Komatsu WD900-3 Wheel Dozer Field Assembly Manual SEAW002500

$30.00

  • Type Of Manual: Field Assembly Manual
  • Manual ID: SEAW002500
  • Format: PDF
  • Size: 7.7MB
  • Number of Pages: 90

Description

  • Model List:

    • WD900-3 Wheel Dozer
  • 1. COVER
  • 2. CONTENTS
  • 3. CHART OF SEPARATED UNITS
  • 4. TRANSPORTATION BY LAND
  • 5. ORDER FOR ASSEMBLY,FACILITIES TO USE,SCHEDULE FOR ASSEMBLY
  • 6. WORK SPACE LAYOUT DIAGRAM
  • 7. TOOLS AND EQUIPMENT TO USE
  • 8. PROCEDURE FOR FIELD ASSEMBLY
  • 8.1. ASSEMBLY PROCESS NO.
  • 8.1.1. A1 SETTING BARE MACHINE ON SUPPORTS
  • 8.1.2. A2 ASSEMBLY OF REAR AXLE
  • 8.1.3. A3 ASSEMBLY OF FRONT AND REAR DRIVE SHAFT
  • 8.1.4. A4 ASSEMBLY OF FRONT AXLE
  • 8.1.5. A5 ASSEMBLY OF FUEL TANK
  • 8.1.6. A6 ASSEMBLY OF LADDER
  • 8.1.7. A7 ASSEMBLY OF FLOOR CAB ASSEMBLY
  • 8.1.8. A8 ASSEMBLY OF HANDRAIL
  • 8.1.9. A9 ASSEMBLY OF TIRE WHEEL ASSEMBLY
  • 8.1.10. A10 ASSEMBLY OF BATTERY BOX ASSEMBLY
  • 8.1.11. A10A ASSEMBLY OF COUNTERWEIGHT ASSEMBLY
  • 8.1.12. A11 ASSEMBLY OF MUFFLER PIPE
  • 8.1.13. A11A ASSEMBLY OF HANDRAILS REAR ACCESS STEP
  • 8.1.14. A12 ASSEMBLY OF ADDITIONAL OIL COOLER
  • 8.1.15. A13 ASSEMBLY OF FRONT FENDER
  • 8.1.16. A14 ASSEMBLY OF FRONT LAMP ASSEMBLY
  • 8.1.17. A15 ASSEMBLY OF ROPS CANOPY ASSEMBLY
  • 8.1.18. A16 ASSEMBLY OF WORK EQUIPMENT
  • 8.1.19. A17 ASSEMBLY OF FLOOR MAT
  • 8.1.20. M1 BLEEDING AIR FROM BRAKE LINE
  • 8.1.21. M2 GREASING WORK EQUIPMENT AND CHASSIS
  • 8.1.22. M5 INSPECTION OF ALL PARTS
  • 8.1.23. M6 PROCEDURE FOR STARTING ENGINE
  • 8.1.24. M7 PROCEDURE FOR BLEEDING AIR FROM PISTON PUMP
  • 8.1.25. M8 PROCEDURE FOR BLEEDING AIR FROM WORK EQUIPMENT HYDRAULIC CIRCUIT
  • 9. FIELD ASSEMBLY INSPECTION REPORT
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu WD900-3 Wheel Dozer Field Assembly Manual SEAW002500”

Your email address will not be published. Required fields are marked *