Komatsu PW180-7E0 Wheeled Excavator Operation and Maintenance Manual VEAM400101

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: VEAM400101
  • Format: PDF
  • Size: 10.4MB
  • Number of Pages: 402

Description

  • Model List:

    • PW180-7E0 Wheeled Excavator
  • 1. FOREWORD
  • 1.1. FOREWORD
  • 1.2. SAFETY INFORMATION
  • 1.2.1. SAFETY MESSAGES
  • 1.2.2. Noise emission levels
  • 1.2.3. Vibration levels
  • 1.2.4. EMERGENCY STEERING
  • 1.2.5. EMERGENCY BRAKING
  • 1.3. INTRODUCTION
  • 1.3.1. INTENDED USE
  • 1.3.2. FEATURES
  • 1.3.3. RUNNING IN YOUR NEW MACHINE
  • 1.4. LOCATIONS OF PLATES, TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 1.4.1. MACHINE SERIAL NO. PLATE POSITION
  • 1.4.2. ENGINE SERIAL NO. PLATE POSITION
  • 1.4.3. TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 1.4.4. MACHINE SERIAL PLATES
  • 2. SAFETY
  • 2.1. GENERAL PRECAUTIONS
  • 2.2. PRECAUTION DURING OPERATION
  • 2.2.1. BEFORE STARTING ENGINE
  • 2.2.2. OPERATING MACHINE
  • 2.2.3. TRANSPORTATION
  • 2.2.4. BATTERY
  • 2.2.5. TOWING
  • 2.2.6. BUCKET WITH HOOK OR BUCKET LINK WITH LIFTING EYE
  • 2.2.7. HANDLING OF FLUIDS
  • 2.3. PRECAUTIONS FOR MAINTENANCE
  • 2.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 2.3.2. DURING MAINTENANCE
  • 2.4. POSITION FOR ATTACHING SAFETY LABELS
  • 2.4.1. POSITION FOR ATTACHING SAFETY LABELS
  • 2.5. LIFTING CAPACITY CHART PW1807E0
  • 2.5.1. ONE PIECE BOOM Lift capacity tables for 2.5 metre undercarriage
  • 2.5.2. ONE PIECE BOOM Lift capacity tables for 2.75 metre undercarriage
  • 2.5.3. TWO PIECE BOOM Lift capacity tables for 2.5 metre undercarriage
  • 2.5.4. TWO PIECE BOOM Lift capacity tables for 2.75 metre undercarriage
  • 2.5.5. OVERLOAD CAUTION
  • 3. OPERATION
  • 3.1. GENERAL VIEW
  • 3.1.1. GENERAL VIEW OF MACHINE
  • 3.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 3.3. EXPLANATION OF COMPONENTS
  • 3.3.1. MACHINE MONITOR
  • 3.3.2. BASIC CHECK ITEMS
  • 3.4. SWITCHES
  • 3.4.1. STARTING SWITCH
  • 3.5. CONTROL LEVERS, PEDALS
  • 3.5.1. FRONT WINDOW
  • 3.5.2. EMERGENCY EXIT FROM OPERATORS CAB
  • 3.5.3. CAP, COVER WITH LOCK
  • 3.5.4. FUSE
  • 3.5.5. LUGGAGE TRAY
  • 3.5.6. ASHTRAY
  • 3.5.7. CUP HOLDER
  • 3.5.8. HOT AND COOL BOX
  • 3.5.9. CAB RADIO
  • 3.5.10. POWER PICKUP PORT
  • 3.5.11. HANDLING AIR CONDITIONER
  • 3.5.12. FUSIBLE LINK
  • 3.5.13. CONTROLLER
  • 3.5.14. TOOL BOX (CHASSIS)
  • 3.5.15. REFUELLING PUMP
  • 3.5.16. WARNING LAMPS
