Description
-
Model List:
- HD325-7R Dump Truck
- HD405-7R Dump Truck
- 1. Cover
- 2. Outline of division (Only main components)
- 3. Dimensions of main components
- 4. Rough schedule of assembly and welding
- 5. List of equipments, tools, and consumables
- 6. Assembly process No.
- 6.1. Oil, grease, and coolant
- 6.2. Levels of oil, grease, and coolant
- 6.3. Slinging bare machine
- 6.4. Positioning bare machine
- 6.5. Assembly of tire and wheel assembly
- 6.6. Installing tire and wheel assembly
- 6.7. Installing rear tire valve extension
- 6.8. Installing rear monitor
- 6.9. Installing L.H platform
- 6.10. Installing L.H handrail
- 6.11. Installing radio antenna and fixing its cable
- 6.12. Installing side view mirrors
- 6.13. Installing under view mirrors (For general overseas countries)
- 6.14. Installing under view mirrors (For EU)
- 6.15. Installing left side mudguard
- 6.16. Installing right side mudguard
- 6.17. Preparation of installing body
- 6.18. Welding body
- 6.19. Installing 150mm body spill guard (If equipped)
- 6.20. Installing 250mm body spill guard (If equipped)
- 6.21. Installing platform guard
- 6.22. Slinging body
- 6.23. Installing body hinge pin
- 6.24. Installing hoist cylinder
- 6.25. Installing body shim
- 6.26. Adjusting body shims
- 6.27. Installing muffler flange
- 6.28. Installing body accessories
- 6.29. Connecting dump sensor
- 6.30. Procedure for adjusting dump sensor
- 6.31. Calibrating dump control
- 6.32. Greasing
- 6.33. Touching up
- 6.34. Adjusting suspension
- 6.35. Sticking body decal
- 6.36. Adjustment of view range in mirror (For EU)
- 6.37. Adjustment of view range in mirror (For general overseas countries)
- 6.38. Check and addition of lubricants (1/2)
- 6.39. Check and addition of lubricants (2/2)
- 6.40. Check of inflation pressure of tires and inflation of them
- 6.41. C0010 Preparation of welding body
- 6.42. C0020 Assembly of split body
- 6.43. C0030 Tack welding body
- 6.44. C0040 Welding body
- 6.45. C0050 Welding body instruction (1/2)
- 6.46. C0060 Welding body instruction (2/2)
- 6.47. C0070 Turn over the body
- 6.48. C0080 Welding body protector (1/2)
- 6.49. C0090 Welding body protector (2/2)
- 6.50. C0100 Finishing and painting welded parts of body
- 7. Field assembly inspection report