Description
-
Model List:
- D275AX-5E0 Bull Dozer
- 1. COVER
- 2. _02BodyPage(P75).pdf
- 2.1. Replacement of return filter (Standard filter to flushing filter) (2/2)
- 2.2. Assembly process No. M4 Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
- 2.3. Replacement of return filter (Flushing filter to standard filter) (2/2)
- 2.4. Bleeding air from hydraulic cylinders (Part 2)
- 2.4.1. Caution
- 2.4.1.1. After the assembly work is completed, flush the hydraulic circuit and bleed air from the hydraulic cylinders.
- 2.4.1.1.1. Flushing of fan circuit
- 2.4.1.2. Bleeding air and flushing of cylinder with piston valve (blade lift cylinder)
- 2.4.1.3. Bleading air and flushing of cylinder without piston valve (Blade tilt cylinder, ripper lift cylinder, ripper tilt cylinder)
- 2.4.1.3.1. Reinstall the removed return filter element (1) and valve (2).
- 2.4.2. State of inserted element
- 2.4.3. Caution
- 2.4.3.1. Bleading air from cylinder with piston valve (Blade lift cylinder)
- 2.4.3.2. Bleading air from cylinder without piston valve (Blade tilt cylinder, ripper lift cylinder, ripper tilt cylinder)
- 2.4.3.3. After bleeding the air, leave the engine stopped for 1 hour.
- 2.5. Replacement of return filter (Standard filter to flushing filter) (1/2)
- 3. odyPage(P64).pdf
- 3.1. Installation of operators cab (7/13)
















There are no reviews yet.