  • 3.5.17. HANDLING ACCUMULATORS
  • 3.6. OPERATION
  • 3.6.1. CHECK BEFORE STARTING ENGINE
  • 3.7. OPERATIONS AND CHECKS BEFORE STARTING ENGINE
  • 3.7.1. STARTING ENGINE
  • 3.7.2. MOVING MACHINE OFF
  • 3.7.3. STEERING
  • 3.7.4. TRAVELLING ON PUBLIC HIGHWAY
  • 3.7.5. STOPPING PARKING
  • 3.7.6. SWINGING (Slewing the upper carriage)
  • 3.7.7. OPERATION OF WORK EQUIPMENT
  • 3.7.8. WORKING MODE SELECTION
  • 3.7.9. PROHIBITIONS FOR OPERATION
  • 3.7.10. PRECAUTIONS FOR OPERATION
  • 3.7.11. RECOMMENDATIONS FOR TRAVELLING
  • 3.7.12. PRECAUTIONS WHEN TRAVELLING UP OR DOWN HILLS
  • 3.7.13. HOW TO ESCAPE FROM MUD
  • 3.7.14. WORK POSSIBLE USING HYDRAULIC EXCAVATOR
  • 3.7.15. REPLACEMENT AND INVERSION OF BUCKET
  • 3.7.16. STOPPING ENGINE
  • 3.7.17. CHECK AFTER FINISHING WORK
  • 3.8. CHECK AFTER STOPPING ENGINE
  • 3.8.1. LOCKING
  • 3.8.2. HANDLING THE WHEELS
  • 3.9. TRANSPORTATION
  • 3.9.1. TRANSPORTATION PROCEDURE
  • 3.9.2. LOADING, UNLOADING WORK
  • 3.9.3. SECURING MACHINE
  • 3.9.4. UNLOADING
  • 3.9.5. PRECAUTIONS FOR TRANSPORTATION
  • 3.9.6. TRAVELLING POSTURE
  • 3.10. COLD WEATHER OPERATION
  • 3.10.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 3.10.2. PRECAUTIONS AFTER COMPLETION OF WORK
  • 3.10.3. AFTER COLD WEATHER
  • 3.11. LONGTERM STORAGE
  • 3.11.1. BEFORE STORAGE
  • 3.11.2. DURING STORAGE
  • 3.11.3. AFTER STORAGE
  • 3.11.4. STARTING MACHINE AFTER LONGTERM STORAGE
  • 3.12. TROUBLESHOOTING
  • 3.12.1. PHENOMENA THAT ARE NOT FAILURES
  • 3.12.2. METHOD OF TOWING MACHINE
  • 3.12.3. PRECAUTIONS ON PARTICULAR JOBSITES
  • 3.12.4. DISCHARGED BATTERY
  • 3.12.5. OTHER TROUBLE
  • 4. MAINTENANCE
  • 4.1. GUIDES TO MAINTENANCE
  • 4.2. OUTLINE OF SERVICE
  • 4.2.1. OUTLINE OF OIL, FUEL, COOLANT
  • 4.2.2. OUTLINE OF ELECTRIC SYSTEM
  • 4.2.3. OUTLINE OF HYDRAULIC SYSTEM
  • 4.3. WEAR PARTS LIST
  • 4.4. USE FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 4.4.1. PROPER SELECTION OF FUEL, COOLANT AND LUBRICANTS
  • 4.5. RECOMMENDED BRANDS, RECOMMENDED QUALITY FOR PRODUCTS OTHER THAN KOMATSU GENUINE OIL
  • 4.6. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 4.6.1. INTRODUCTION OF NECESSARY TOOLS
  • 4.7. TIGHTENING TORQUE SPECIFICATIONS
  • 4.7.1. TIGHTENING TORQUE LIST
  • 4.8. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 4.8.1. SAFETY CRITICAL PARTS
  • 4.9. MAINTENANCE SCHEDULE CHART
  • 4.9.1. KEY TO LUBRICATION POINTS
  • 4.10. MAINTENANCE INTERVAL FOR HYDRAULIC BREAKER
  • 4.11. MAINTENANCE PROCEDURE
