Komatsu D375A-6 Bull Dozer Field Assembly Instruction GEN00099-08

$30.00

  • Type Of Manual: Field Assembly Instruction
  • Manual ID: GEN00099-08
  • Format: PDF
  • Size: 18.1MB
  • Number of Pages: 244

Description

  • Model List:

    • D375A-6 Bull Dozer
  • 1. COVER
  • 2. Preface
  • 3. CONTENTS
  • 4. Specifications
  • 5. Precautions for field assembly
  • 6. Disposal of removed parts
  • 7. Assembly procedure, necessary equipment, and schedule
  • 8. Layout of kit
  • 9. Style for transportation
  • 10. Table of tools for field assembly
  • 11. Tightening torque
  • 12. Coating materials list
  • 13. Selection of wire ropes used for assembly
  • 14. Assembly
  • 14.1. A1 Installation of chassis
  • 14.2. A2 Installation of undercarriage
  • 14.3. A3 Adding oil to recoil chamber and pivot chamber
  • 14.4. A4.1 Installation of engine air inlet hood
  • 14.5. A4.2 Installation of engine air precleaner (if equipped)
  • 14.6. A5 Installing direction of exhaust pipe
  • 14.7. A6 Installation of highmount head lamp (if equipped)
  • 14.8. A7 Installation of blade lift cylinder
  • 14.9. A8 Installation of cylinder yoke grease hose (if equipped)
  • 14.10. A9 Installation of ripper
  • 14.11. A10 Installation of right and left service center boxes at rear of fenders (if equipped)
  • 14.12. A11 Installation of grease hose of ripper pin (if equipped)
  • 14.13. A12 Installation of track
  • 14.14. A13 Assembly of blade
  • 14.15. A14 Installation of grease hose of blade joint (if equipped)
  • 14.16. A15 Installation of blade
  • 14.17. A16 Installation of operators cab
  • 14.18. A17 Installation of rear monitor camera (if equipped)
  • 14.19. A18 Installation of additional cab lights (if equipped)
  • 14.20. A19 Installation of ROPS guard
  • 14.21. A20 Installation of VHMS, ORBCOMM antenna (if equipped)
  • 14.22. A21 Installation of platform (if equipped)
  • 14.23. A22 Check track tension
  • 14.24. A23 Check fuel, coolant and lubricants
  • 14.25. A24 Bleeding air from hydraulic cylinders
  • 14.26. A25 Lubricating
  • 14.27. A26 Installation of fuel quick charge piping (if equipped)
  • 15. Check and maintenance procedures after completion of assembly
  • 15.1. M1 Check and adjustment of operators cab
  • 15.2. M2 Inspection of machine monitor
  • 15.3. M3 Checking operation of dual tilt mechanism (If equipped)
  • 15.4. M4 Setting procedure for USER ADJUST MODE
  • 15.5. M5 Setting procedure for maximum cooling fan speed
  • 15.6. M6 Check of engine emergency stop switch
  • 15.7. M7 Check of operation of lamps
  • 15.8. M8 Replacement of return filter (Replacement of standard filter > special flushing parts)
  • 15.9. M9 Flushing of hydraulic circuit, and bleeding air from hydraulic cylinders (Part 1)
  • 15.10. M10 Replacement of return filter (Replacement of special flushing parts > standard filter)
  • 15.11. M11 Bleeding air from hydraulic cylinders (Part 2)
  • 16. APPENDIX 1. Installation procedure for spill guard (Installation by welding)
  • 17. APPENDIX 2. Precautions for initialization procedures for VHMS controller
  • 18. Field assembly inspection report
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu D375A-6 Bull Dozer Field Assembly Instruction GEN00099-08”

Your email address will not be published. Required fields are marked *