JCB JS200W Operator Handbook 9801-6880

$20.00

  • Type Of Manual: Operator Handbook
  • ManualID: 9801-6880
  • Number of Pages: 134
  • Size: 2.4MB
  • Format: PDF

Description

  • Model List:

    • JS200W
  • 1. INTRODUCTION
  • 2. About this Handbook
  • 3. Machine and Serial Numbers 1
  • 4. Using this Handbook 1
  • 5. Left and Right Hand Convention 1
  • 6. Units of Measurement. 1
  • 7. Service Contract 1
  • 8. Safety First – Yours and Other People's 2
  • 9. Safety First – Check List
  • 10. General Safety 2
  • 11. Operating Safety 3
  • 12. Maintenance Safety 4
  • 13. Safety Decals 6
  • 14. Identifying Your Machine 8
  • 15. OPERATION
  • 16. Introduction 21
  • 17. Before Entering the Cab 21
  • 18. Entering and Leaving the Cab 22
  • 19. Cab Door
  • 20. Opening-Closing the Door 23
  • 21. Cab Windows
  • 22. Opening-Closing the Upper Front Window 24
  • 23. Opening and Closing the Lower Front Window 25
  • 24. Emergency Exit 25
  • 25. Opening-Closing the Sunblind 25
  • 26. Adjusting the Seat 26
  • 27. Adjusting the Steering Column 27
  • 28. Seat Belt
  • 29. Fasten the Seatbelt 27
  • 30. Release the Seatbelt 27
  • 31. Adjusting the Seatbelt 27
  • 32. Heater Controls 28
  • 33. Cigar Lighter 28
  • 34. Cab Radio 29
  • 35. Cab Layout 30
  • 36. Switches and Controls
  • 37. Right Console 31
  • 38. Left Console 35
  • 39. Cab Light Switch 37
  • 40. Multipurpose Steering Column Switch 38
  • 41. Monitor Panel 39
  • 42. Servo Controls Immobilisation 43
  • 43. Driving Controls
  • 44. Steering Wheel 44
  • 45. Speed Controls 44
  • 46. Travel Pedal 44
  • 47. Foot Brake Pedal 45
  • 48. Parking Brake Switch 45
  • 49. Excavating Controls
  • 50. Excavating 46
  • 51. Operation 46
  • 52. Boom and Bucket 47
  • 53. Superstructure and Dipper 48
  • 54. Other Controls
  • 55. Horn Button 49
  • 56. One Touch Idle Switch 49
  • 57. Slew Lock Lever 49
  • 58. Triple Articulated Boom Position Ram (if fitted) 50
  • 59. Dozer Blade (if fitted) 50
  • 60. Stabilisers (if fitted) 51
  • 61. Attachments Control (if fitted) 52
  • 62. Preparing for Road Travel 53
  • 63. Before Starting the Engine 55
  • 64. Starting the Engine
  • 65. Normal Conditions 56
  • 66. Cold Conditions 56
  • 67. Jump Starting the Engine 57
  • 68. Manual Engine Warm-up
  • 69. After Starting 58
  • 70. Warming-up Procedure 58
  • 71. Cold Climate Warm-up 58
  • 72. Stopping the Engine
  • 73. Routine Stopping 59
  • 74. Stopping Following Overheating 59
  • 75. Parking the Machine 59
  • 76. Operating Precautions
  • 77. In Low Temperatures 60
  • 78. In High Temperatures 60
  • 79. In Dusty or Sandy Areas 60
  • 80. In Coastal Regions 60
  • 81. Cleaning the Machine 88
  • 82. Checking for Damage 88
  • 83. Seat Belt
  • 84. Checking the Seat Belt Condition and Security 88
  • 85. Greasing
  • 86. Slew Ring Teeth and Slew Pinion 89
  • 87. Slew Ring Bearing 89
  • 88. Greasing (50 hours) 90
  • 89. Greasing (General) 92
  • 90. Tyres and Wheels
  • 91. Tyre Inflation 93
  • 92. Checking the Wheel Nut Torques 93
  • 93. Engine Air Filter
  • 94. Changing the Outer Element 94
  • 95. Changing the Inner Element 95
  • 96. Engine Oil and Filter
  • 97. Checking the Oil Level – JCB Diesel 96
  • 98. Changing the Oil and Filter – JCB Diesel 96
  • 99. Checking the Oil Level – Isuzu 97
  • 100. Changing the Oil and Filter – Isuzu 97
  • 101. Engine Cooling System
  • 102. Checking the Coolant Level 98
  • 103. Coolant Mixtures 98
  • 104. Changing the Coolant 99
  • 105. Cleaning the Radiator and Oil Cooler 99
  • 106. Adjusting the Fan Belt – JCB Diesel 100
  • 107. Fitting a New Fan Belt – JCB Diesel 100
  • 108. Adjusting the Fan Belt – Isuzu 101
  • 109. Fitting a New Fan Belt – Isuzu 101
  • 110. Fuel System
  • 111. Types of Fuel 102
  • 112. Filling the Tank 102
  • 113. Draining Fuel Tank Impurities 103
  • 114. Draining the Water Separator – JCB Diesel 103
  • 115. Cleaning the Water Separator – JCB Diesel 103
  • 116. Draining the Water Separator – Isuzu 103
  • 117. Cleaning the Lift Pump Gauze – JCB Diesel 104
