Description
-
Model List:
- D375A-6 Bull Dozer
- 1. COVER
- 1.1. FOREWORD
- 1.1.1. BEFORE READING THIS MANUAL
- 1.1.2. SAFETY INFORMATION
- 1.1.3. INTRODUCTION
- 1.1.3.1. USE OF MACHINE
- 1.1.3.2. FRONT/REAR, LEFT/RIGHT DIRECTIONS OF MACHINE
- 1.1.3.3. VISIBILITY FROM OPERATORS SEAT
- 1.1.4. NECESSARY INFORMATION
- 1.1.4.1. PRODUCT IDENTIFICATION NUMBER (PIN), MACHINE SERIAL NO. PLATE
- 1.1.4.2. EPA REGULATIONS, ENGINE NUMBER PLATE
- 1.1.4.3. BLADE SERIAL NO. PLATE POSITION
- 1.1.4.4. RIPPER SERIAL NO. PLATE POSITION
- 1.1.4.5. ROPS, FOPS NO. PLATE POSITION
- 1.1.4.6. POSITION OF SERVICE METER
- 1.1.4.7. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
- 1.1.5. CONTENTS
- 1.2. SAFETY
- 1.2.1. SAFETY
- 1.2.2. SAFETY LABELS
- 1.2.2.1. POSITIONS OF SAFETY PICTOGRAMS
- 1.2.2.2. SAFETY LABELS
- 1.2.2.3. GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
- 1.2.2.3.1. PRECAUTIONS BEFORE STARTING OPERATION
- 1.2.2.3.2. PREPARATIONS FOR SAFE OPERATION
- 1.2.2.3.3. FIRE PREVENTION
- 1.2.2.3.4. PRECAUTIONS WHEN GETTING ON OR OFF MACHINE
- 1.2.2.3.5. DO NOT GET CAUGHT IN WORK EQUIPMENT
- 1.2.2.3.6. PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
- 1.2.2.3.7. UNAUTHORIZED MODIFICATION
- 1.2.2.3.8. PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
- 1.2.2.3.9. PRECAUTIONS WHEN RUNNING ENGINE INSIDE BUILDING
- 1.2.2.4. PRECAUTIONS FOR OPERATION
- 1.2.2.4.1. PRECAUTIONS FOR JOBSITE
- 1.2.2.4.2. STARTING ENGINE
- 1.2.2.4.3. OPERATION
- 1.2.2.4.4. TRANSPORTATION
- 1.2.2.4.5. TOWING
- 1.2.2.5. PRECAUTIONS FOR MAINTENANCE
- 1.2.2.5.1. PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
- 1.2.2.5.2. PRECAUTIONS FOR INSPECTION AND MAINTENANCE
- 1.3. OPERATION
- 1.3.1. GENERAL VIEW
- 1.3.1.1. GENERAL VIEW OF MACHINE
- 1.3.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
- 1.3.2. EXPLANATION OF COMPONENTS
- 1.3.2.1. MACHINE MONITOR
- 1.3.2.2. SWITCHES
- 1.3.2.3. CONTROL LEVERS, PEDALS
- 1.3.2.4. DUST INDICATOR
- 1.3.2.5. POWER SOURCE
- 1.3.2.6. FUSE BOX
- 1.3.2.7. DOOR OPEN LOCK
- 1.3.2.8. SASH GLASS INTERMEDIATE LOCK
- 1.3.2.9. CAP WITH LOCK
- 1.3.2.10. DOOR POCKET
- 1.3.2.11. ASHTRAY
- 1.3.2.12. TOOL BOX
- 1.3.2.13. HANDLING CAB HEATER
- 1.3.2.14. HANDLING OF ADDITIONAL CAB HEATER
- 1.3.2.15. BATTERY DISCONNECT SWITCH
- 1.3.2.16. HANDLING ENGINE SIDE COVER, ENGINE ROOM QUILTING, RADIATOR SHUTTER
- 1.3.2.17. HANDLING INSPECTION LAMP
- 1.3.2.18. EXTERNAL POWER SUPPLY ENGINE PREHEATER
- 1.3.2.19. HANDLING OF ONBOARD COMBUSTION PREHEATER
- 1.3.3. OPERATION
- 1.3.3.1. CHECK BEFORE STARTING ENGINE, ADJUST
- 1.3.3.2. STARTING ENGINE
- 1.3.3.3. OPERATIONS AND CHECKS AFTER STARTING ENGINE
- 1.3.3.4. STOPPING ENGINE
- 1.3.3.5. MOVING MACHINE
- 1.3.3.6. STOPPING MACHINE
- 1.3.3.7. SHIFTING GEAR
- 1.3.3.8. SHIFTING BETWEEN FORWARD AND REVERSE
- 1.3.3.9. STEERING MACHINE
- 1.3.3.10. PRECAUTIONS FOR OPERATION
