………………………………………….83
  • 74. Before Starting the Engine …………………………………………………………………84
  • 75. Starting the Engine …………………………………………………………………………..85
  • 76. Warming-Up ……………………………………………………………………………….86
  • 77. JCB Immobiliser System ………………………………………………………………87
  • 78. Getting the Machine Moving ………………………………………………………………89
  • 79. Stopping and Parking the Machine ……………………………………………………..90
  • 80. Stopping and Parking …………………………………………………………………..90
  • 81. Engine Shutdown ………………………………………………………………………..91
  • 82. Working with your Machine ……………………………………………………………….92
  • 83. Operating Practices and Site Safety ………………………………………………92
  • 84. Clothing and Safety Equipment ……………………………………………………..92
  • 85. Danger Zone ………………………………………………………………………………92
  • 86. Log Moving-Handling ……………………………………………………………………92
  • 87. Safety Practices ………………………………………………………………………….92
  • 88. Working With the Excavator ………………………………………………………….94
  • 89. Lifting (Object Handling) ……………………………………………………………..101
  • 90. Hydraulically Raised Cab (if fitted) ……………………………………………….104
  • 91. Use of Machines on Gradients and Slopes ……………………………………106
  • 92. Pulling out of Soft Ground …………………………………………………………..109
  • 93. Water ………………………………………………………………………………………. 110
  • 94. Towing Other Equipment ……………………………………………………………. 110
  • 95. Machine Stability ………………………………………………………………………. 111
  • 96. Reducing Wear …………………………………………………………………………. 112
  • 97. Operating Environment …………………………………………………………………… 115
  • 98. Maintenance in Cold Climates …………………………………………………….. 115
  • 99. Operating in a Cold Climate (Below 0°C) ……………………………………… 115
  • 100. Operating in a Hot Climate (Above 35°C) …………………………………….. 115
  • 101. Operating in Dusty or Sandy Areas ……………………………………………… 116
  • 102. Operating in Coastal Regions …………………………………………………….. 116
  • 103. Operating on Wet or Soft Ground ………………………………………………… 116
  • 104. Cab Filters ……………………………………………………………………………….. 116
  • 105. Refuelling the Machine …………………………………………………………………… 117
  • 106. Low Fuel Levels ……………………………………………………………………….. 117
  • 107. Filling the Tank …………………………………………………………………………. 117
  • 108. Fuel Level ………………………………………………………………………………… 118
  • 109. Refuelling Pump ……………………………………………………………………….. 119
  • 110. Moving a Disabled Machine …………………………………………………………….120
  • 111. Lowering the Boom in an Emergency …………………………………………..120
  • 112. Retrieval …………………………………………………………………………………..120
  • 113. Limp Mode ………………………………………………………………………………..121
  • 114. Transporting the Machine ………………………………………………………………..122
  • 115. Lifting the Machine …………………………………………………………………………124
  • 116. JS115 – JS220 Machines …………………………………………………………….124
  • 117. Storage of the Machine …………………………………………………………………..126
  • 118. Introduction ……………………………………………………………………………….126
  • 119. Storage Area …………………………………………………………………………….126
  • 120. Prepare the Machine for Storage …………………………………………………126
  • 121. Put the Machine into Storage ………………………………………………………126
  • 122. During Storage ………………………………………………………………………….126
  • 123. Take the Machine Out of Storage …………………………………………………127
  • 124. Anti-Vandalism Guards (option) ………………………………………………………..128
  • 125. Unpacking the Guards ………………………………………………………………..128
  • 126. Fitting the Guards ………………………………………………………………………128
  • 127. Removing the Guards ………………………………………………………………..129
  • 128. Storing the Guards …………………………………………………………………….129
  • 129. Routine Maintenance
  • 130. Service Requirements …………………………………………………………………….131
  • 131. Introduction ……………………………………………………………………………….131
  • 132. Owner-Operator Support …………………………………………………………….131
  • 133. Service-Maintenance Agreements ……………………………………………….131
  • 134. Fit for Purpose Tests for Lifting Equipment …………………………………….132
  • 135. Obtaining Replacement Parts ………………………………………………………132
  • 136. Health and Safety …………………………………………………………………………..133
  • 137. Lubricants …………………………………………………………………………………133
  • 138. Battery ……………………………………………………………………………………..135
  • 139. Service Schedules ………………………………………………………………………….137
  • 140. Introduction ……………………………………………………………………………….137
  • 141. How to Use the Service Schedules ………………………………………………137
  • 142. Calendar Equivalents …………………………………………………………………137
  • 143. Pre Start Cold Checks, Service Points and Fluid Levels ………………….138
  • 144. Functional Test and Final Inspection …………………………………………….142
  • 145. Service Intervals for Attachments …………………………………………………144
