Description
-
Model List:
- PC5500E-6 Hydraulic Mining Shovel
- 1. SAFETY
- 1.1. SAFETY INFORMATION
- 1.2. OVERVIEW
- 1.3. SOUND PRESSURE LEVEL IN THE OPERATORS CAB.
- 1.4. GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR
- 1.5. PRECAUTION FOR MAINTENANCE
- 1.6. ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS
- 1.7. SPECIAL SAFETY EQUIPMENT
- 1.8. ADDITIONAL SAFETY PRECAUTIONS
- 2. GENERAL
- 2.1. GENERAL
- 2.2. ASSEMBLY SITE REQUIREMENTS
- 2.3. LIFTING OF THE MAIN COMPONENTS
- 2.4. GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES
- 3. ASSEMBLY SEQUENCE
- 3.1. ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
- 3.2. ASSEMBLY SEQUENCE OF BACKHOE MACHINES
- 3.3. ASSEMBLY OF UNDERCARRIAGE
- 3.4. MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE
- 3.5. MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM
- 3.6. MOUNTING OF HYDRAULIC ACCESS LADDER
- 3.7. PREASSEMBLY OF FACE SHOVEL BOOM
- 3.8. PREASSEMBLY OF BACKHOE BOOM
- 3.9. MOUNTING OF COUNTERWEIGHT
- 3.10. ATTACHING THE HIGH VOLTAGE SWITCH CABINET
- 3.11. ATTACHING THE CAB BASE
- 3.12. ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE
- 3.13. CONNECTING HIGH PRESSURE HOSES FROM MAIN PUMPS TO CHECK VALVES
- 3.14. ATTACHING INTERMEDIATE PIPE TO THE SUCTION OIL RESERVOIR
- 3.15. ATTACHING THE HYDRAULIC OIL RESERVOIR
- 3.16. ATTACHING THE HYDRAULIC OIL COOLER
- 3.17. CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT
- 3.18. ATTACHING THE HANDRAILS, CATWALKS AND STEPS
- 3.19. ATTACHING THE CENTRAL LUBRICATION UNIT
- 3.20. CENTRAL REFILLING SYSTEM
- 3.21. ATTACHING THE SERVICE CRANE (IF SO EQUIPPED)
- 3.22. PRECHECKS PRIOR TO INITIAL START UP
- 3.23. HIGH VOLTAGE INTERLOCK SYSTEM
- 3.24. CHECKING DIRECTION OF MOTOR ROTATION
- 3.25. CHECK AND ADJUST ALIGNMENT OF MAIN MOTORS
- 3.26. FILLING AND BLEEDING THE HYDRAULIC SYSTEM
- 3.27. BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION
- 3.28. ASSEMBLY FACE SHOVEL ATTACHMENT
- 3.29. BLEEDING HYDRAULIC CIRCUITS
- 3.30. ATTACHING FACE SHOVEL TO THE STICK
- 3.31. ASSEMBLY BACKHOE ATTACHMENT
- 3.32. BLEEDING HYDRAULIC CIRCUITS
- 3.33. ATTACHING BACKHOE BUCKET TO THE STICK
- 3.34. BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS
- 4. FINAL CHECKS AND ADJUSTMENTS
- 4.1. COMMISSIONING CHECK LIST
- 4.2. ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS
- 4.3. MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE
- 4.4. PRESSURE COMPENSATION OF SEALED COMPONENTS
- 4.5. FINAL ADJUSTMENT OF SLEW ANGLE WARNING SYSTEM
- 4.6. PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE
- 4.7. COMMISSIONING OF THE AIR CONDITIONING
- 4.8. PERFORM THE PMCLINIC PROCEDURE ACCORDING TO THE PMCLINIC PROCEDURE MANUAL
- 4.9. HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING
- 5. DISASSEMBLY OF THE MACHINE
- 5.1. SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE
- 5.2. GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM
- 5.3. DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES
- 5.4. DISASSEMBLY SEQUENCE OF BACKHOE MACHINES
- 5.5. DISPOSAL OF WASTE MATERIAL
- 5.6. LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
- 6. LIFTING AND TRANSPORTATION OF MAIN COMPONENTS
- 6.1. LIFTING OF THE MAIN COMPONENTS
- 6.2. TRANSPORTATION OF THE MAIN COMPONENTS
















Reviews
There are no reviews yet.