Komatsu PC1250-11R, PC1250SP-11R Hydraulic Excavator Operation and Maintenance Manual PEN01457-03

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: PEN01457-03
  • Format: PDF
  • Size: 20.6MB
  • Number of Pages: 527

Description

  • Model List:

    • PC1250-11R Hydraulic Excavator
    • PC1250SP-11R Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 2.1. CONTENTS
  • 2.2. READ THIS MANUAL
  • 2.3. SAFETY INFORMATION
  • 2.4. INTRODUCTION
  • 2.4.1. MAIN USE OF MACHINE
  • 2.4.2. DIRECTIONS OF MACHINE
  • 2.4.3. VISIBILITY FROM OPERATORS SEAT
  • 2.5. PRODUCT INFORMATION
  • 2.5.1. LOCATION OF PRODUCT IDENTIFICATION NUMBER (PIN)/MACHINE SERIAL NO. PLATE
  • 2.5.2. LOCATION OF ENGINE NUMBER PLATE
  • 2.5.3. SERVICE METER LOCATION
  • 2.5.4. YOUR MACHINE SERIAL NUMBERS AND DISTRIBUTOR
  • 2.6. ABBREVIATION LIST
  • 3. SAFETY
  • 3.1. SAFETY LABELS
  • 3.1.1. LOCATION OF SAFETY LABELS
  • 3.1.2. CONTENTS OF SAFETY LABELS
  • 3.2. GENERAL PRECAUTIONS COMMON TO OPERATION AND MAINTENANCE
  • 3.2.1. PRECAUTIONS BEFORE STARTING OPERATION
  • 3.2.2. PREPARATIONS FOR SAFE OPERATION
  • 3.2.3. PRECAUTIONS TO PREVENT FIRE
  • 3.2.4. PRECAUTIONS WHEN GETTING ON OR OFF MACHINE
  • 3.2.5. DO NOT GET CAUGHT IN WORK EQUIPMENT
  • 3.2.6. PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES
  • 3.2.7. PROTECTION AGAINST FALLING, FLYING OR INTRUDING OBJECTS
  • 3.2.8. UNAUTHORIZED MODIFICATION
  • 3.2.9. PRECAUTIONS RELATED TO ATTACHMENTS AND OPTIONS
  • 3.2.10. PRECAUTIONS RELATED TO CAB GLASS
  • 3.2.11. PRECAUTIONS WHEN RUNNING ENGINE INSIDE BUILDING
  • 3.3. PRECAUTIONS FOR OPERATION
  • 3.3.1. PRECAUTIONS FOR JOBSITE
  • 3.3.2. START ENGINE
  • 3.3.3. PRECAUTIONS FOR OPERATION
  • 3.3.4. PRECAUTIONS FOR TRANSPORTATION
  • 3.3.5. TOWING AND BEING TOWED
  • 3.3.6. LIFTING OPERATION BY USING BUCKET WITH HOOK
  • 3.4. PRECAUTIONS FOR MAINTENANCE
  • 3.4.1. PRECAUTIONS BEFORE STARTING INSPECTION AND MAINTENANCE
  • 3.4.2. PRECAUTIONS FOR CHECK AND MAINTENANCE
  • 4. OPERATION
  • 4.1. GENERAL VIEW
  • 4.1.1. MACHINE EQUIPMENT NAME
  • 4.1.2. CAB EQUIPMENT NAMES
  • 4.1.3. CONTROLS AND GAUGES NAMES
  • 4.2. EXPLANATION OF COMPONENTS
  • 4.2.1. MACHINE MONITOR EQUIPMENT
  • 4.2.2. SWITCHES
  • 4.2.3. CONTROL LEVERS AND PEDALS
  • 4.2.4. OTHER EQUIPMENT
  • 4.3. MACHINE OPERATIONS AND CONTROLS
  • 4.3.1. CHECKS AND ADJUSTMENT BEFORE STARTING ENGINE
  • 4.3.2. METHOD FOR STARTING ENGINE
  • 4.3.3. METHOD FOR OPERATIONS AND CHECKS AFTER STARTING ENGINE
  • 4.3.4. STOP ENGINE
  • 4.3.5. METHOD FOR STARTING MACHINE (TRAVEL FORWARD AND REVERSE) AND STOPPING MACHINE
  • 4.3.6. METHOD FOR STEERING MACHINE
  • 4.3.7. METHOD FOR SWINGING MACHINE
  • 4.3.8. OPERATE WORK EQUIPMENT
  • 4.3.9. HANDLE WORKING MODE
  • 4.3.10. PROHIBITED OPERATIONS
  • 4.3.11. PRECAUTIONS FOR OPERATION
  • 4.3.12. PRECAUTIONS FOR WORKING ON SLOPE
  • 4.3.13. METHOD FOR ESCAPING FROM MUD
  • 4.3.14. RECOMMENDED APPLICATIONS