  • 146. Periodic Replacement of Safety Related Components ……………………145
  • 147. Fluids, Lubricants and Capacities ……………………………………………………..146
  • 148. JS115-JS130-JS145 and Variants ………………………………………………..146
  • 149. JS160-JS180 and Variants ………………………………………………………….147
  • 150. JS200-JS210-JS220 and Variants ………………………………………………..148
  • 151. Typical Lubrication Chart …………………………………………………………….149
  • 152. Coolant Mixtures ……………………………………………………………………….150
  • 153. Fuel …………………………………………………………………………………………151
  • 154. Tools …………………………………………………………………………………………….154
  • 155. Carrying Tools onto the Machine ………………………………………………….154
  • 156. Locations ………………………………………………………………………………….154
  • 157. Prepare the Machine for Maintenance ………………………………………………155
  • 158. Introduction ……………………………………………………………………………….155
  • 159. How to Make the Machine Safe (Excavator Lowered) …………………….155
  • 160. Cleaning the Machine ……………………………………………………………………..156
  • 161. Introduction ……………………………………………………………………………….156
  • 162. Preparing the Machine for Cleaning ……………………………………………..156
  • 163. Cleaning the Machine …………………………………………………………………157
  • 164. Cleaning the Tracks ……………………………………………………………………157
  • 165. Cleaning the Radiator and Oil Cooler ……………………………………………157
  • 166. Checking for Damage ……………………………………………………………………..158
  • 167. Check the Machine Body and Structure ………………………………………..158
  • 168. Check the Seat and Seat Belt ……………………………………………………..158
  • 169. Checking the FOPS Structure ……………………………………………………..158
  • 170. Daily Checking ……………………………………………………………………………….160
  • 171. Greasing ……………………………………………………………………………………….162
  • 172. Introduction ……………………………………………………………………………….162
  • 173. Slew Ring Bearing ……………………………………………………………………..162
  • 174. Slew Ring Teeth and Slew Pinion …………………………………………………162
  • 175. Greasing Points …………………………………………………………………………163
  • 176. Electrical System ……………………………………………………………………………165
  • 177. Battery ……………………………………………………………………………………..165
  • 178. Jump-Starting the Engine ……………………………………………………………168
  • 179. Fuses and Relays – Cab ……………………………………………………………..169
  • 180. Fuses and Relays – Battery Bay …………………………………………………..171
  • 181. Bolt and Nut Torque Specifications ……………………………………………………173
  • 182. JS115-JS220 and Variants ………………………………………………………….173
  • 183. Engine ………………………………………………………………………………………….179
  • 184. Oil and Filter ……………………………………………………………………………..179
  • 185. Cooling System …………………………………………………………………………181
  • 186. Engine Air Filter …………………………………………………………………………184
  • 187. Fan Belt ……………………………………………………………………………………186
  • 188. Front End Accessory Drive Belt …………………………………………………..187
  • 189. Crankcase Ventilation (if fitted, JS200-220) …………………………………..188
  • 190. Fuel System …………………………………………………………………………………..189
  • 191. Introduction ……………………………………………………………………………….189
  • 192. Draining Fuel Tank Impurities ………………………………………………………189
  • 193. Draining the Primary Fuel Filter-Sedimenter ………………………………….190
  • 194. Changing the Primary Fuel Filter-Sedimenter Element ……………………191
  • 195. Draining the Main Fuel Filter-Sedimenter ………………………………………192
  • 196. Changing the Main Fuel Filter-Sedimenter Element ………………………..193
  • 197. Draining the Engine Fuel Filter-Sedimenter …………………………………..194
  • 198. Changing the Engine Fuel Filter-Sedimenter Element …………………….194
  • 199. Bleeding the System ………………………………………………………………….195
  • 200. Hydraulic System ……………………………………………………………………………196
  • 201. Introduction ……………………………………………………………………………….196
  • 202. Releasing Tank Pressure ……………………………………………………………197
  • 203. Releasing the Hydraulic Pressure ………………………………………………..197
  • 204. Oil and Filters ……………………………………………………………………………198
  • 205. Draining Water and Sediment from the Hydraulic Tank ……………………205
  • 206. Air Bleeding Procedures ……………………………………………………………..205
  • 207. Slew Gearbox ………………………………………………………………………………..207
  • 208. Checking the Slew Gearbox Oil Level …………………………………………..207
  • 209. Changing the Slew Gearbox Oil …………………………………………………..207
  • 210. Tracks and Running Gear ……………………………………………………………….208
  • 211. Tracks ………………………………………………………………………………………208
  • 212. Running Gear ……………………………………………………………………………210
  • 213. Bucket …………………………………………………………………………………………. 211
  • 214. Checking-Adjusting For Side Play ……………………………………………….. 211
  • 215. Windscreen Washer ……………………………………………………………………….212
  • 216. Checking the Level …………………………………………………………………….212