  • 4.11.1. INITIAL 50 HOURS MAINTENANCE (ONLY AFTER THE FIRST 50 HOURS)
  • 4.11.2. CHECK AND TIGHTEN WHEEL NUTS
  • 4.11.3. INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250 HOURS)
  • 4.11.4. INITIAL 500 HOURS MAINTENANCE (ONLY AFTER THE FIRST 500 HOURS)
  • 4.11.5. WHEN REQUIRED
  • 4.11.6. CHECKING COOLANT LEVEL
  • 4.11.7. CHECK AND TIGHTEN WHEEL NUTS
  • 4.11.8. CHECK ELECTRICAL INTAKE AIR HEATER
  • 4.11.9. CHECK ALTERNATOR
  • 4.11.10. REPLACE BUCKET SIDE CUTTERS
  • 4.11.11. REPLACE BUCKET TEETH
  • 4.11.12. ADJUST BUCKET CLEARANCE
  • 4.11.13. CHECK WINDOW WASHER FLUID LEVEL, ADD FLUID
  • 4.11.14. CHECK AND ADJUST AIR CONDITIONER
  • 4.11.15. CHECK BEFORE STARTING
  • 4.11.16. CHECK COOLANT LEVEL, ADD WATER
  • 4.11.17. EVERY 50 HOURS
  • 4.11.18. EVERY 100 HOURS SERVICE
  • 4.11.19. EVERY 250 HOURS MAINTENANCE
  • 4.11.20. EVERY 500 HOURS SERVICE
  • 4.11.21. EVERY 1000 HOURS SERVICE
  • 4.11.22. EVERY 2000 HOURS SERVICE
  • 4.11.23. EVERY 4000 HOURS MAINTENANCE
  • 4.11.24. EVERY 5000 HOURS SERVICE
  • 5. SPECIFICATIONS
  • 5.1. SPECIFICATIONS
  • 5.1.1. PIECE BOOM
  • 5.1.2. PIECE BOOM
  • 5.1.3. WORKING RANGE ONE PIECE BOOM
  • 5.1.4. WORKING RANGE TWO PIECE BOOM
  • 6. OPTIONS, ATTACHMENTS
  • 6.1. GENERAL PRECAUTIONS
  • 6.1.1. PRECAUTIONS RELATED TO SAFETY
  • 6.2. PRECAUTIONS WHEN INSTALLING ATTACHMENTS
  • 6.3. HYDRAULIC QUICK COUPLER PIPING
  • 6.3.1. LOCATIONS
  • 6.3.2. OPERATION
  • 6.4. HANDLING BUCKET WITH HOOK
  • 6.4.1. CHECKING FOR DAMAGE TO BUCKET WITH HOOK
  • 6.4.2. PROHIBITED OPERATIONS
  • 6.4.3. PRECAUTIONS DURING OPERATIONS
  • 6.5. MACHINES READY FOR ATTACHMENTS
  • 6.5.1. HANDLING THE CLAMSHELL BUCKET
  • 6.5.2. HYDRAULIC CIRCUIT
  • 6.5.3. OPERATION
  • 6.5.4. METHOD FOR RELEASING PRESSURE IN CONTROL CIRCUIT OF MACHINES EQUIPPED WITH ACCUMULATOR
  • 6.5.5. LONGTERM STORAGE
  • 6.6. INTRODUCTION OF ATTACHMENTS AND EXTENDING MACHINE SERVICE LIFE
  • 6.6.1. HYDRAULIC BREAKER
  • 6.6.2. POWER RIPPER
  • 6.6.3. FORK GRAB
  • 6.6.4. GRAPPLE BUCKET
  • 6.6.5. SCRAP GRAPPLE
  • 6.6.6. CRUSHER SMASHER
  • 6.6.7. HYDRAULIC PILE DRIVER
  • 6.6.8. HYDRAULIC EXCAVATOR WITH MULTIPURPOSE CRANE
  • 6.7. ROTATING ARM
  • 6.7.1. GENERAL LOCATION AND SPECIFICATIONS.
  • 6.7.2. MAINTENANCE REQUIREMENT
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu PW180-7E0 Wheeled Excavator Operation and Maintenance Manual VEAM400101”

Your email address will not be published. Required fields are marked *