Komatsu WA600-8 Wheel Loader Field Assembly Manual GEN00139-04

$30.00

  • Type Of Manual: Field Assembly Manual
  • Manual ID: GEN00139-04
  • Format: PDF
  • Size: 25.4MB
  • Number of Pages: 111

Description

  • Model List:

    • WA600-8 Wheel Loader
  • 1. Cover
  • 2. Parts overview
  • 3. Dimensions of main components
  • 4. Layout of work space
  • 5. Assembly general schedule
  • 6. Facility, jig and consumable parts list
  • 7. Oil, grease and paint
  • 8. Assembly procedure
  • 8.1. Oil, grease and coolant
  • 8.2. Amount of oil, grease and coolant
  • 8.3. Placing of bare machine (tireless specification)
  • 8.4. Placing the front axle, rear axle, and bare machine
  • 8.5. Installing the rear axle
  • 8.6. Installing the front axle
  • 8.7. Connecting the front axle through brake piping
  • 8.8. Connecting the front axle through drive shaft
  • 8.9. Connecting the grease tube/connector
  • 8.10. Connecting the brake tube piping
  • 8.11. Connecting the rear axle through drive shaft
  • 8.12. Installation of tire and rim assembly
  • 8.13. Installation of radio antenna
  • 8.14. Installation of KOMTRAX Plus antenna
  • 8.15. Installation of ORBCOMM antenna
  • 8.16. Removal of cab accessory
  • 8.17. Installation of cab (1)
  • 8.18. Removal of cab harness bracket
  • 8.19. Installation of cab (2) (AJSS specification)
  • 8.20. Installation of cab (2) (AJSS and steering wheel specification)
  • 8.21. Installation of cab (3)
  • 8.22. Installation of cab (4) (AJSS specification)
  • 8.23. nstallation of cab (6) (AJSS and steering wheel specification)
  • 8.24. Installation of cab harness (1)
  • 8.25. Installing the CAB wiring harness (tilt steering wheel specification) (1)
  • 8.26. Installation of cab harness (2)
  • 8.27. Installation of cab harness (3)
  • 8.28. Connection of washer hose
  • 8.29. Connection and fixing of KOMTRAX Plus harness
  • 8.30. Installation of A/C duct
  • 8.31. Installation of cab duct
  • 8.32. Installing the air conditioner BOX
  • 8.33. Installation of air conditioner box piping
  • 8.34. Installation of filter
  • 8.35. Installation of filter box cover
  • 8.36. Installation of duct lower cover
  • 8.37. Installation of duct cover
  • 8.38. Installation of utility box
  • 8.39. Installation of cab duct cover
  • 8.40. Installation of relay cover
  • 8.41. Fixing of ORBCOMM cable (ORBCOMM specification)
  • 8.42. Installation of rear right side cover
  • 8.43. Connection of cab ground
  • 8.44. Installing the CAB front undercover
  • 8.45. Installing the CAB rear undercover
  • 8.46. Installation of stacked muffler
  • 8.47. Installation of rear access ladder
  • 8.48. Installation of right access ladder
  • 8.49. Installation of L.H. hand rail
  • 8.50. Installation of R.H. hand rail
  • 8.51. Adjustment of rearview mirror
  • 8.52. Installing the additional working lamp (6XA04B LED additional wording lamp)
  • 8.53. Installation of boom and bell crank assembly(Preparation for connection of bucket cylinder)
  • 8.54. Installation of boom and bell crank assembly(Preparation for connection of lift cylinder)
  • 8.55. Installation of boom and bell crank assembly (1)
  • 8.56. Installation of boom and bell crank assembly (2)
  • 8.57. Installing the boom positioner
  • 8.58. Preparation for connection of bucket cylinder
  • 8.59. Installing the bucket cylinder (bellcrank side)
  • 8.60. Installing the front fender
  • 8.61. Installing the front light support and connecting it
  • 8.62. Installing the counterweight (standard specification)
  • 8.63. Installing the counterweight (850kg specification)
  • 8.64. Install pins (Standard specification)
  • 8.65. Installing the L.H. platform handrail
  • 8.66. Installation of fire extinguisher
  • 8.67. Attaching the CAB decal (4XB01, 4XB997279 3V)
  • 8.68. Check each part
  • 8.69. Air bleeding of work equipment hydraulic circuit and each cylinders
  • 8.70. Starting engine (1)
  • 8.71. Air bleeding of brake
  • 8.72. Preparation for installation of bucket
  • 8.73. Installation of bucket (1)
  • 8.74. Installation of bucket (2)
  • 8.75. Installation of autogreasing piping for bucket link (1)
  • 8.76. Installation of autogreasing piping for bucket link (2)
  • 8.77. Installation of autogreasing piping for bucket link (3)
  • 8.78. Greasing (1st time)
  • 8.79. Installation of floor mat (AJSS specification)
  • 8.80. Greasing (2nd time)
  • 8.81. Touch up work
  • 8.82. Default Monitor panel and switch
  • 8.83. Default Service menu
  • 8.84. Default Optional device selection
  • 8.85. Default Load meter unloaded adjustment
  • 8.86. Initialize Adjust boom angle
  • 8.87. Runningin
  • 8.88. Check tire pressure and inflate tire
  • 9. Appendix Machine check sheet for field assembly
Rate this product
Reviews

There are no reviews yet.

Be the first to review “Komatsu WA600-8 Wheel Loader Field Assembly Manual GEN00139-04”

Your email address will not be published. Required fields are marked *