  • 217. Fire Extinguisher (If fitted) ……………………………………………………………….213
  • 218. Troubleshooting ……………………………………………………………………………..214
  • 219. Engine and Related Area ……………………………………………………………214
  • 220. Monitor Display – Fault Messages ………………………………………………..217
  • 221. Operations ………………………………………………………………………………..218
  • 222. Hydraulic pump …………………………………………………………………………219
  • 223. Working Attachments …………………………………………………………………220
  • 224. Travel ……………………………………………………………………………………….221
  • 225. Slew …………………………………………………………………………………………222
  • 226. Hydraulic ram ……………………………………………………………………………222
  • 227. Optional Attachments
  • 228. Introduction ……………………………………………………………………………………223
  • 229. Attachments For Your Machine ………………………………………………………..224
  • 230. Connecting-Disconnecting Hydraulic Hoses ……………………………………….225
  • 231. Introduction ……………………………………………………………………………….225
  • 232. Connecting the Hydraulic Hoses ………………………………………………….225
  • 233. Disconnecting the Hydraulic Hoses ………………………………………………226
  • 234. Quick Release Couplings ……………………………………………………………227
  • 235. Operating Attachments ……………………………………………………………………229
  • 236. Grab-Changeover Valves (if fitted) ……………………………………………….230
  • 237. Hydraulic Rockbreaker ……………………………………………………………………232
  • 238. Preparation ……………………………………………………………………………….232
  • 239. Operation and Maintenance ………………………………………………………..232
  • 240. Hammer Speed Settings …………………………………………………………….233
  • 241. Crusher …………………………………………………………………………………………235
  • 242. General …………………………………………………………………………………….235
  • 243. Preparation ……………………………………………………………………………….235
  • 244. Weedcutter ……………………………………………………………………………………236
  • 245. Operation ………………………………………………………………………………….236
  • 246. Maintenance ……………………………………………………………………………..236
  • 247. Specifications
  • 248. Static Dimensions …………………………………………………………………………..237
  • 249. JS115 – Monoboom ……………………………………………………………………237
  • 250. JS130 – Monoboom ……………………………………………………………………238
  • 251. JS145 – Monoboom ……………………………………………………………………239
  • 252. JS145HD – Monoboom ……………………………………………………………….240
  • 253. JS145 – Triple Articulated Boom …………………………………………………..241
  • 254. JS160 – Monoboom ……………………………………………………………………242
  • 255. JS160 – Triple Articulated Boom …………………………………………………..243
  • 256. JS180 – Monoboom ……………………………………………………………………244
  • 257. JS180 – Triple Articulated Boom …………………………………………………..245
  • 258. JS200-210-220 – Monoboom ……………………………………………………….246
  • 259. JS200-210-220 – Triple Articulated Boom ………………………………………247
  • 260. Dig Depth Chart ……………………………………………………………………………..248
  • 261. JS115 – Monoboom ……………………………………………………………………248
  • 262. JS130 – Monoboom ……………………………………………………………………249
  • 263. JS145 – Monoboom ……………………………………………………………………250
  • 264. JS145HD – Monoboom ……………………………………………………………….251
  • 265. JS145 – Triple Articulated Boom …………………………………………………..252
  • 266. JS160 – Monoboom ……………………………………………………………………253
  • 267. JS160 – Triple Articulated Boom …………………………………………………..254
  • 268. JS180 – Monoboom ……………………………………………………………………255
  • 269. JS180 – Triple Articulated Boom …………………………………………………..256
  • 270. JS200-210-220 – Monoboom ……………………………………………………….257
  • 271. JS200-210-220 – Triple Articulated Boom ………………………………………258
  • 272. Shipping Weight …………………………………………………………………………….259
  • 273. Travel Speeds ………………………………………………………………………………..261
  • 274. Noise Data …………………………………………………………………………………….262
  • 275. Introduction ……………………………………………………………………………….262
  • 276. All Machines ……………………………………………………………………………..262
  • 277. Vibration Data ………………………………………………………………………………..263
  • 278. Introduction ……………………………………………………………………………….263
  • 279. JS115-145 ………………………………………………………………………………..264
  • 280. JS160-JS180 …………………………………………………………………………….265
  • 281. Lifting (Object Handling) Regulations and Safe Working Loads …………….266
  • 282. Introduction ……………………………………………………………………………….266
  • 283. Load Charts ………………………………………………………………………………267
  • 284. Warranty Information
  • 285. Machine Service Record Sheet ………………………………………………………..283
  • 286. Registration Information ………………………………………………………………….285
  • 287. European Community Standards
  • 288. EC Declaration of Conformity …………………………………………………………..287
  • 289. Introduction ………
Rate this product
Reviews

There are no reviews yet.

Be the first to review “JCB JS Auto Range – Tracked Excavators – JCB Engine Operator Manual 9821-2450”

Your email address will not be published. Required fields are marked *