Komatsu PC02-1A Hydraulic Excavator Operation and Maintenance Manual SEAM005700

$30.00

  • Type Of Manual: Operation and Maintenance Manual
  • Manual ID: SEAM005700
  • Format: PDF
  • Size: 5.1MB
  • Number of Pages: 180

Description

  • Model List:

    • PC02-1A Hydraulic Excavator
  • 1. COVER
  • 2. FOREWORD
  • 3. SAFETY INFORMATION
  • 4. INTRODUCTION
  • 5. LOCATION OF PLATES,TABLE TO ENTER SERIAL NO. AND DISTRIBUTOR
  • 6. CONTENTS
  • 7. SAFETY
  • 7.1. GENERAL PRECAUTIONS
  • 7.2. PRECAUTIONS DURING OPERATION
  • 7.2.1. BEFORE STARTING ENGINE
  • 7.2.2. OPERATING MACHINE
  • 7.2.3. TRANSPORTATION
  • 7.2.4. BATTERY
  • 7.2.5. TOWING
  • 7.2.6. BUCKET WITH HOOK
  • 7.3. PRECAUTIONS FOR MAINTENANCE
  • 7.3.1. BEFORE CARRYING OUT MAINTENANCE
  • 7.3.2. DURING MAINTENANCE
  • 7.4. POSITION FOR ATTACHING SAFETY LABELS
  • 8. OPERATION
  • 8.1. GENERAL VIEW
  • 8.1.1. GENERAL VIEW OF MACHINE
  • 8.1.2. GENERAL VIEW OF CONTROLS AND GAUGES
  • 8.2. EXPLANATION OF COMPONENTS
  • 8.2.1. METERS,LAMPS
  • 8.2.2. SWITCHES
  • 8.2.3. CONTROL LEVERS,PEDALS
  • 8.2.4. ENGINE HOOD
  • 8.2.5. FUSE CASE
  • 8.3. OPERATION
  • 8.3.1. CHECK BEFORE STARTING ENGINE
  • 8.3.2. STARTING ENGINE
  • 8.3.3. OPERATION AND CHECK AFTER STARTING ENGINE
  • 8.3.4. MOVING MACHINE OFF
  • 8.3.5. STEERING MACHINE
  • 8.3.6. STOPPING MACHINE
  • 8.3.7. SWINGING
  • 8.3.8. OPERATION OF WORK EQUIPMENT
  • 8.3.9. PROHIBITIONS FOR OPERATION
  • 8.3.10. PRECAUTIONS FOR OPERATION
  • 8.3.11. PRECAUTIONS WHEN TRAVELING UP OR DOWN HILLS
  • 8.3.12. HOW TO ESCAPE FROM MUD
  • 8.3.13. WORK POSSIBLE USING HYDRAULIC EXCAVATOR
  • 8.3.14. REPLACEMENT OF BUCKET
  • 8.3.15. HANDLING RUBBER SHOES
  • 8.3.16. PARKING MACHINE
  • 8.3.17. CHECKS AFTER FINISHING WORK
  • 8.3.18. STOPPING ENGINE
  • 8.3.19. CHECKS AFTER STOPPING ENGINE
  • 8.4. TRANSPORTATION
  • 8.4.1. LOADING,UNLOADING WORK
  • 8.4.2. METHOD OF LIFTING MACHINE
  • 8.4.3. PRECAUTIONS FOR LOADING
  • 8.4.4. PRECAUTIONS FOR TRANSPORTATION
  • 8.5. COLD WEATHER OPERATION
  • 8.5.1. PRECAUTIONS FOR LOW TEMPERATURE
  • 8.5.2. PRECAUTIONS AFTER COMPLETION OF WORK
  • 8.5.3. AFTER COLD WEATHER
  • 8.6. LONGTERM STORAGE
  • 8.6.1. BEFORE STORAGE
  • 8.6.2. DURING STORAGE
  • 8.6.3. AFTER STORAGE
  • 8.7. TROUBLESHOOTING
  • 8.7.1. PHENOMENA THAT ARE NOT FAILURES
  • 8.7.2. METHOD OF TOWING MACHINE
  • 8.7.3. IF BATTERY IS DISCHARGED
  • 8.7.4. OTHER TROUBLE
  • 9. MAINTENANCE
  • 9.1. GUIDES TO MAINTENANCE
  • 9.2. OUTLINES OF SERVICE
  • 9.2.1. OUTLINE OF OIL,FUEL
  • 9.2.2. OUTLINE OF ELECTRIC SYSTEM
  • 9.2.3. OUTLINE OF HYDRAULIC SYSTEM
  • 9.3. WEAR PARTS LIST
  • 9.4. USE OF FUEL AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
  • 9.5. STANDARD TIGHTENING TORQUES FOR BOLTS AND NUTS
  • 9.5.1. INTRODUCTION OF NECESSARY TOOLS
  • 9.5.2. TORQUE LIST
  • 9.6. PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
  • 9.7. MAINTENANCE SCHEDULE CHART
  • 9.7.1. MAINTENANCE SCHEDULE CHART
  • 9.7.2. MAINTENANCE INTERVAL WHEN USING HYDRAULIC BREAKER
  • 9.8. SERVICE PROCEDURE
  • 9.8.1. INITIAL 20 HOURS SERVICE
  • 9.8.2. INITIAL 100 HOURS SERVICE
  • 9.8.3. INITIAL 500 HOURS SERVICE
  • 9.8.4. WHEN REQUIRED
  • 9.8.5. CHECK BEFORE STARTING
  • 9.8.6. EVERY 100 HOURS SERVICE
  • 9.8.7. EVERY 500 HOURS SERVICE
  • 9.8.8. EVERY 1000 HOURS SERVICE
  • 9.8.9. EVERY 2000 HOURS SERVICE
  • 10. SPECIFICATIONS
  • 10.1. SPECIFICATIONS
  • 11. OPTIONS,ATTACHMENTS
  • 11.1. GENERAL PRECAUTIONS
  • 11.1.1. PRECAUTIONS RELATED TO SAFETY
  • 11.2. INTRODUCTION OF OPTIONAL PARTS AND ATTACHMENTS
  • 11.2.1. SPECIFICATIONS,USES
  • 11.2.2. ATTACHMENTS INSTALLATION COMBINATION
  • 11.3. HANDLING BUCKET WITH HOOK
  • 11.3.1. CHECKING FOR DAMAGE TO BUCKET WITH HOOK
  • 11.3.2. PROHIBITED OPERATIONS
  • 11.3.3. PRECAUTIONS DURING OPERATIONS
Rate this product

Reviews

There are no reviews yet.

Be the first to review “Komatsu PC02-1A Hydraulic Excavator Operation and Maintenance Manual SEAM005700”

Your email address will not be published. Required fields are marked *