  • 4.3.15. EFFECTIVE USE OF HYDRAULIC EXCAVATOR
  • 4.3.16. METHOD FOR CHANGING BUCKET
  • 4.3.17. METHOD FOR PARKING MACHINE
  • 4.3.18. METHOD FOR CHECKING AFTER FINISHING WORK
  • 4.3.19. LOCK
  • 4.4. HANDLE AIR CONDITIONER
  • 4.4.1. EXPLANATION OF AIR CONDITIONER EQUIPMENT
  • 4.4.2. METHOD FOR OPERATING AIR CONDITIONER
  • 4.5. HANDLING RADIO
  • 4.5.1. EXPLANATION OF RADIO EQUIPMENT
  • 4.5.2. METHOD FOR CONTROLLING RADIO
  • 4.5.3. STOW ANTENNA
  • 4.6. KomVision
  • 4.6.1. PRECAUTIONS WHEN USING KomVision
  • 4.6.2. MONITOR DISPLAY
  • 4.7. HANDLE ANCHOR POINT FOR TIEOFF
  • 4.8. TRANSPORTATION
  • 4.8.1. PRECAUTIONS FOR TRANSPORTING MACHINE
  • 4.8.2. SELECT TRANSPORTATION METHOD
  • 4.8.3. LIFT MACHINE
  • 4.8.4. PRECAUTIONS FOR LOADING MACHINE
  • 4.8.5. MACHINE CONFIGURATION FOR TRANSPORTATION
  • 4.9. COLD WEATHER OPERATION
  • 4.9.1. COLD WEATHER OPERATION INFORMATION
  • 4.9.2. PRECAUTIONS AFTER DAILY WORK COMPLETION IN COLD WEATHER
  • 4.9.3. AFTER COLD WEATHER SEASON
  • 4.10. PRECAUTIONS FOR LONGTERM STORAGE
  • 4.10.1. PREPARATION FOR LONGTERM STORAGE
  • 4.10.2. MAINTENANCE DURING LONGTERM STORAGE
  • 4.10.3. STARTING MACHINE AFTER LONGTERM STORAGE
  • 4.11. TROUBLES AND ACTIONS
  • 4.11.1. ACTIONS WHEN RUNNING OUT OF FUEL
  • 4.11.2. PHENOMENA THAT ARE NOT FAILURES
  • 4.11.3. PRECAUTIONS FOR TOWING MACHINE
  • 4.11.4. PRECAUTIONS FOR SEVERE JOB CONDITION
  • 4.11.5. PRECAUTIONS FOR DISCHARGED BATTERY
  • 4.11.6. OTHER TROUBLE
  • 5. MAINTENANCE
  • 5.1. PRECAUTIONS FOR MAINTENANCE
  • 5.1.1. CHECK SERVICE METER READING
  • 5.1.2. KOMATSU GENUINE REPLACEMENT PARTS
  • 5.1.3. KOMATSU GENUINE LUBRICANTS
  • 5.1.4. ALWAYS USE CLEAN WASHER FLUID
  • 5.1.5. FRESH AND CLEAN LUBRICANTS
  • 5.1.6. CHECK DRAINED OIL AND USED FILTER
  • 5.1.7. PRECAUTIONS FOR REFILLING OIL OR FUEL
  • 5.1.8. PRECAUTIONS FOR WELDING
  • 5.1.9. DO NOT DROP THINGS INSIDE MACHINE
  • 5.1.10. DUSTY JOBSITES
  • 5.1.11. AVOID MIXING OIL
  • 5.1.12. LOCK INSPECTION COVERS
  • 5.1.13. BLEED AIR FROM HYDRAULIC CIRCUIT
  • 5.1.14. PRECAUTIONS WHEN INSTALLING HYDRAULIC HOSES
  • 5.1.15. CHECKS AFTER INSPECTION AND MAINTENANCE
  • 5.1.16. FUEL AND LUBRICANTS TO MATCH THE AMBIENT TEMPERATURE
  • 5.2. OUTLINE OF MAINTENANCE
  • 5.2.1. HANDLE OIL, FUEL, COOLANT, AND PERFORMING OIL CLINIC
  • 5.2.2. HANDLE ELECTRICAL COMPONENTS
  • 5.3. STANDARD TIGHTENING TORQUE FOR BOLTS AND NUTS
  • 5.4. MAINTENANCE SCHEDULE
  • 5.4.1. MAINTENANCE SCHEDULE TABLE
  • 5.5. MAINTENANCE PROCEDURE
  • 5.5.1. INITIAL 100 HOURS MAINTENANCE (ONLY AFTER THE FIRST 100 HOURS)
  • 5.5.2. INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500 HOURS)
  • 5.5.3. WHEN REQUIRED
  • 5.5.4. CHECK BEFORE YOU START OPERATION
  • 5.5.5. EVERY 10 HOURS MAINTENANCE
  • 5.5.6. EVERY 100 HOURS MAINTENANCE
  • 5.5.7. EVERY 250 HOURS MAINTENANCE
  • 5.5.8. EVERY 500 HOURS MAINTENANCE
  • 5.5.9. EVERY 1000 HOURS MAINTENANCE
