Description
-
Model List:
- WD900-3 Wheel Dozer
- 1. COVER
- 2. CONTENTS
- 3. CHART OF SEPARATED UNITS
- 4. TRANSPORTATION BY LAND
- 5. ORDER FOR ASSEMBLY,FACILITIES TO USE,SCHEDULE FOR ASSEMBLY
- 6. WORK SPACE LAYOUT DIAGRAM
- 7. TOOLS AND EQUIPMENT TO USE
- 8. PROCEDURE FOR FIELD ASSEMBLY
- 8.1. ASSEMBLY PROCESS NO.
- 8.1.1. A1 SETTING BARE MACHINE ON SUPPORTS
- 8.1.2. A2 ASSEMBLY OF REAR AXLE
- 8.1.3. A3 ASSEMBLY OF FRONT AND REAR DRIVE SHAFT
- 8.1.4. A4 ASSEMBLY OF FRONT AXLE
- 8.1.5. A5 ASSEMBLY OF FUEL TANK
- 8.1.6. A6 ASSEMBLY OF LADDER
- 8.1.7. A7 ASSEMBLY OF FLOOR CAB ASSEMBLY
- 8.1.8. A8 ASSEMBLY OF HANDRAIL
- 8.1.9. A9 ASSEMBLY OF TIRE WHEEL ASSEMBLY
- 8.1.10. A10 ASSEMBLY OF BATTERY BOX ASSEMBLY
- 8.1.11. A10A ASSEMBLY OF COUNTERWEIGHT ASSEMBLY
- 8.1.12. A11 ASSEMBLY OF MUFFLER PIPE
- 8.1.13. A11A ASSEMBLY OF HANDRAILS REAR ACCESS STEP
- 8.1.14. A12 ASSEMBLY OF ADDITIONAL OIL COOLER
- 8.1.15. A13 ASSEMBLY OF FRONT FENDER
- 8.1.16. A14 ASSEMBLY OF FRONT LAMP ASSEMBLY
- 8.1.17. A15 ASSEMBLY OF ROPS CANOPY ASSEMBLY
- 8.1.18. A16 ASSEMBLY OF WORK EQUIPMENT
- 8.1.19. A17 ASSEMBLY OF FLOOR MAT
- 8.1.20. M1 BLEEDING AIR FROM BRAKE LINE
- 8.1.21. M2 GREASING WORK EQUIPMENT AND CHASSIS
- 8.1.22. M5 INSPECTION OF ALL PARTS
- 8.1.23. M6 PROCEDURE FOR STARTING ENGINE
- 8.1.24. M7 PROCEDURE FOR BLEEDING AIR FROM PISTON PUMP
- 8.1.25. M8 PROCEDURE FOR BLEEDING AIR FROM WORK EQUIPMENT HYDRAULIC CIRCUIT
- 9. FIELD ASSEMBLY INSPECTION REPORT
















Reviews
There are no reviews yet.