Description
-
Model List:
- PC500LC-8 Hydraulic Excavator
- PC500LC-8R Hydraulic Excavator
- 1. COVER
- 2. FOREWORD
- 3. Precautions for Field Assembly
- 4. Disposal of removed parts
- 5. Transportation
- 5.1. Introduction
- 5.2. State of SubAssembly Parts and Blank Cap Position for each Part
- 5.3. Implementation method before and after assembly
- 6. Fieldinstallation procedure
- 6.1. Attaching the boom cylinder
- 6.2. Attaching the boom assembly to the main body
- 6.3. Attaching the boom cylinder rod to the boom
- 6.4. Attaching the sound absorbing materials to the front of the weight
- 6.5. Attaching the weight
- 6.6. Attaching the arm to the boom
- 6.7. Connecting arm and bucket piping
- 6.8. Connect ing the arm cylinder.
- 6.9. Connecting the bucket bottom pipes.(Apply to 3.4m Arm)
- 6.10. Attaching the bucket
- 6.11. Attaching the mirrors and handrail
- 6.12. Installation of rear monitoring camera (Option)
- 6.13. Connection of the wiring of boom working lamp
- 6.14. Increasing of track frame gauge
- 6.15. Adjustment of track tension
- 6.16. Installation of steps
- 6.17. Greaseup
- 6.18. Check work equipment speed(Boom LOWER) and adjustment.
- 7. Machine equipped with attachment.
- 8. Weight list of each specification of PC500LC8,PC500LC8R
















Reviews
There are no reviews yet.