  • 118. Draining the Filter – JCB Diesel 104
  • 119. Changing the Filter Element – JCB Diesel 104
  • 120. Prime the System – JCB Diesel 105
  • 121. Changing the Fuel Filter Element – Isuzu 106
  • 122. Prime the System – Isuzu 106
  • 123. Hydraulic System
  • 124. Checking the Fluid Level 107
  • 125. Releasing Tank Pressure 107
  • 126. Topping-up Fluid Level 107
  • 127. Changing the Fluid 108
  • 128. Changing the Return Filter Element 109
  • 129. Cleaning-Changing the Suction Strainer 109
  • 130. Changing the Nephron Filter 110
  • 131. Changing the Air Breather Element 111
  • 132. Transporting the Machine 61
  • 133. Using your Machine
  • 134. General 63
  • 135. Installing a Bucket 64
  • 136. Removing a Bucket 65
  • 137. Connecting Hydraulic Hoses 66
  • 138. Bucket Teeth 67
  • 139. Removing Bucket Teeth 68
  • 140. Fitting Bucket Teeth 68
  • 141. Using the Attachments and Site Safety 69
  • 142. Digging 71
  • 143. Digging Near Walls 72
  • 144. Digging on Slopes 72
  • 145. Dumping into a Truck 72
  • 146. Backfilling (with bucket) 72
  • 147. Dozing-Grading (with bucket) 72
  • 148. Scraping and Cutting (with bucket) 72
  • 149. Backfilling (with blade) 72
  • 150. Dozing-Grading (with blade) 72
  • 151. Scraping and Cutting (with blade) 72
  • 152. Lifting 73
  • 153. Pulling Out From Soft Ground 74
  • 154. Refuelling
  • 155. Fuel Level 75
  • 156. Filling the Tank 75
  • 157. Refuelling Pump (optional) 75
  • 158. Storage 76
  • 159. Towing a Disabled Machine 77
  • 160. MAINTENANCE
  • 161. Service Contracts 81
  • 162. Regular Maintenance and Lubrication Schedules
  • 163. Initial Precautions for New Machine Usage 81
  • 164. Every 10 Operating Hours or Daily 82
  • 165. Every 50 Operating Hours or Weekly 82
  • 166. Every 100 Operating Hours or 2-Weekly 83
  • 167. Every 250 Operating Hours or Monthly 83
  • 168. Every 500 Operating Hours or 3-Monthly 84
  • 169. Every 1000 Operating Hours or 6-Monthly 84
  • 170. Every 2000 Operating Hours or Yearly 84
  • 171. Every 4000 Operating Hours or 2 Years 85
  • 172. Every 5000 Operating Hours or 2 Years 6 Months 85
  • 173. Revised Service Schedules – Rockbreaker
  • 174. Crusher or Pulveriser Usage 86
  • 175. Lubricants – Health and Safety
  • 176. First Aid – Oil 87
  • 177. Hygiene 87
  • 178. Storage 87
  • 179. Handling 87
  • 180. Waste Disposal 87
  • 181. Spillage 87v CONTENTS v
  • 182. Draining Tank Impurities 111
  • 183. Changing the Servo Oil Filter 112
  • 184. Changing the Drain Line Filter Element 113
  • 185. Changing the Steering Line Filter Element 113
  • 186. Changing the Breaker In-line Filter (if fitted) 114
  • 187. Air Bleeding Procedures 115
  • 188. Gearboxes
  • 189. Checking the Slew Gearbox Oil Level 117
  • 190. Changing the Slew Gearbox Oil 117
  • 191. Replenishing Slew Gearbox Grease 118
  • 192. Checking the Drive Gearbox Oil Level 119
  • 193. Changing the Drive Gearbox Oil 119
  • 194. Front Axle
  • 195. Checking the Differential Oil Level 120
  • 196. Changing the Differential Oil 120
  • 197. Checking the Hub Oil Level 121
  • 198. Changing the Hub Oil 121
  • 199. Rear Axle
  • 200. Checking the Differential-Hub Oil Level 122
  • 201. Changing the Differential-Hub Oil 122
  • 202. Electrical System
  • 203. Fuses 123
  • 204. Battery
  • 205. First Aid – Electrolyte 125
  • 206. Checking the Electrolyte Level 125
  • 207. Warning Symbols 126
  • 208. Windscreen Washer 127
  • 209. Obtaining Replacement Parts 127
  • 210. Lubricants and Capacities 128
  • 211. Component Location Diagrams 130
  • 212. SPECIFICATIONS
  • 213. Lifting (Craning) Regulations and
  • 214. Safe Working Loads 141
  • 215. Static Dimensions
  • 216. JS200W 142
  • 217. Shipping Weight 143
  • 218. Tyre Pressures 143
  • 219. Dig Depth Chart
  • 220. JS200W 144
  • 221. Noise and Vibration Data 145
Rate this product
Reviews

There are no reviews yet.

Be the first to review “JCB JS200W Operator Handbook 9801-6880”

Your email address will not be published. Required fields are marked *