  • 5.5.10. EVERY 2000 HOURS MAINTENANCE
  • 5.5.11. EVERY 4000 HOURS MAINTENANCE
  • 5.5.12. EVERY 5000 HOURS MAINTENANCE
  • 5.5.13. EVERY 8000 HOURS MAINTENANCE
  • 5.5.14. EVERY 6 MONTHS MAINTENANCE
  • 6. SPECIFICATIONS
  • 6.1. SPECIFICATIONS
  • 6.1.1. SPECIFICATIONS PC125011R
  • 6.1.2. SPECIFICATIONS PC1250SP11R
  • 7. ATTACHMENTS AND OPTIONS
  • 7.1. PRECAUTIONS FOR USING ATTACHMENT AND OPTIONS
  • 7.1.1. PRECAUTIONS WHEN SELECTING
  • 7.1.2. READ THE OPERATION AND MAINTENANCE MANUAL THOROUGHLY
  • 7.1.3. PRECAUTIONS WHEN REMOVING AND INSTALLING
  • 7.1.4. PRECAUTIONS FOR USING
  • 7.2. ATTACHMENTS AND OPTIONS
  • 7.2.1. INSTALL ATTACHMENT
  • 7.2.2. TRACK SHOES SELECTION
  • 7.3. HANDLE AUTOGREASING SYSTEM
  • 7.3.1. EXPLANATION OF COMPONENTS IN AUTOMATIC GREASE SYSTEM
  • 7.3.2. GREASING POINTS FOR AUTOGREASING SYSTEM
  • 7.3.3. MACHINE OPERATIONS AND CONTROLS
  • 7.3.4. TROUBLES AND ACTIONS
  • 7.3.5. CHECK AND MAINTENANCE
  • 7.4. HANDLE THE HYDRAULICALLY OPERATED STAIRWAY
  • 7.4.1. PROCEDURE TO OPERATE HYDRAULIC TYPE STAIRWAY
  • 7.4.2. ACTIONS IF MACHINE DOES NOT MOVE BY PROXIMITY SWITCH FAILURE ETC
  • 7.4.3. METHOD FOR CHECKING AND ADJUSTING PROXIMITY SWITCH
  • 7.4.4. ACTIONS IF PROXIMITY SWITCH HAS FAILED
  • 7.5. RADIO(Bluetooth)
  • 7.5.1. RADIO EQUIPMENT
  • 7.5.2. OPERATE RADIO
  • 7.5.3. RADIO SETTING
  • 8. MACHINE WITH LOADING SHOVEL SPECIFICATION
  • 8.1. EXPLANATION OF COMPONENTS
  • 8.1.1. SWITCHES
  • 8.1.2. HANDLE ANCHOR POINT FOR TIEOFF
  • 8.2. MACHINE OPERATIONS AND CONTROLS
  • 8.2.1. METHOD FOR OPERATING WORK EQUIPMENT
  • 8.2.2. PRECAUTIONS DURING OPERATION
  • 8.3. RECOMMENDED APPLICATIONS
  • 8.3.1. DIGGING WORK
  • 8.3.2. LOADING WORK
  • 8.4. PRECAUTIONS WHEN YOU DISASSEMBLE MACHINE
  • 8.4.1. RELEASE PRESSURE
  • 8.5. PERIODIC MAINTENANCE
  • 8.5.1. CHECKS BEFORE STARTING
  • 8.5.2. METHOD FOR CHECKING OIL LEVEL IN HYDRAULIC TANK, ADDING OIL
  • 8.6. EVERY 10 HOURS MAINTENANCE
  • 8.6.1. LUBRICATION
  • 8.7. EVERY 5000 HOURS MAINTENANCE
  • 8.7.1. METHOD FOR CHANGING OIL IN HYDRAULIC TANK, CLEANING HYDRAULIC TANK STRAINER
  • 8.8. EVERY 6 MONTHS MAINTENANCE
  • 8.8.1. CHECK ANCHOR POINT FOR TIEOFF
  • 8.9. SPECIFICATIONS PC125011R
  • 8.10. COMBINATION OF WORK EQUIPMENT
  • 8.10.1. WORKING RANGE DRAWINGS PC125011R
  • 9. REPLACEMENT PARTS
  • 9.1. DEFINED LIFE PARTS
  • 9.1.1. DEFINED LIFE PARTS LIST
  • 9.2. CONSUMABLE PARTS
  • 9.2.1. CONSUMABLE PARTS LIST
  • 9.3. RECOMMENDED FUEL, COOLANT, AND LUBRICANT
  • 9.3.1. LUBRICATION CHART
  • 9.3.2. USE OF FUEL, COOLANT AND LUBRICANTS TO ACCORDING TO AMBIENT TEMPERATURE
  • 9.3.3. RECOMMENDED BRANDS AND QUALITIES OTHER THAN KOMATSU GENUINE OILS
  • 10. INDEX
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC1250-11R, PC1250SP-11R Hydraulic Excavator Operation and Maintenance Manual PEN01457-03”

Your email address will not be published. Required fields are marked *