Description
-
Model List:
- WA600-8E0 Wheel Loader
- 1. Cover
- 2. Parts overview
- 3. Dimensions of main components
- 4. Layout of work space
- 5. Assembly general schedule
- 6. Facility, jig and consumable parts list
- 7. Oil, grease and paint
- 8. Assembly procedure
- 8.1. Oil, grease and coolant
- 8.2. Amount of oil, grease and coolant
- 8.3. Placing of bare machine (tireless specification)
- 8.4. Placing the front axle, rear axle, and bare machine
- 8.5. Installing the rear axle
- 8.6. Installing the front axle
- 8.7. Connecting the front axle through brake piping
- 8.8. Connecting the front axle through drive shaft
- 8.9. Connecting the grease tube/connector
- 8.10. Connecting the brake tube piping
- 8.11. Connecting the rear axle through drive shaft
- 8.12. Installation of tire and rim assembly
- 8.13. Installation of radio antenna
- 8.14. Installation of KOMTRAX Plus antenna
- 8.15. Installation of ORBCOMM antenna
- 8.16. Removal of cab accessory
- 8.17. Installation of cab (1)
- 8.18. Removal of cab harness bracket
- 8.19. Installation of cab (2) (AJSS specification)
- 8.20. Installation of cab (2) (AJSS and steering wheel specification)
- 8.21. Installation of cab (3)
- 8.22. Installation of cab (4) (AJSS specification)
- 8.23. nstallation of cab (6) (AJSS and steering wheel specification)
- 8.24. Installation of cab harness (1)
- 8.25. Installing the CAB wiring harness (tilt steering wheel specification) (1)
- 8.26. Installation of cab harness (2)
- 8.27. Installation of cab harness (3)
- 8.28. Connection of washer hose
- 8.29. Connection and fixing of KOMTRAX Plus harness
- 8.30. Installation of A/C duct
- 8.31. Installation of cab duct
- 8.32. Installing the air conditioner BOX
- 8.33. Installation of air conditioner box piping
- 8.34. Installation of filter
- 8.35. Installation of filter box cover
- 8.36. Installation of duct lower cover
- 8.37. Installation of duct cover
- 8.38. Installation of utility box
- 8.39. Installation of cab duct cover
- 8.40. Installation of relay cover
- 8.41. Fixing of ORBCOMM cable (ORBCOMM specification)
- 8.42. Installation of rear right side cover
- 8.43. Connection of cab ground
- 8.44. Installing the CAB front undercover
- 8.45. Installing the CAB rear undercover
- 8.46. Installation of stacked muffler
- 8.47. Installation of rear access ladder
- 8.48. Installation of right access ladder
- 8.49. Installation of L.H. hand rail
- 8.50. Installation of R.H. hand rail
- 8.51. Adjustment of rearview mirror
- 8.52. Installing the additional working lamp (6XA04B LED additional wording lamp)
- 8.53. Installing the boom and bell crank assembly
- 8.54. Installing the boom positioner
- 8.55. Installing the bucket cylinder (bellcrank side)
- 8.56. Installing the front fender
- 8.57. Installing the front light support and connecting it
- 8.58. Installing the counterweight (standard specification)
- 8.59. Installing the counterweight (850kg specification)
- 8.60. Install pins (Standard specification)
- 8.61. Installing the L.H. platform handrail
- 8.62. Attaching the CAB decal (4XB01, 4XB997279 3V)
- 8.63. Check each part
- 8.64. Air bleeding of work equipment hydraulic circuit and each cylinders
- 8.65. Starting engine (1)
- 8.66. Air bleeding of brake
- 8.67. Installation of bucket (1)
- 8.68. Installation of bucket (2)
- 8.69. Installation of bucket (3)
- 8.70. Greasing (1st time)
- 8.71. Installation of floor mat (AJSS specification)
- 8.72. Greasing (2nd time)
- 8.73. Touch up work
- 8.74. Default Monitor panel and switch
- 8.75. Default Service menu
- 8.76. Default Optional device selection
- 8.77. Default Load meter unloaded adjustment
- 8.78. Initialize Adjust boom angle
- 8.79. Runningin
- 9. Appendix Machine check sheet for field assembly