Description
-
Model List:
- 930E-5 Dump Truck
- 1. COVER
- 2. FOREWORD
- 3. TABLE OF CONTENTS
- 4. SAFETY RULES, TOOLS EQUIPMENT
- 5. TRUCK COMPONENTS AND SPECIFICATIONS
- 6. MAJOR COMPONENT WEIGHTS
- 7. FIELD WELDING FOR ASSEMBLY OR REPAIR
- 8. RECEIVING ASSEMBLY PREPARATION
- 9. CHASSIS ASSEMBLY
- 10. DUMP BODY ASSEMBLY
- 11. FINAL ASSEMBLY
- 12. FINAL CHECKOUT
- 13. APPENDIX
- 13.1. STANDARD TORQUE CHARTS AND CONVERSION TABLES
- 13.2. SUSPENSION OILING AND CHARGING PROCEDURES
- 13.3. SUSPENSION OILING AND CHARGING BLOCK KIT INSTALLATION PROCEDURE
- 13.4. OIL AND NITROGEN SPECIFICATIONS CHART
- 13.5. PARKING BRAKE BLEEDING/FLUSHING PROCEDURE
- 13.6. FAN CLUTCH CHECKOUT PROCEDURE
- 13.7. ENGINE EMISSIONS AFTERTREATMENT SYSTEMS IF EQUIPPED
- 13.8. TOEIN ADJUSTMENT
- 13.9. SEAT BELTS AND TETHERS CHECKOUT PROCEDURE
- 13.10. ELECTRIC CHECKOUT PROCEDURE
- 13.11. INTERFACE MODULE CHECKOUT PROCEDURE
- 13.12. ADDITIONAL ELECTRICAL CHECKOUT FOR TRUCKS WITH IM CONTROLS
- 13.13. HYDRAULIC SYSTEM CHECKOUT PROCEDURE
- 13.14. BRAKE SYSTEM CHECKOUT PROCEDURE
- 13.15. PRESHIFT BRAKE TEST TEST PROCEDURE
- 13.16. PAYLOAD METER IV CHECKOUT PROCEDURE
- 13.17. ALTERNATOR LOCK CHECKOUT PROCEDURE
- 13.18. KOMTRAX SHOP SETUP
- 13.19. KOMTRAX SITE SETUP
- 13.20. KOMVISION CHECKOUT PROCEDURE
- 13.21. KOMATSU WIRELESS BRIDGE CHECKOUT PROCEDURE
- 13.22. RETRACTABLE LADDER SYSTEM CHECKOUT PROCEDURE
- 13.23. AUTOMATIC LUBRICATION SYSTEM CHECKOUT PROCEDURE
- 13.24. AUTOMATIC LUBRICATION SYSTEM
- 13.25. AIR CONDITIONING SYSTEM CHECKOUT PROCEDURE
- 13.26. AUTOMATIC LUBRICATION SYSTEM PRIMING
- 13.27. TIRE MONITORING SYSTEM CHECKOUT PROCEDURE
- 13.28. REAR AXLE COOLING AIR PRESSURE SWITCH ADJUSTMENT AND TEST
- 13.29. FIELD ASSEMBLY INSPECTION REPORT
- 13.30. HOUR POSTCOMMISSIONING CHECKSHEET
















There are no reviews yet.