Description
-
Model List:
- 930E-5 Dump Truck
- 1. FOREWORD
- 2. TABLE OF CONTENTS
- 3. SAFETY RULES, TOOLS EQUIPMENT
- 4. TRUCK COMPONENTS AND SPECIFICATIONS
- 5. MAJOR COMPONENT WEIGHTS
- 6. FIELD WELDING FOR ASSEMBLY OR REPAIR
- 7. RECEIVING ASSEMBLY PREPARATION
- 8. CHASSIS ASSEMBLY
- 9. DUMP BODY ASSEMBLY
- 10. FINAL ASSEMBLY
- 11. FINAL CHECKOUT
- 12. APPENDIX
- 12.1. STANDARD TORQUE CHARTS AND CONVERSION TABLES
- 12.2. SUSPENSION OILING AND CHARGING PROCEDURES
- 12.3. SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
- 12.4. OIL AND NITROGEN SPECIFICATIONS CHART
- 12.5. FAN CLUTCH CHECKOUT PROCEDURE
- 12.6. ENGINE EMISSIONS AFTERTREATMENT SYSTEMS
- 12.7. TOEIN ADJUSTMENT
- 12.8. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
- 12.9. ELECTRIC CHECKOUT PROCEDURE
- 12.10. INTERFACE MODULE CHECKOUT PROCEDURE
- 12.11. ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
- 12.12. HYDRAULIC SYSTEM CHECKOUT
- 12.13. BRAKE SYSTEM CHECKOUT PROCEDURE
- 12.14. PRESHIFT BRAKE TEST TEST PROCEDURE
- 12.15. PAYLOAD METER IV CHECKOUT PROCEDURE
- 12.16. ALTERNATOR LOCK CHECKOUT PROCEDURE
- 12.17. KOMTRAX PLUS 2 SITE SETUP CHECKOUT PROCEDURE
- 12.18. KOMVISION CHECKOUT PROCEDURE
- 12.19. KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
- 12.20. RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
- 12.21. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
- 12.22. AUTOMATIC LUBRICATION SYSTEM
- 12.23. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
- 12.24. TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
- 12.25. REAR AXLE COOLING AIR PRESSURE SWITCH ADJUSTMENT AND TEST
- 12.26. FIELD ASSEMBLY INSPECTION REPORT
- 12.27. HOUR POSTCOMMISSIONING CHECKSHEET
















There are no reviews yet.