- 1.3.3.11. PARKING MACHINE
- 1.3.3.12. CHECK AFTER STOPPING ENGINE
- 1.3.3.13. CHECK AFTER FINISHING WORK
- 1.3.3.14. LOCKING
- 1.3.3.15. WORK POSSIBLE USING BULLDOZER
- 1.3.3.16. RECOMMENDED MODE FOR EACH TYPE OF OPERATION
- 1.3.3.17. RIPPER OPERATION
- 1.3.3.18. OPERATING METHOD FOR RIPPING OPERATIONS
- 1.3.3.19. ADJUSTING POSTURE OF WORK EQUIPMENT
- 1.3.3.20. TIPS FOR LONGER UNDERCARRIAGE LIFE
- 1.3.4. TRANSPORTATION
- 1.3.4.1. TRANSPORTATION PROCEDURE
- 1.3.4.2. LOADING, UNLOADING WORK
- 1.3.4.3. METHOD OF LIFTING MACHINE
- 1.3.4.4. TRAVELING ON ROADS
- 1.3.4.5. REMOVAL OF CAB
- 1.3.4.6. INSTALLATION OF CAB
- 1.3.4.7. INSTALLATION OF ROPS
- 1.3.5. COLD WEATHER OPERATION
- 1.3.5.1. PRECAUTIONS FOR LOW TEMPERATURE
- 1.3.5.2. AFTER COMPLETION OF WORK
- 1.3.5.3. AFTER COLD WEATHER
- 1.3.6. LONGTERM STORAGE
- 1.3.6.1. BEFORE STORAGE
- 1.3.6.2. DURING STORAGE
- 1.3.6.3. AFTER STORAGE
- 1.3.6.4. STARTING MACHINE AFTER LONGTERM STORAGE
- 1.3.7. TROUBLESHOOTING
- 1.3.7.1. AFTER RUNNING OUT OF FUEL
- 1.3.7.2. METHOD OF TOWING MACHINE
- 1.3.7.3. IF BATTERY IS DISCHARGED
- 1.3.7.4. OTHER TROUBLE
- 1.4. MAINTENANCE
- 1.4.1. GUIDES TO MAINTENANCE
- 1.4.2. OUTLINES OF SERVICE
- 1.4.2.1. HANDLING OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
- 1.4.2.2. OUTLINE OF ELECTRIC SYSTEM
- 1.4.2.3. HANDLING HYDRAULIC RELATED EQUIPMENT
- 1.4.3. WEAR PARTS
- 1.4.3.1. WEAR PARTS LIST
- 1.4.4. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
- 1.4.4.1. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
- 1.4.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
- 1.4.5.1. TORQUE LIST
- 1.4.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
- 1.4.6.1. SAFETY CRITICAL PARTS
- 1.4.7. MAINTENANCE SCHEDULE CHART
- 1.4.7.1. MAINTENANCE SCHEDULE CHART
- 1.4.8. SERVICE PROCEDURE
- 1.4.8.1. INITIAL 250 HOURS SERVICE (ONLY AFTER THE FIRST 250 HOURS)
- 1.4.8.2. WHEN REQUIRED
- 1.4.8.3. CHECK BEFORE STARTING
- 1.4.8.4. EVERY 250 HOURS SERVICE
- 1.4.8.5. EVERY 500 HOURS SERVICE
- 1.4.8.6. EVERY 1000 HOURS SERVICE
- 1.4.8.7. EVERY 2000 HOURS SERVICE
- 1.4.8.8. EVERY 4000 HOURS SERVICE
- 1.4.8.9. EVERY 8000 HOURS SERVICE
- 1.5. SPECIFICATIONS
- 1.5.1. SPECIFICATIONS
- 1.6. ATTACHMENTS, OPTIONS
- 1.6.1. GENERAL PRECAUTIONS
- 1.6.1.1. PRECAUTIONS RELATED TO SAFETY
- 1.6.2. SELECTION OF TRACK SHOE
- 1.6.2.1. SELECTION OF TRACK SHOES
- 1.6.3. PROCEDURE FOR SELECTING RIPPER POINT
- 1.6.3.1. PROCEDURE FOR SELECTING RIPPER POINT
- 1.6.4. EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
- 1.6.4.1. BLADE CONDITION
- 1.6.4.2. DOZING WORK
- 1.6.4.3. LEVELING (SPREADING) OPERATION
- 1.6.4.4. DITCHING OPERATION
- 1.6.4.5. BOULDER RAISING OPERATION
- 1.6.4.6. SIDECUTTING OPERATIONS
- 1.6.4.7. HORIZONTAL DOZING OPERATIONS FROM SIDE SLOPE (ROUGH GROUND)
- 1.7. INDEX
















There are no reviews yet.